A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

A Study on the Cases of Folly Project in the Contemporary Architecture After Parc de la Villette (라빌레뜨 이후 현대건축에서 나타난 폴리 프로젝트 사례 연구)

  • Kang, Hyo-Jeong
    • Korean Institute of Interior Design Journal
    • /
    • v.23 no.3
    • /
    • pp.144-152
    • /
    • 2014
  • This study evaluated how folly is experimented in the contemporary architecture after 30 years when Bernard Tchumi first introduced it to the public by the modern transformation as a garden ornament. First, folly project has been carried out based on the general concept of energizing dwindling cities. However, it has changed to the direction of adding specific programs. Also, along urban regeneration that does not change deterioration of previous structures, Folly changed in the emphasis on readjust existing structure. Second, by having different designers presenting their own follies during the Osaka Expo, folly now has part on visual exhibition element. This has similarity with public art project, yet it could more actively intervene for urban regeneration compared to conventional environment sculpture. Third, folly is experimented as the event-installation art combined form of architecture and art where people could experience the space and enjoy art. Fourth, folly enabled the landscaping of architecture and expanding city planning. Recently Gwangju Folly invited various arts, social, and cultural professionals to converge city design with architecture, landscaping, and other diverse genres.

Recent advances in intravital microscopy for investigation of dynamic cellular behavior in vivo

  • Choo, Yeon Woong;Jeong, Juhee;Jung, Keehoon
    • BMB Reports
    • /
    • v.53 no.7
    • /
    • pp.357-366
    • /
    • 2020
  • Currently, most biological research relies on conventional experimental techniques that allow only static analyses at certain time points in vitro or ex vivo. However, if one could visualize cellular dynamics in living organisms, that would provide a unique opportunity to study key biological phenomena in vivo. Intravital microscopy (IVM) encompasses diverse optical systems for direct viewing of objects, including biological structures and individual cells in live animals. With the current development of devices and techniques, IVM addresses important questions in various fields of biological and biomedical sciences. In this mini-review, we provide a general introduction to IVM and examples of recent applications in the field of immunology, oncology, and vascular biology. We also introduce an advanced type of IVM, dubbed real-time IVM, equipped with video-rate resonant scanning. Since the realt-ime IVM can render cellular dynamics with high temporal resolution in vivo, it allows visualization and analysis of rapid biological processes.

Numerical Analysis for Shotcrete Lining at SCL Tunnel in NS2 Transmission Cable Tunnel Project in Singapore (싱가포르 케이블터널 프로젝트 NS2현장 SCL 터널에서의 숏크리트 라이닝의 변형거동 특성)

  • Kwang, Han Fook;Kim, Young Geun
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.185-194
    • /
    • 2017
  • This technical paper is a study on the unique displacements of Shotcrete Lining at the mined tunnel during excavation period through deep consideration with real time data from monitoring instrumentations correlation with the numerical analysis to identify the rock stresses and the rock spring points at the working face of the Conventional tunnelling by the Drill and Blast, based on the geological face mapping results of the project NS2, Transmission cable tunnel project in Singapore. The created geometry of numerical model was prepared to the real mined tunnel construction site including, vertical shaft, construction adit, tunnel junction area, and 2 enlargement caverns. The convergence measurements by the monitoring instrumentation were performed during the tunnel excavation and shaft sinking construction stages to guarantee the safety of complicated underground structures.

Harmonic analysis and field quality improvement of an HTS quadrupole magnet for a heavy ion accelerator

  • Zhang, Zhan;Wei, Shaoqing;Lee, Sangjin;Jo, Hyun Chul;Kim, Do Gyun;Kim, Jongwon
    • Progress in Superconductivity and Cryogenics
    • /
    • v.18 no.2
    • /
    • pp.21-24
    • /
    • 2016
  • In recent years, the iron-dominated high-temperature superconductor (HTS) quadrupole magnets are being developed for heavy ion accelerators. Field analyses for iron-dominated quadrupole magnets were based on the normal-conducting (NC) quadrupole magnet early in the development for accelerators. Some conclusions are still in use today. However, the magnetic field of iron-dominated HTS quadrupole magnets cannot fully follow these conclusions. This study established an HTS quadrupole magnet model and an NC quadrupole magnet model, respectively. The harmonic characteristics of two magnets were analyzed and compared. According to the comparison, the conventional iron-dominated quadrupole magnets can be designed for maximum field gradient; the HTS quadrupole magnet, however, should be considered with varying field gradient. Finally, the HTS quadrupole magnet was designed for the changing field gradient. The field quality of the design was improved comparing with the result of the previous study. The new design for the HTS quadrupole magnet has been suggested.

