• Title/Summary/Keyword: Coordination Mechanism

Search Result 174, Processing Time 0.031 seconds

Design of a Coordinating Mechanism for Multi-Level Scheduling Systems in Supply Chain

  • Lee, Jung-Seung;Kim, Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.1
    • /
    • pp.37-46
    • /
    • 2012
  • The scheduling problem of large products like ships, airplanes, space shuttles, assembled constructions, and automobiles is very complex in nature. To reduce inherent computational complexity, we often design scheduling systems that the original problem is decomposed into small sub-problems, which are scheduled independently and integrated into the original one. Moreover, the steep growth of communication technology and logistics makes it possible to produce a lot of multi-nation corporation by which products are produced across more than one plant. Therefore vertical and lateral coordination among decomposed scheduling systems is necessary. In this research, we suggest an agent-based coordinating mechanism for multi-level scheduling systems in supply chain. For design of a general coordination mechanism, at first, we propose a grammar to define individual scheduling agents which are responsible to their own plants, and a meta-level coordination agent which is engaged to supervise individual scheduling agents. Second, we suggest scheduling agent communication protocols for each scheduling agent topology which is classified according to the system architecture, existence of coordinator, and direction of coordination. We also suggest a scheduling agent communication language which consists of three layers : Agent Communication Layer, Scheduling Coordination Layer, Industry-specific Layer. Finally, in order to improve the efficiency of communication among scheduling agents we suggest a rough capacity coordination model which supports to monitor participating agents and analyze the status of them. With this coordination mechanism, we can easily model coordination processes of multiple scheduling systems. In the future, we will apply this mechanism to shipbuilding domain and develop a prototype system which consists of a dock-scheduling agent, four assembly-plant-scheduling agents, and a meta-level coordination agent. A series of experiment using the real-world data will be performed to examine this mechanism.

Coordination Mechanisms for Decentralized Supply Chain in a Capacitated Distribution Network (공급능력제약이 존재하는 분권화된 공급체인의 조정메커니즘)

  • Park, Jeong-Hoon;Choi, Dong-Hyun;Kim, Sung-Tae
    • Korean System Dynamics Review
    • /
    • v.13 no.1
    • /
    • pp.81-112
    • /
    • 2012
  • This study investigate the impact of supply chain contracts on supply chain performance. This study employed Price adjustment contract(PAC) and Quantity adjustment contract(QAC) as two main types of a vertical coordination mechanism. We simulate different types of coordination mechanisms with various degrees of demand uncertainties and several capacity tightness scenarios. This study shows that PAC and QAC significantly enhance the supply chain profits and fill rates suggesting that supply chain performance can be improved by implementing a proper coordination mechanism depends on the level of a capacity tightness and demand uncertainty.

  • PDF

Interjoint and Intersegmental Coordination Pattern of Dwichagi in Taekwondo (태권도 뒤차기의 인체 관절과 분절사이의 협응 형태)

  • Lee, Ok-Jin;Choi, Ji-Young;Kim, Seung-Jae
    • Korean Journal of Applied Biomechanics
    • /
    • v.17 no.4
    • /
    • pp.73-82
    • /
    • 2007
  • The purpose of this study was to qualitatively analyze coordination pattern of joints and segments during Dwichagi in Taekwondo and present a point of difference as compared with the previous study on Dolryeochagi in Taekwondo. By the utilization of three-dimensional cinematography, the angles of individual joints and segments of six male Taekwondo experts during Dwichagi were calculated by using Euler's angle. The used coordination variables were angle vs. angle plots between adjacent joints and segments and angle vs. angular velocity plots of individual joints and segments, respectively. It was observed during Dwichagi that in-phase coordination and spring-like rotational control mechanism of the lower and upper trunk were transferred into straight spring-like control mechanism of lower leg passing through flexion-extension and the fixation of degree-of-freedom of lower trunk and hip joint alternatively. This comparative study that coordination variables were used seems to be more useful research direction to deeply understand basic control mechanisms of Taekwondo kicking techniques when compared with the previous studies that defined Dwichagi as a thrust movement pattern merely based on biomechanical variables of a kicking leg.

Development of Agent-based Platform for Coordinated Scheduling in Global Supply Chain (글로벌 공급사슬에서 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼 구축)

