• Title/Summary/Keyword: Control blasting

Search Result 159, Processing Time 0.02 seconds

A Case Study of Deck-Charge Blasting Using Electronic Blasting Systems In Urban Area (분산장약공법을 이용한 도심지 전자발파 시공사례)

  • Son, Young-Bok;Kim, Gab-Soo;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.34 no.3
    • /
    • pp.21-26
    • /
    • 2016
  • In case of urban blasting works at near neighbors, the size of one blasting should be minimized to reduce the vibration and noise. However, the complaints is not decreased due to increased numbers of blasting per day so that the period of blasting works become long. This case study is related to urban apartment construction site. In order to overcome the weakness of general detonators which is required many blasting times to meet the day productivity, we have been applied deck-charge blasting method using electronic detonators and then we successfully increased the day productivity with much less blasting times. Hence, we had effectively achieved the declined neighbors'complaints and shortening construction period.

A Numerical Study on the Effective Dimension in Slot-drilling Method (슬롯드릴링공법의 유효제원에 관한 수치해석적 연구)

  • Yoon, Ji-Sun;Lee, Jee-Hoon;Son, Sung-Hoon
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.50-58
    • /
    • 2010
  • This study explores the slot-drilling method that has not yet enough been studied in Korea and intends to provide a theoretical framework for putting the method into practice in a construction site. The possible reduction of ground vibration by implementing slot-drilling methods is addressed. Two main subjects dealt with include the variation of vibration velocity that is based on the distance between the slot-drilling and the epicenter of blasting and the analysis of appropriate effective dimension of slot-drilling width and height to control blasting vibration. This study shows that effect of vibration reduction decreases when distance of the slot-drilling and the epicenter of blasting is getting larger and also reveals that there is a correlation between the slot size and the vibration velocity at any point.

Review of the History of Vibration Controlled Blasting Method and its Future Applicability (진동제어발파공법의 변천과정과 적용 전망에 관한 연구)

  • Ahn, Myung-Seog;Shin, Chang-Yong
    • Explosives and Blasting
    • /
    • v.27 no.1
    • /
    • pp.53-61
    • /
    • 2009
  • R.O.K's explosive manufacturing source was first black powder (B.P) introduced into Korea Dynasty from China. In 1890, black powder was first used for mining blasting in Masan. Nowadays, a vibration control blasting method using the emulsion explosive has been applid to explosive demolition of building structure, subway and road construction sites. In December, 2006, Korean Government and professional society (KSEE) established the blasting guidelines of Modern Vibration Controlled Blasting Method (MVCBM) which is an unprecedented in the world.

서울지하철 3,4호선 Tunnel 굴착과 진동대책 조사연구(1)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.2
    • /
    • pp.3-15
    • /
    • 1982
  • The study on prevention measures for vibration and excavation of tunnel for the #3, #4, Seoul Subway. In the Seoul subway tunnel blasting, the drilling pattern and prevention method to seismic vibration are as follows as well as for adaptions of NATM, the supportings of roof and wall holes are arranged with control blasting. 1. The blasting is executed basically using the low velocity explosive such as slurry, Nitrate ammonium explosive, and F-I and F-II explosive for control blasting substituting of existing dynamite. 2. The cut holes are arranged with burn cut pattern and also must be arranged with M/S electrical delay caps substituting of ordinary do]ay caps. 3. Jack leg drills are used in Five Job sites and a jumbo drill in one job site. 4. In performance of safety work and in maintenance of building safety. The drilling length for blasting will not exceed 1.20 meter for round so that the vibration value shall carry below 0.3cm/sec. The harmonizing of better powder, better drilling machine and better technique is only the way of improving tunnelling efficiency and less vibration will help the dereasing of accidence.

  • PDF

Tunnel Blasting case by Combination of Electronic Detonator and Non-electric Detonator (전자뇌관과 비전기뇌관을 조합한 터널발파 시공사례)

  • Lee, Min Su;Kim, Hee Do;Lee, Hyo;Lee, Jun Won
    • Explosives and Blasting
    • /
    • v.36 no.1
    • /
    • pp.34-38
    • /
    • 2018
  • It proceed the trial test by applying blasting system with combination of electronic detonator and non-electric detonator(Supex Blasting Method) for the purpose of preventing the over-break as well as controling the blasting vibration and noisy at the site of Boseong-Imseongri railroad section ${\bigcirc}{\bigcirc}$. As a result of that, the blasting vibration and noisy was measured within the allowable standard of vibration. In conclusion, the combination of electronic detonator and non-electric detonator can not only reduce come construction cost, level of vibration and noisy but also get the prevention effect for Public resentment and minimize the rock-damage through over break control.

