Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings (공동주택 하자보증금 청구소송의 연구)

  • Yoon, Hyung-In;Jo, Byung-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.2 s.24
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.

Calculation of Maintenance Cost for RCM Analysis of Railway Vehicle (철도차량의 RCM 분석을 위한 유지보수비용 산출방안)

  • Lee, Chang-Hwan;Park, Byoung-Noh;Lim, Sung-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1481-1486
    • /
    • 2008
  • To apply more effective the RCM analysis for railway vehicle, the maintenance cost per equipment should be considered together with failure criticality per equipment considered in existing. This paper is described the systematic calculation of maintenance cost considering the RCM analysis of railway vehicle. To calculate the maintenance cost systematically, the cost breakdown structure was established, and basic cost information and calculated cost items were defined. In addition, the linking between calculated cost and RCM analysis was considered. In future, this proposal would be used to analysis of cost effectiveness through RCM analysis of railway vehicle.

  • PDF

A Study on Insulation Characteristics by Thickness of Laminated Polypropylene Paper for an HTS Transmission Cable (송전급 HTS 케이블용 반합성지의 두께에 따른 절연특성 연구)

  • Choi, Jin-Wook;Choi, Jae-Hyeong;Kim, Hae-Jong;Cho, Jeon-Wook;Kim, Sang-Hyun
    • Progress in Superconductivity and Cryogenics
    • /
    • v.11 no.1
    • /
    • pp.35-38
    • /
    • 2009
  • The high temperature superconducting(HTS) power cable, as a key component of the next generation power transmission system, operates cost-effectively because of much less transmission loss. Currently, a world-wide research has been undertaken actively. In this research, we designed insulation thickness and investigated thickness effect of laminated polypropylene paper(LPP) which is insulation material of HTS cable in case of AC and impulse breakdown.

SE, CM, EVM 통합을 통한 사업 관리 향상 방안

  • Seok, Yeon-Suk;Gang, Seong-Jin;Park, In-Gyeong;Gwon, Yong-Su
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.1023-1029
    • /
    • 2007
  • 우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.

  • PDF

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

A Study on High Voltage SiC-IGBT Device Miniaturization (고내압 SiC-IGBT 소자 소형화에 관한 연구)

  • Kim, Sung-Su;Koo, Sang-Mo
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.26 no.11
    • /
    • pp.785-789
    • /
    • 2013
  • Silicon Carbide (SiC) is the material with the wide band-gap (3.26 eV), high critical electric field (~2.3 MV/cm), and high bulk electron mobility (~900 $cm^2/Vs$). These electronic properties allow attractive features, such as high breakdown voltage, high-speed switching capability, and high temperature operation compared to Si devices. In general, device design has a significant effect on the switching and electrical characteristics. It is known that in this paper, we demonstrated that the switching performance and breakdown voltage of IGBT is dependent with doping concentration of p-base region and drift layer by using 2-D simulations. As a result, electrical characteristics of SiC-IGBT deivce is higher breakdown voltage ($V_B$= 1,600 V), lower on-resistance ($R_{on}$= 0.43 $m{\Omega}{\cdot}cm^2$) than Si-IGBT. Also, we determined that processing time and cost is reduced by the depth of n-drift region of IGBT was reduced.

Electrical Properties of the Epoxy Nano-composites according to Additive

  • Shin, Jong-Yeol;Park, Hee-Doo;Choi, Kwang-Jin;Lee, Kang-Won;Lee, Jong-Yong;Hong, Jin-Woong
    • Transactions on Electrical and Electronic Materials
    • /
    • v.10 no.3
    • /
    • pp.97-101
    • /
    • 2009
  • The use of a filler material in epoxy composite materials is an essential condition for reducing the unit cost of production and reinforcing mechanical strength. However, the dielectric strength of insulators decreases rapidly due to interactions between the epoxy resin and filler particles. In contrast to existing composite materials, nano-composite materials have superior dielectric strength, mechanical strength, and enduring chemical properties due to an increase in the bond strength of the polymer and nano material, It is reported that nano-fillers provide new characteristics different from the properties of the polymer material. This study is to improve the insulation capability of epoxy resins used in the insulation of a power transformer apparatus and many electronic devices mold. To accomplish this, the additional amount of nano-$SiO_2$ to epoxy resin was changed and the epoxy/$SiO_2$ nano composite materials were made, and the fundamental electrical properties were investigated using a physical properties and an analysis breakdown test. Using allowable breakdown probability, the optimum breakdown strength for designing an electrical apparatus was determined. The results found that the electrical characteristics of the nano-$SiO_2$ content specimens were superior to the virgin specimens. The 0.4 wt% specimens showed the highest electrical properties among the specimens examined with an allowable breakdown probability of 20 %, which indicates stable breakdown strength in insulating machinery design.

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.