Pelletizer of dry ice snow produced by adiabatic expansion of liquid carbon dioxide and their blaster were designed and manufactured. The blaster had a high cleaning power against various contaminants on the surface such as stain, oily dirt, lacquer film and paints with low blasting pressure and low consumption of blasting air. The capacity of hopper for dry ice pellet supply was 12 kg and the mass rate of pellet blasting was controlled in 0 to 1.2 kg/min. The impact of the pellets was independent of standoff distance within a certain limiting distance, and dependent on the impact stress, angle and mass rate of dry ice pellet blasting. On the other hand the cleaning power was influenced by thermal properties and surface roughness of the substrates and decreased in the order of glass, copper, brass, steel and acryl. The power was also affected by hardness and adhesion of the contaminant on the substrate, and decreased in the order of grease, epoxy and paint. The noise was detected during blasting in the range of 85 to 100dBA.
Woo-Jin, Han;Seung-Ju, Jang;Sang-Soo, Bae;Seung-Yup, Jang;Myung-Seok, Bang
Journal of the Korean Geosynthetics Society
/
v.21
no.4
/
pp.41-53
/
2022
In the excavation work like blasting/excavator work bordering on the urban railway, the dynamic safety of railway structures like tunnel, open-cut box structure and elevated bridge was investigated by numerical analysis in this study. The practically presented criteria on influential zones at the blasting work in the construction industry was numerically checked in cases of the precise vibration-controlled blasting (type II) and the small scale vibration-controlled blasting (type III) and it was shown that the criteria on blasting work methods needed to be supplemented through continuous field tests and numerical analyses. The influence of excavation vibration by mechanical excavators was especially investigated in case of earth auger and breaker. The numerical analysis of tunnel shows that the criteria on vibration velocities from the regression analysis of field test values was conservative. The amplification phenomenon of excavating vibration velocity was shown passing through the backfilling soil between the earth auger and the open-cut box structure. It was shown that the added-vibration on the superstructure of elevated bridge was occurred at the bottom of pile like earthquake when the excavator vibration was arriving at the pile toe. The systematic and continuous research on the vibration effect from excavating works was needed for the safety of urban railway structures and nearby facilities.
Ground vibration is one of the remarkable issues in tunnel blasting. In recent studies, to improve the fragmentation with reduction of ground vibration in tunnel blasting, a vibration-controlled blasting method with artificial cutting slot near the center-cut holes has been suggested. This study examines the effect of the different arrangement of artificial cut-slot on the vibration reduction and fragmentation by performing the full-scaled concrete block blast experiments and the numerical simulations with 3D-DFPA. The results show that the existence of artificial slot contributes to the improvement of vibration reduction, blast fragmentation and the efficiency of the cutting slot blast. It can be explained that the artificial slot play a free surface role and should decrease the burden between the cut holes. Crater volumes of the blasted concrete blocks were measured by 3-dimensional digital image analysis and compared with the ideal standard crater volume which can be calculated by theoretical standard blast design method. As a result, the ratio of burden and hole diameter which should achieve the standard crater in the cut-hole blasting were suggested.
Proceedings of the Korean Vacuum Society Conference
/
2016.02a
/
pp.157.2-157.2
/
2016
Water repellent surfaces may enhance the condensation by efficiently removing the condensed droplets. However, such surfaces may lose their original performance as they are exposed to external mechanical stresses. In this work, we fabricated spray-coated mechanically robust superhydrophobic surfaces using treated titanium dioxide (Type 1) or silica particles (Type 2). Then we compared the mechanical robustness of such surfaces with the silane-coated superhydrophobic surface and PEEK coated surface using a controlled-sand blasting method. The results show that the spray-coated samples can maintain the same level of the contact angle hysteresis than silane-coated superhydorphobic surface after sand blasting at 2 bar. The spray-coating method was applied to the tube type condenser and the condensation behaviors were observed within the environmental chamber with controlled pressure, humidity and non-condensable gas. Previously-reported droplet jumping was observed in the early stage of the condensation event, but soon the droplet jumping stopped and only dropwise condensation was observed since the condensed droplets were pinned on the cracks at spray-coated surfaces. The static contact angle decreases from $158.0^{\circ}$ to $133.2^{\circ}$, and hysteresis increases from $3.0^{\circ}$ to $23.5^{\circ}$ when active condensation occurs on such surfaces. This work suggests the benefits and limitation of spray-coated superhydrophobic condensers and help develop advanced condensers for practical use.
