• 제목/요약/키워드: Conventional railway

검색결과 696건 처리시간 0.039초

고속철도의 영향 및 철도수송 합리화 방안 (The Impacts of High-speed Railway on Conventional Railway Systems and Its Policy Implication)

  • 남기찬;곽규석
    • 한국항만학회지
    • /
    • 제7권2호
    • /
    • pp.5-17
    • /
    • 1993
  • The decline of railway industry been a world-wide phenomenon. Recently, increased attention has therefore of railway systems has considerable impacts on the existing transport systems. Korea is expecting a era of high-speed railway and thus the need for the preexamination of such system emerges. This study is therefore concerned with the impacts on the conventional railway systems of the planned high-speed railway and its policy implication. The results revealed that the high-speed railway is almost exclusive to the conventional railway system emerges. This study is therefore concerned with the impacts on the conventional railway systems of the planned high-speed railway and its policy implication. The results revealed that the high-speed railway is almost exclusive to the conventional railway systems. The only impact is to induce some users of the conventional railway services, resulting in some excess track capacity of Kyungbu line. It dose however appear not to have any influence on the level of service for the conventional passenger services and rail freight transport. Consequently, it appears desirable to pay as much attention to the conventional railway systems as to the high-speed railway.

  • PDF

도시철도와 일반·고속철도의 운영방식에 관한 비교 분석 (A Comparative Analysis on the Operating System of Urban Railway & Conventional·High speed Railway)

  • 최종길;윤학선
    • 한국전자통신학회논문지
    • /
    • 제10권8호
    • /
    • pp.953-958
    • /
    • 2015
  • 일반적으로 도시철도는 단거리를 짧은 운전시격으로 운행하는 특징을 가진 도시내 교통수단으로 요즘의 도시철도는 운영자의 요구에 따라 기관사가 없는 무인운전을 채택하는 추세이다. 이에 비해 일반 고속철도는 장거리 운행을 위하여 고속으로 운행하는 철도를 말한다. 일반 고속철도에는 도시철도와는 다르게 화물열차의 운행이라는 특수한 운행조건이 존재하며, 운영방식이 매우 다른 특성을 보이고 있다. 본 논문에서는 도시철도와 일반 고속철도의 운영방식을 비교하고 무선기반 열차제어시스템을 일반 고속철도에 적용하기 위한 조건을 제시하였다.

일반철도 시설유지보수 현황과 효율화 방안 연구 (The Study on the Efficiency of Conventional Railway Infrastructure Maintenance on Current Status)

  • 오윤식;김병관
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2205-2216
    • /
    • 2011
  • Governments seek to advance public industry had planed to decreased by 50% of KORAIL management deficit in 2010, The transition to a profit in 2012. In addition. The government will not achieve the goal by 2010, management announced plans to review the case, and privatization. Office of unprofitable station and vehicle maintenance, maintenance work to make cost savings through outsourcing hed discussed how to create KORAIL advancement. April 2011 the government, "A study on th Efficiency of Conventional Railway Infrastructure Maintenance R&D Report" progresses, conventional railway infrastructure maintenance has focused attention on the field. However, the general maintenance of railway facilities without the knowledge and safety awareness, as compared to foreign railway personnel, and productivity has pointed out the contradiction. Economy and efficiency of the railway in order to pursue a public awareness and safety and professionalism is required. In this study, the conventional railway infrastructure maintenance in accordance with Facts would like to introduce efficiency measures.

  • PDF

현행 철도건설규칙을 고려한 기존선 구간에서의 탈선안전도 해석 (An Analysis of Derailment Safety in Conventional Line considering Current Railway Construction Regulations)

  • 김용원;엄범규;강부병;이희성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1914-1921
    • /
    • 2011
  • When a railway vehicle passes through curves & transitions, the running speed must be improved by proposing the standards on the maximum running possibility speed of each section on conventional line (Dongdaegoo-Namsunghyun) considering derailment safety. In this paper, To improve the maximum running possibility speed of railway vehicle which passes through curves which have high risk of derailment, the track alignment conditions of conventional line (Dongdaegoo-Namsunghyun) that present transition curve length in current railway construction regulations are controlled. We presented elevation way about the section maximum running possibility speed in conventional line by analysis result.

  • PDF

기존선 전철화에 따른 전차선로의 스피드업관련 기술사항에 대한 고찰 (A Study on technical items in the speed-up of catenary system according to a conventional railway′s electrification)

  • 안영훈;강창호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.516-521
    • /
    • 2002
  • This paper was reviewed technical items of catenary system for electrification of Gyeongbu(Dongdaegu∼Busan) and Honam(Daejeon∼Mokpo) conventional Railways. The lines have adopted new technical items in order to connect to Gyeongbu high speed railway. We can use the technology and experience of Gyeongbu and Honam lines to a new catenary system design up-graded for speed-up of conventional lines and new lines construction.