Analysis of Energy and Ground Vibration of Plasma Blasting (플라즈마 발파의 폭력과 지반진동특성)

  • 이경운;박철환;신중호;류창하
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.267-273
    • /
    • 1997
  • Rock fragmentation with plasma blasting technique has advantageous properties in contrast to the conventional blasting method in controlling of flying rocks and ground vibrations, when residents are complaining or surrounding structures stay in protection from blasting operations. The experiences show in urban construction works that the plasma blasting is the most possible method to prevent damages and minimize adverse environmnetal impacts. The fragmentation energy level is evaluated by numerical simulation using PFC-2D for various drill hole pattern and tested accordingly to get the feasibility. The energy output of plasma blasting system has been improved to a level of 1 MJ, which can break a 2~3 ㎥ granite boulder or 1.5 m height bench face. Measurements are carried out to get the ground vibration level and propagation equation, so that the control of the blasting operations can be performed more precisely and safely.

  • PDF

The optimal control methods to reduce the environmental hazards surrounding the YoungNam Uni. Rotary of City Taegu constructing Subway Line No.1 (대구 지하철 구간내 선형 변동에 따른 소음 및 진동 저감 방안 연구)

  • 지왕률;최재진;강상수;강대우
    • Tunnel and Underground Space
    • /
    • v.7 no.2
    • /
    • pp.116-129
    • /
    • 1997
  • The objective of this study is to predict the minimization effect of the noise and vibration during the construction and the train operation regarding to the design modification of the Taegu Subway Line No. 1. It was suggested optimal control blasting methods to reduce the causing vibration Nuance to the resident in City Taegu and also proposed the better governing method to decrease the environmental hazard to the near buildings and residents during the train operation. When the high-density gaseous reaction of explosion products exerts a high pressure in motion outward, a dynamic stress field will be created in the surrounding buildings. Therefore, in the region close to the charge, permanent damage begins to occur at a great critical level of partial velocity, that is difficult from different structure as working conditions. It is reliable to predict that the damages could be reduced if we know the peak velocity and the exact reasons through the conducting of detail studies of structural analysis of the related buildings with the optimal blasting designs. A blasting technique should be deemed to take advantage of the reduction of damage of the surrounding rocks and structures to improve the in-city blasting. This is a typical in-city blasting operation where success depends on closely controlling the ground vibrations in case of better designed blasting methods. There are techniques that can be applied to prevent large vibrations from damaging the important buildings through the Route Modification of the Taegu Subway Line No. 1.

  • PDF

Evaluation of Rock Fragmentation due to Artificial Joint Effect (인공절리에 의한 암석의 파쇄도 평가)

  • Noh, You-Song;Suk, Chul-Gi;Park, Hoon
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.9-15
    • /
    • 2018
  • Since the rock fragmentation by blasting can affect the subsequent processes including loading, hauling and secondary crushing, its control is essential for the assessment of blasting efficiency as well as production cost. In this study, we were analyzed the rock fragmentation by the direction of artificial joint. The underground blasting experiments were performed after forming the vertical and horizontal artificial joints. The blast fragmentation was conducted by the split-desktop which is a 2D image processing program. As a result, it was found that the horizontal artificial joint was evaluated to have lower overall the size of muck pile than the vertical artificial joint and the distribution of the size of muck pile was varied. It is possible that the direction of artificial joint could suppress the occur of oversize muck pile and control to a certain size or less.

A Study on the Tunnel Blasting Technique with a Combined Application of Electronic Detonators and Low Vibration Explosives in a Close Proximity to a Safety things (전자뇌관과 미진동폭약을 활용한 보안물건 초근접 구간에서의 터널발파공법 적용에 관한 연구)

  • Oh, Sei young;Lee, Chun sik;Lee, Ki keun;Lee, Dong hee;Lee, Seung jae;Park, Jong ho
    • Explosives and Blasting
    • /
    • v.35 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • Due to civil complaints on vibrations and noises arising from blasting, mechanical excavation has been widely used for tunneling rather than the method of blasting, especially in the case of being in a close-proximity of 10M-20M range to a safety-thing. However, mechanical excavation, though less, it does increase the cost of whole construction project as the period of excavation is much prolonged from lack of constructability. This study aims to research and develop an effective blasting method that can ensure the constructability of shortened excavation period whilst not compromising the safety of the safety-things in a proximity to the blasting site by using a combination of an electronic detonator that can accurately control its delay period and a Low Vibration Explosives(LoVEX) that is effective on vibration control.