  • Lee, Jung-Seung;Choi, Seong-Woo
    • Journal of Intelligence and Information Systems
    • /
    • v.17 no.4
    • /
    • pp.213-226
    • /
    • 2011
  • In global supply chain, the scheduling problems of large products such as ships, airplanes, space shuttles, assembled constructions, and/or automobiles are complicated by nature. New scheduling systems are often developed in order to reduce inherent computational complexity. As a result, a problem can be decomposed into small sub-problems, problems that contain independently small scheduling systems integrating into the initial problem. As one of the authors experienced, DAS (Daewoo Shipbuilding Scheduling System) has adopted a two-layered hierarchical architecture. In the hierarchical architecture, individual scheduling systems composed of a high-level dock scheduler, DAS-ERECT and low-level assembly plant schedulers, DAS-PBS, DAS-3DS, DAS-NPS, and DAS-A7 try to search the best schedules under their own constraints. Moreover, the steep growth of communication technology and logistics enables it to introduce distributed multi-nation production plants by which different parts are produced by designated plants. Therefore vertical and lateral coordination among decomposed scheduling systems is necessary. No standard coordination mechanism of multiple scheduling systems exists, even though there are various scheduling systems existing in the area of scheduling research. Previous research regarding the coordination mechanism has mainly focused on external conversation without capacity model. Prior research has heavily focuses on agent-based coordination in the area of agent research. Yet, no scheduling domain has been developed. Previous research regarding the agent-based scheduling has paid its ample attention to internal coordination of scheduling process, a process that has not been efficient. In this study, we suggest a general framework for agent-based coordination of multiple scheduling systems in global supply chain. The purpose of this study was to design a standard coordination mechanism. To do so, we first define an individual scheduling agent responsible for their own plants and a meta-level coordination agent involved with each individual scheduling agent. We then suggest variables and values describing the individual scheduling agent and meta-level coordination agent. These variables and values are represented by Backus-Naur Form. Second, we suggest scheduling agent communication protocols for each scheduling agent topology classified into the system architectures, existence or nonexistence of coordinator, and directions of coordination. If there was a coordinating agent, an individual scheduling agent could communicate with another individual agent indirectly through the coordinator. On the other hand, if there was not any coordinating agent existing, an individual scheduling agent should communicate with another individual agent directly. To apply agent communication language specifically to the scheduling coordination domain, we had to additionally define an inner language, a language that suitably expresses scheduling coordination. A scheduling agent communication language is devised for the communication among agents independent of domain. We adopt three message layers which are ACL layer, scheduling coordination layer, and industry-specific layer. The ACL layer is a domain independent outer language layer. The scheduling coordination layer has terms necessary for scheduling coordination. The industry-specific layer expresses the industry specification. Third, in order to improve the efficiency of communication among scheduling agents and avoid possible infinite loops, we suggest a look-ahead load balancing model which supports to monitor participating agents and to analyze the status of the agents. To build the look-ahead load balancing model, the status of participating agents should be monitored. Most of all, the amount of sharing information should be considered. If complete information is collected, updating and maintenance cost of sharing information will be increasing although the frequency of communication will be decreasing. Therefore the level of detail and updating period of sharing information should be decided contingently. By means of this standard coordination mechanism, we can easily model coordination processes of multiple scheduling systems into supply chain. Finally, we apply this mechanism to shipbuilding domain and develop a prototype system which consists of a dock-scheduling agent, four assembly- plant-scheduling agents, and a meta-level coordination agent. A series of experiments using the real world data are used to empirically examine this mechanism. The results of this study show that the effect of agent-based platform on coordinated scheduling is evident in terms of the number of tardy jobs, tardiness, and makespan.

Decentralized Supply Chain Coordination with Revenue Sharing Mechanism: Transfer Pricing Heuristics and Revenue Share Rates

  • Chen, Hung-Yi;Wu, Hsiao-Chung
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.4
    • /
    • pp.213-220
    • /
    • 2009
  • A revenue sharing contract is one of the mechanisms that coordinate decision makers in a decentralized supply chain toward the consensual goal. The transfer prices between different echelons in the supply chain influence the total supply chain profits. The study aims to explore various transfer pricing heuristics on the supply chain coordination in terms of the supply chain profits and their interactions with the revenue sharing rate. A model is proposed for formulating the collaborative production and distribution planning in a decentralized supply chain with the revenue sharing mechanism. Experiment results indicate that the transfer price and the revenue sharing rate affect significantly the coordination. Among the studied pricing heuristics, the variable-cost pricing method led to the best SC profits. Raising the revenue sharing rate reduced the SC profits no matter what heuristics were employed. Furthermore, the experiments provide us clues for finding the optimal transfer price for the supply chain.

Auction based Task Reallocation in Multiagent Systems

  • Lee, Sang G.;Kim, In C.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.149.3-149
    • /
    • 2001
  • Task allocation is a key problem in multiagent systems. The importance of automated negotiation protocols for solving the task allocation problem is increasing as a consequence of increased multi-agent applications. In this paper, we introduce the multiagent Traveling Salesman Problem(TSP) as an example of task reallocation problem, and suggest Vickery auction as an inter-agent coordination mechanism for solving this problem. In order to apply this market-based coordination mechanism into multiagent TSPs, we define the profit of each agent, the ultimate goal of negotiation, cities to be traded out through auctions, the bidding strategy, and the order of auctions. The primary advantage of such approach is that it can find an optimal task allocation ...

