The decline of railway industry been a world-wide phenomenon. Recently, increased attention has therefore of railway systems has considerable impacts on the existing transport systems. Korea is expecting a era of high-speed railway and thus the need for the preexamination of such system emerges. This study is therefore concerned with the impacts on the conventional railway systems of the planned high-speed railway and its policy implication. The results revealed that the high-speed railway is almost exclusive to the conventional railway system emerges. This study is therefore concerned with the impacts on the conventional railway systems of the planned high-speed railway and its policy implication. The results revealed that the high-speed railway is almost exclusive to the conventional railway systems. The only impact is to induce some users of the conventional railway services, resulting in some excess track capacity of Kyungbu line. It dose however appear not to have any influence on the level of service for the conventional passenger services and rail freight transport. Consequently, it appears desirable to pay as much attention to the conventional railway systems as to the high-speed railway.
The Journal of the Korea institute of electronic communication sciences
/
v.10
no.8
/
pp.953-958
/
2015
Generally, Urban railway have special characteristics with short distance journey and minimum headway intercity transportation. These days, urban railway operators choose the driverless operation system without driver. On the contrary, Conventional & high speed railway utilize for long distance and high speed running. Because of special conditions of freight railway operation compared with urban railway, operation of conventional & high speed railway is showed very different characteristics. In this paper, We compares different operation scheme of urban railway and conventional & high speed railway and then present condition for train control system based on radio.
Governments seek to advance public industry had planed to decreased by 50% of KORAIL management deficit in 2010, The transition to a profit in 2012. In addition. The government will not achieve the goal by 2010, management announced plans to review the case, and privatization. Office of unprofitable station and vehicle maintenance, maintenance work to make cost savings through outsourcing hed discussed how to create KORAIL advancement. April 2011 the government, "A study on th Efficiency of Conventional Railway Infrastructure Maintenance R&D Report" progresses, conventional railway infrastructure maintenance has focused attention on the field. However, the general maintenance of railway facilities without the knowledge and safety awareness, as compared to foreign railway personnel, and productivity has pointed out the contradiction. Economy and efficiency of the railway in order to pursue a public awareness and safety and professionalism is required. In this study, the conventional railway infrastructure maintenance in accordance with Facts would like to introduce efficiency measures.
Kim, Young-Won;Eom, Beom-Gyu;Kang, Bu-Byoung;Lee, Hi-Sung
Proceedings of the KSR Conference
/
2011.10a
/
pp.1914-1921
/
2011
When a railway vehicle passes through curves & transitions, the running speed must be improved by proposing the standards on the maximum running possibility speed of each section on conventional line (Dongdaegoo-Namsunghyun) considering derailment safety. In this paper, To improve the maximum running possibility speed of railway vehicle which passes through curves which have high risk of derailment, the track alignment conditions of conventional line (Dongdaegoo-Namsunghyun) that present transition curve length in current railway construction regulations are controlled. We presented elevation way about the section maximum running possibility speed in conventional line by analysis result.
This paper was reviewed technical items of catenary system for electrification of Gyeongbu(Dongdaegu∼Busan) and Honam(Daejeon∼Mokpo) conventional Railways. The lines have adopted new technical items in order to connect to Gyeongbu high speed railway. We can use the technology and experience of Gyeongbu and Honam lines to a new catenary system design up-graded for speed-up of conventional lines and new lines construction.
The possibility of resonance exists always in railway bridges unlike highway bridges because railway bridges are loaded repeatedly by specific trains which has equidistant wheel loads. Resonance phenomenon of the bridge can be broken out when exciting frequencies by tram determined from the speed and effective beating internal coincides with natural frequencies of the bridge Excessive fluctuations of dynamic displacements and accelerations by resonance cause unpleasant passenger comfort and instability of railway structures. On the other hand, resonance suppression phenomenon that all the previous loads which pass through the bridge sum to zero can be occurred. In case we apply this resonance suppression properly, design of stable railway bridge from dynamics point of view can be made. In the present study, most dominant beating internal of conventional trams will be find. A(ter that. specific span length of the bridge which derives resonance suppression can be selected for railway bridges which accomplishes superior dynamic behavior.
Improvement projects has been progressed for railway electrification and double track line in the conventional line as well as high speed line for the high speed and large transportation capability of railway. Especially, many variable operation plans are possible such as interaction between high speed line and conventional line and operation of tilting train due to the electrification of the conventional line. Railway electrification is more energy efficient and environmentally-friendly, but it has some problems such as an enormous initial construction and maintenance costs and electrical accidents. Therefore, the more intensive research will be progressed about railway electrification effectiveness for the continuous electrification project. So, we analyzed railway electrification effectiveness about the energy side using annual operation data of electric car and diesel car. The energy side was divided into energy costs and national energy consumption for analyzing electrification effectiveness about entire line and specific line. We verified advantage of energy costs and national energy consumption in this paper and this result will contribute to the progress of the continuous electrification project and the more efficient operation ways in electrification line
The Transactions of the Korean Institute of Electrical Engineers B
/
v.51
no.6
/
pp.298-306
/
2002
We performed an safety evaluation on constructing of a common grounding system for electrical railway in view of its efficacy and technical fit. In order to compare the conventional grounding method, which has been individually conducted, with the common grounding with all ground wires connected in common to the counterpoise buried below the surface of the earth in parallel with rail, we set up scenarios with several cases of fault and load conditions in Chungbuk railway sections with the common grounding system. Based on models for railway conductors including the grounded system, line Parameters of railway power system are computed. The circuit model for power system with up and down lines, auto-transformers and railway substations is used to compute impedances of counterpoise and substation ground net. For each scenario with faults and operation conditions of railway, the induced potentials on signal and communication lines are also computed. It is shown that the common grounding for Chungbuk railway is superior experimentally to the conventional method in three respects: (1) the lower rail potentials during operation of railway in line, (2) the lower rail potentials for short-circuit faults between catenary and rail, and (3) the lower stress voltages on signal and communication lines for short-circuit or ground faults. The analysis results confirm that the grounding system for electric railway is required to be built by the common grounding and be evaluated on its safety in design.
In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.
A series of filed tests have been performed to investigate the aerodynamic effects on platform of the railway station during the passage of train that can be unpleasant and even dangerous to the pedestrians. To assess the aerodynamic effects on the platform, two aerodynamic properties has been measured; one is the wind gust induced by the train and the other is the pressure pulses generated when the nose and the tail of train passes. To measure these aerodynamic properties during the train passage, an array of hot-wire type anemometers and several sets of pressure transducers have been used, respectively. This paper deals with the filed test on conventional railway at about 100km/h operational speed, in which total 34 measurements has been made at the Bugok station in Seoul-Busan line for Saemaul-ho and Mugungwha-ho train. The results showed dramatic differences in the aerodynamic features between the two trains that are supposed to originate from the contrasting nose shapes of the trains.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.