Explosive blasting, hydaulic power unit and rock splitter are typically utilized for rockmass breakage and cutting in reconstruction of building structures and other construction site. Hydraulic rock cutting method, that can be utilized any weather conditions, has been applied mainly by experience for controling damages caused by vibration, noise and rock cuttings, and reducing damage claim by protecting adjacent structures. However, it is required to understand the characteristics of rockmass to improve operation efficiency. Although every cutting method has its own advantage, but it should be applied by considering site circumstance and rockmass properties in details to maximize the operation efficiency and economic feasibility.
Park, Hoon;Nam, Sung-Woo;Noh, You-Song;Suk, Chul-Gi
Explosives and Blasting
/
v.40
no.3
/
pp.66-76
/
2022
Recently, the demand for the dismantling of old industrial complexes has been increasing, and the construction of restoring the dismantled industries to their original natural environment is underway. In this case, the felling method was applied to the explosive demolition method to dismantle a large steel frame structure in an old industrial complex. We used a charging container to cut the steel frame structure that generates a metal jet. The thickness of the thick steel structure in the blasting section was controlled by gouging which a method of digging deep groove by gas and oxygen flame or arc thermal. As a result of the explosive demolition, the steel frame structure collapsed precisely according to the estimated direction. The explosive demolition was completed without causing any damage to the surrounding facilities.
Since the rock fragmentation from a bench blasting can affect the subsequent processes including loading, hauling and crushing, its control is essential for the assessment of blasting efficiency as well as production cost. In this study, the delay time could be precisely controlled by using electronic detonators. The rock fragmentations resulted from the blastings with different delay times of 1, 2, 3, 4, 5, 7 and 10ms per each meter of burden were measured from full scale field tests in a limestone mine. The results showed that the optimum delay time for minimum fragmentation was approximately 6ms/m. From the analysis of fragmentation size distribution, it was possible to find that delay time can be a parameter on rock fragmentation and thus it would be possible to control rock fragmentation by adjusting delay time.
The development of an excavation damaged zone, EDZ, due to the blasting impact and stress redistribution after excavation, can influence on the long tenn stability, economy, and safety of the underground excavation. In this study, the size and characteristics of an EDZ around an underground research tunnel, which was excavated by controlled blasting, in KAERI were investigated. The results were implemented into the modelling for evaluating the influence of an EDZ on hydro-mechanical behavior of the tunnel. From in situ tests at KURT, it was possible to determine that the size of EDZ was about l.5rn. Goodman jack tests and laboratory tests showed that the rock properties in the EDZ were changed about 50% compared to the rock properties before blasting. The size and property change in the EDZ were implemented to a hydro-mechanical coupling analysis. In the modeling, rock strengths and elastic modulus were assumed to be decreased 50% and. the hydraulic conductivity was increased 1 order. From the analysis, it was possible to see that the displacement was increased while the stress was decreased because of an EDZ. When an EDZ was considered in the model, the tunnel inflow was increased about 20% compared to the case without an EDZ.
Abstract The characteristics of bed rock in the study area was classified by means of the crack coefficient estimated from the seismic velocities of in-situ and intact rocks. Various statistical methods were investigated in order to minimize the possible errors in estimating the predictive equation of blasting vibration and to enhance the determination coefficient $R^2$, for more reliable estimation. The determination coefficient showed the highest in the analysis for those groups using weighting function with the number of samples. The analysis for the weighting function employed with standard coefficient and variance also enhanced the determination coefficients significantly compared to the others, but the reliability was slightly lower than results obtained former method. Therefore the most reliable predictive equation of blasting vibration was found to be obtained from a regression analysis of the mean vibration level using the weighting of same distance groups within 15m with the same explosive charge weight per delay. The coefficients, K and n 317.4 and -1.66, respectively, when using the square root scaling, and 209.9 and -1.66, respectively, when using the cube root scaling. The analysis also showed that the square root scaling may be used in the distance less than 31m form the blast source, and the cube root scaling in the distance more than 31m for safe design.
Proceedings of the Korean Society for Rock Mechanics Conference
/
1999.03a
/
pp.41-50
/
1999
발파는 토목, 건설현장이나 광산 등에서 암반에 대한 굴착 방법으로서 가장 널리 쓰이고 있는 방법중의 하나이다. 그러나 최근 들어 발파에 의한 진동이나 소음 등의 위해가 사회적 문제로까지 대두하고 있으며, 또한 발파작업에서 작업계획에 대한 결과의 정밀도를 높이기 위하여 조절발파 등 여러 가지 방법들이 연구 발전되어 가고 있는 추세에 있다. 이러한 연구들은 주로 현장 발파작업 및 발파패턴의 설계에 치중되어 있으며 발파모델을 이용한 해석 연구는 다소 미진한 정도이다. (중략)
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.