  • PDF

Petri Nets Based Coordination Component for CSCW Environment

  • Huang Hong Zhong;Zhou Feng;Zu Xu
    • Journal of Mechanical Science and Technology
    • /
    • v.19 no.5
    • /
    • pp.1123-1130
    • /
    • 2005
  • In view of the lack of efficient coordination of interdependent task in the collaborative design system, the mechanisms for temporal and resource coordination problems are established based on Petri Nets, respectively. Both of the mechanisms are encapsulated and implemented in the coordination component so as to increase the flexibility and acceptability of the system. We model the CSCW system based on Petri Nets for simulation, analysis and optimization. A case study on the overhead traveling crane is given to demonstrate and validate our theory.

Study on the Role of Hospital Coordinators with System Dynamics Approach (병원 코디네이터도입이 병원경영성과에 미치는 영향분석)

  • Chung, Hee-Tae
    • Korean System Dynamics Review
    • /
    • v.11 no.4
    • /
    • pp.5-23
    • /
    • 2010
  • The competition between hospitals has become an issue for many hospitals because of the sudden increased number of health providers. As the marketing or customer management have become important factors as means of competition, a number of hospital have been considered or already adopted the coordination system. A system dynamics model is developed to see the effect of the hospital coordination system. This paper after briefly explaining the structure of the system dynamics model, discusses the roles of the hospital coordination system with examples. The system dynamics model quantifies through simulations the process of effects of coordination system on the number of customers, productivities of employees (nurses and doctors), and finally the financial status. As a conclusions of the simulations and their analysis, it is concluded that coordination system could be more effective than the investment to the facilities. Since the study is based on only one hospital case, it is limited. However, it explains the mechanism of the coordination system quantitatively as well as qualitatively.

  • PDF

Synthesis and application of zirconium phosphate mesoporous coordination polymer for effective removal of Co(II) from aqueous solutions

  • Yang Zeng;Guoyuan Yuan;Tu Lan;Feize Li;Jijun Yang;Jiali Liao;Yuanyou Yang;Ning Liu
    • Nuclear Engineering and Technology
    • /
    • v.54 no.11
    • /
    • pp.4013-4021
    • /
    • 2022
  • A kind of zirconium phosphate mesoporous coordination polymer Zr-EDTMPA was successfully synthesized and characterized using XRD, FTIR, TGA, EA, SEM-EDS, and N2 sorption-desorption measurements. The prepared Zr-EDTMPA was first employed for the removal of Co(II) from an aqueous solution, and the effects of pH, contact time, temperature, initial Co(II) concentration, reusability, and sorption mechanism were systematically investigated. The results showed that the Zr-EDTMPA is a zirconium phosphate complex formed by the coordination of EDTMPA to Zr in a molar ratio of 1:1. The sorption of Co(II) by Zr-EDTMPA was a pH-dependent, spontaneous and endothermic process, which was better fitted to the pseudo-second-order kinetic model and Langmuir isotherm model. The Zr-EDTMPA was demonstrated to have excellent reusability and presented a high sorption capacity of 73.0 mg·g-1 for Co(II) at pH 8.0. The sorption mechanism was mainly attributed to the strong coordination between cobalt and the untapped hydroxyl functional groups on Zr-EDTMPA, which was confirmed by XPS spectra. Therefore, as a candidate sorbent with high sorption capacity and excellent reusability, Zr-EDTMPA has a great potential for the removal of Co(II) from aqueous solutions.

Uncertain Centralized/Decentralized Production-Distribution Planning Problem in Multi-Product Supply Chains: Fuzzy Mathematical Optimization Approaches

  • Khalili-Damghani, Kaveh;Ghasemi, Peiman
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.2
    • /
    • pp.156-172
    • /
    • 2016
  • Complex and uncertain issues in supply chain result in integrated decision making processes in supply chains. So decentralized (distributed) decision making (DDM) approach is considered as a crucial stage in supply chain planning. In this paper, an uncertain DDM through coordination mechanism is addressed for a multi-product supply chain planning problem. The main concern of this study is comparison of DDM approach with centralized decision making (CDM) approach while some parameters of decision making are assumed to be uncertain. The uncertain DDM problem is modeled through fuzzy mathematical programming in which products' demands are assumed to be uncertain and modeled using fuzzy sets. Moreover, a CDM approach is customized and developed in presence of fuzzy parameters. Both approaches are solved using three fuzzy mathematical optimization methods. Hence, the contribution of this paper can be summarized as follows: 1) proposing a DDM approach for a multi-product supply chain planning problem; 2) Introducing a coordination mechanism in the proposed DDM approach in order to utilize the benefits of a CDM approach while using DDM approach; 3) Modeling the aforementioned problem through fuzzy mathematical programming; 4) Comparing the performance of proposed DDM and a customized uncertain CDM approach on multi-product supply chain planning; 5) Applying three fuzzy mathematical optimization methods in order to address and compare the performance of both DDM and CDM approaches. The results of these fuzzy optimization methods are compared. Computational results illustrate that the proposed DDM approach closely approximates the optimal solutions generated by the CDM approach while the manufacturer's and retailers' decisions are optimized through a coordination mechanism making lasting relationship.