  • PDF

공진소멸 현상을 이용한 기존선 철도교량의 지간 최적화를 위한 연구 (A Study on the Optimal Span Length Selection of Conventional Railway Bridges considering Resonance Suppression)

  • 김성일;정원석;최은수
    • 한국철도학회논문집
    • /
    • 제8권2호
    • /
    • pp.137-144
    • /
    • 2005
  • The possibility of resonance exists always in railway bridges unlike highway bridges because railway bridges are loaded repeatedly by specific trains which has equidistant wheel loads. Resonance phenomenon of the bridge can be broken out when exciting frequencies by tram determined from the speed and effective beating internal coincides with natural frequencies of the bridge Excessive fluctuations of dynamic displacements and accelerations by resonance cause unpleasant passenger comfort and instability of railway structures. On the other hand, resonance suppression phenomenon that all the previous loads which pass through the bridge sum to zero can be occurred. In case we apply this resonance suppression properly, design of stable railway bridge from dynamics point of view can be made. In the present study, most dominant beating internal of conventional trams will be find. A(ter that. specific span length of the bridge which derives resonance suppression can be selected for railway bridges which accomplishes superior dynamic behavior.

운영실적을 이용한 철도전철화에 따른 에너지 절감효과 분석 (A study on energy saving effectiveness of railway electrification using operation data)

  • 정호성;장동욱;권삼영;한문섭;김진환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.899-904
    • /
    • 2007
  • Improvement projects has been progressed for railway electrification and double track line in the conventional line as well as high speed line for the high speed and large transportation capability of railway. Especially, many variable operation plans are possible such as interaction between high speed line and conventional line and operation of tilting train due to the electrification of the conventional line. Railway electrification is more energy efficient and environmentally-friendly, but it has some problems such as an enormous initial construction and maintenance costs and electrical accidents. Therefore, the more intensive research will be progressed about railway electrification effectiveness for the continuous electrification project. So, we analyzed railway electrification effectiveness about the energy side using annual operation data of electric car and diesel car. The energy side was divided into energy costs and national energy consumption for analyzing electrification effectiveness about entire line and specific line. We verified advantage of energy costs and national energy consumption in this paper and this result will contribute to the progress of the continuous electrification project and the more efficient operation ways in electrification line

  • PDF

전기철도의 공용접지 시스템에 대한 안정성 평가에 관한 연구 (Safely Evaluation on Common Grounding System for Electric Railway)

  • 송진호;황유모
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제51권6호
    • /
    • pp.298-306
    • /
    • 2002
  • We performed an safety evaluation on constructing of a common grounding system for electrical railway in view of its efficacy and technical fit. In order to compare the conventional grounding method, which has been individually conducted, with the common grounding with all ground wires connected in common to the counterpoise buried below the surface of the earth in parallel with rail, we set up scenarios with several cases of fault and load conditions in Chungbuk railway sections with the common grounding system. Based on models for railway conductors including the grounded system, line Parameters of railway power system are computed. The circuit model for power system with up and down lines, auto-transformers and railway substations is used to compute impedances of counterpoise and substation ground net. For each scenario with faults and operation conditions of railway, the induced potentials on signal and communication lines are also computed. It is shown that the common grounding for Chungbuk railway is superior experimentally to the conventional method in three respects: (1) the lower rail potentials during operation of railway in line, (2) the lower rail potentials for short-circuit faults between catenary and rail, and (3) the lower stress voltages on signal and communication lines for short-circuit or ground faults. The analysis results confirm that the grounding system for electric railway is required to be built by the common grounding and be evaluated on its safety in design.

편익귀속을 고려한 철도사업의 평가방법론에 대한 고찰 (Review of Railway Projects Evaluation Methodologies considering the Benefit Incidence)

  • 정병두;박정욱;김경철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.65-72
    • /
    • 1999
  • In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.

  • PDF

철도차량의 승강장 통과 시 발생하는 공기역학적 영향에 대한 실험적 연구(기존철도역 현장 시험) (An Experimental Study on the Aerodynamic Effects Generated by a Train Passing near by Platform(Conventional Railway Station Field Test))

  • 김동현;권혁빈;김문헌;송문석;김도훈
    • 한국철도학회논문집
    • /
    • 제7권2호
    • /
    • pp.137-141
    • /
    • 2004
  • A series of filed tests have been performed to investigate the aerodynamic effects on platform of the railway station during the passage of train that can be unpleasant and even dangerous to the pedestrians. To assess the aerodynamic effects on the platform, two aerodynamic properties has been measured; one is the wind gust induced by the train and the other is the pressure pulses generated when the nose and the tail of train passes. To measure these aerodynamic properties during the train passage, an array of hot-wire type anemometers and several sets of pressure transducers have been used, respectively. This paper deals with the filed test on conventional railway at about 100km/h operational speed, in which total 34 measurements has been made at the Bugok station in Seoul-Busan line for Saemaul-ho and Mugungwha-ho train. The results showed dramatic differences in the aerodynamic features between the two trains that are supposed to originate from the contrasting nose shapes of the trains.