A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project (철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구)

  • Lee Young-Joo;Jang Seong- Yong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF

INTERNATIONAL PROJECT MANAGEMENT OF SUZHOU SCIENCE AND CULTURAL ART CENTRE AND SUZHOU INTERNATIONAL EXPO CENTRE

  • Tan Wei Szu Jackson
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.19-29
    • /
    • 2007
  • This paper shares our project management experience in the 2 large-scale projects in managing a diverse international project team of consultants and managing in a foreign land. The first part introduces the two projects, second part addresses management of the projects and the last portion presents some of the challenges we experienced and highlights the importance of understanding the peculiarities of the operating environment, their norms, cultures, effectiveness and limitations of conventional project management tools while operating in a foreign country.

  • PDF

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

Evaluation of the Pilot Village Project of Environment-Friendly Agriculture for a Rice Farming (친환경농업 시범마을 조성사업의 성과분석)

  • Kang, Choong-Kwan;Jung, Man-Chul
    • Korean Journal of Organic Agriculture
    • /
    • v.12 no.2
    • /
    • pp.121-134
    • /
    • 2004
  • Crop inputs in excess of the yield potential of the soil type reduce profitability and increase pollution problems from leaching and runoff. Inaccurate fertilizer and pesticide application can also result in profit loss. Current farming practices plan only for the dominate soil in the field. A government-supported program titled "Pilot village project for the environment-friendly agriculture" was proceeded from 1999 to 2001 to tackle the problems with which our agriculture is faced by introducing IPM, INM and others. The objective of this study is to consider the potential input savings of agricultural chemicals and economic feasibility of the project compared with the conventional farming. The results of the analysis indicate the followings: (1) organic or no-pesticide farming size was increased from 9% in 1999 to 20% in 2001 ; (2) crop yield was a link bit lower than that of the conventional farming, but the sal6 price, gross income and income of the pilot village were 6%, 10% and 9% higher than that of the conventional farming, respectively; and (3) fertilizer and pesticide use also showed decreasing trend gradually.

  • PDF

A Study of Construction Quality Management System using QR code (QR코드를 활용한 품질경영시스템에 관한 연구)

  • Park, Sang-Min;Lim, Tae-Kyung;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.137-139
    • /
    • 2012
  • This paper presents a system architecture and database of construction quality management system which encourages real time information tracking and monitoring. It improves the real time quality record tracking by using QR code technology in the project delivery. The advantages and issues relative to QR code and the database structures of the tracking system are presented. Conventional project scheduling system, operation modeling and analysis system, and quality management system are hybridized using QR code technology. The system improves project quality management by tracking the atomic tasks which consists of a construction process at the lowest level of construction hierarchy. It analyzes the quality records to determine the causes of abnormality and/or nonconformity. Using QR code technology, the construction quality management system may be more effective than the conventional one. It was confirmed that the quality management processes in construction project delivery can be more visible and controllable by integrating QR code technology, project scheduling system, and quality management system.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

Configuration of Driver's Desk System for Korea High Speed Railways (고속전철용 Driver's Desk 시스템 구성)

  • Jeon, J.W.;Lee, J.H.;Kim, Y.J.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07a
    • /
    • pp.483-485
    • /
    • 1999
  • Recently, distributed control network system has been widely applied to on-board control system than conventional relay logic with control wire. This paper presents two configuration of driver's desk system using TCN(Train Communication Network). One is configured with TCN, the other is partial adoption of TCN.

  • PDF

Review of Railway Projects Evaluation Methodologies considering the Benefit Incidence (편익귀속을 고려한 철도사업의 평가방법론에 대한 고찰)

  • 정병두;박정욱;김경철
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.65-72
    • /
    • 1999
  • In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.

  • PDF

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.