Evaluation Methodology of Remote Dismantling Equipment for Reactor Pressure Vessel in Decommissioning Project

  • Hyun, D.J.;Choi, B.S.;Jeong, K.S.;Lee, J.H.;Kim, G.H.;Moon, J.K.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • v.1 no.1
    • /
    • pp.83-92
    • /
    • 2013
  • A novel methodology to evaluate remote dismantling equipment for a reactor pressure vessel (RPV) in a decommissioning project is presented in this paper. The remote dismantling equipment, mainly composed of cutting tools and positioning equipment, is absolutely required to cut and handle highly radioactive and large components in nuclear power plants (NPPs); this equipment has a great effect on the overall success of the decommissioning project. Conventional evaluation methods have only focused on cutting technologies or positioning equipment, although remote dismantling equipment cannot achieve its goal without organic interaction between the cutting tools and the positioning equipment. In this paper, the cutting tools and the positioning equipment are evaluated by performance parameters according to their original characteristics, the relationship between the two systems, and common factors. Finally, the remote dismantling equipment used in recent decommissioning projects has been evaluated based on the proposed methodology. The results of this paper are expected to be useful for future decommissioning projects.

Electromagnetic design study of a 7 T 320 mm high-temperature superconducting MRI magnet with multi-width technique incorporated

  • Jang, Won Seok;Kim, Geonyoung;Choi, Kibum;Park, Jeonghwan;Bang, Jeseok;Hahn, Seungyong
    • Progress in Superconductivity and Cryogenics
    • /
    • v.23 no.4
    • /
    • pp.30-34
    • /
    • 2021
  • Superconducting magnets have paved the way for opening new horizons in designing an electromagnet of a high field magnetic resonance imaging (MRI) device. In the first phase of the superconducting MRI magnet era, low-temperature superconductor (LTS) has played a key role in constructing the main magnet of an MRI device. The highest magnetic resonance (MR) field of 11.7 T was indeed reached using LTS, which is generated by the well-known Iseult project. However, as the limit of current carrying capacity and mechanical robustness under a high field environment is revealed, it is widely believed that commercial LTS wires would be challenging to manufacture a high field (>10 T) MRI magnet. As a result, high-temperature superconductor together with the conducting cooling approach has been spotlighted as a promising alternative to the conventional LTS. In 2020, the Korean government launched a national project to develop an HTS magnet for a high field MRI magnet as an extent of this interest. We have performed a design study of a 7 T 320 mm winding bore HTS MRI magnet, which may be the ultimate goal of this project. Thus, in this paper, design study results are provided. Electromagnetic design and analysis were performed considering the requirements of central magnetic field and spatial field uniformity.

Wind Resource Assessment on the Western Offshore of Korea Using MERRA Reanalysis Data (MERRA 재해석자료를 이용한 서해상 풍력자원평가)

  • Kim, Hyun-Goo;Jang, Moon-Seok;Ryu, Ki-Wahn
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.39-45
    • /
    • 2013
  • Massive offshore wind projects of have recently been driven in full gear on the Western Offshore of Korea including the 2.5 GW West-Southern Offshore Wind Project of the Ministry of Trade, Industry and Energy, and the 5 GW Offshore Wind Project of the Jeollanamdo Provincial Government. On this timely occasion, this study performed a general wind resource assessment on the Western Offshore by using the MERRA reanalysis data of temporal-spatial resolution and accuracy greatly improved comparing to conventional reanalysis data. It is hard to consider that wind resources on the Western Sea are excellent, since analysis results indicated the average wind speed of 6.29 ± 0.39 m/s at 50 m above sea level, and average wind power density of 307 ± 53 W/m2. Therefore, it is considered that activities shall be performed for guarantee economic profits from factor other than wind resources when developing an offshore wind project on the Western Offshore.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

ENHANCING UTILIZATION OF BUILDINGS THROUGH INTEGRATED ANALYSIS OF SPACE, USER, AND USER ACTIVITY

  • Tae Wan Kim;Martin Fischer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.570-575
    • /
    • 2013
  • Enhancing utilization of buildings is gaining in importance in response to a challenging economy; thus, there is a need for a method that analyzes space, user, and user activity in an integrated way to provide project stakeholders with utilization information to support their decision-making about buildings. Conventional methods, such as architectural programming and post-occupancy evaluation, lack a formal relationship between user activity and other information, and therefore, are coarse-grained. This relationship has been formalized by two relatively new methods that provide fine-grained utilization information: workplace planning and space-use analysis. We characterize these two methods with focuses on their usage in different phases (i.e., planning, design, occupancy), required information that needs to be gathered, and the achievement and limitations in terms of three criteria, i.e., consistency, efficiency, and transparency. This characterization would not only help project stakeholders select and use a method that best meets their purposes for enhancing utilization of their buildings, but also provide researchers with promising research topics regarding enhancing utilization of buildings.

  • PDF