• Title/Summary/Keyword: Control Requirements

Search Result 2,389, Processing Time 0.032 seconds

The technical requirements and configuration of Home Automation System (주택 자동화 시스템의 기능과 구성)

  • 송언빈
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1992.11a
    • /
    • pp.64-68
    • /
    • 1992
  • The demand for home automation system has increased in high-rise apartment houses. Home automation system is realized a more comfortable, more secure, more economical, more convenient, and more satisfying home life. The proposed system functions are meter reading, home security, energy saving, and house control. The technical requirements and configuration of home automation system are provided.

  • PDF

A study on the design of a hydraulic actuator for high-speed underwater vehicle (고속 수중운동체의 유압식 구동장치 설계 연구)

  • 곽동훈;양승윤;이동권
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.839-844
    • /
    • 1992
  • There are many specific requirements in the actuation, system for high speed underwater vehicle, such as size, weights, power etc.. In this paper, a high performance compact hydraulic actuation system to satisfy such requirements was designed. The controller of the system was designed using both the conventional PID and VSC which were known to have reliability, robustness respectively. The performance analysis was done for the designed actuation system through computer simulation.

  • PDF

Requirements and Functional Analysis of the ERTMS/ETCS Trackside System using HARMONY Process (HARMONY 프로세스를 이용한 ERTMS/ETCS 지상 시스템의 요구 및 기능 분석)

  • Um, Jung-Kyou;Yang, Chan-Seok;Kim, Hyoung-Hoon;Cho, Yong-Gi;Kim, Chi-Jo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1382-1387
    • /
    • 2007
  • ERTMS/ETCS is a signalling and control system designed for interoperability between railway networks. In this paper, SysML was used for modeling of the ERTMS/ETCS trackside system. We used use case diagrams and sequence diagrams for requirements analysis and functional analysis. By doing this, we could show that main functions of the ERTMS/ETCS trackside can be described and verified based on scenarios.

  • PDF

A Study on Secure Data Access Control in Mobile Cloud Environment (모바일 클라우드 환경에서 안전한 데이터 접근 제어에 관한 연구)

  • Kim, Si-Jung;Yeo, Sang-Soo
    • Journal of Digital Convergence
    • /
    • v.11 no.2
    • /
    • pp.317-322
    • /
    • 2013
  • Mobile cloud environment is recently becoming popular due to Internet access through various environments. Driven by computer performance improvement and service development, the demand for mobile cloud is increasing and accordingly the damage is on the rise. Therefore, it needs to conduct a study on problems of security necessary in large database that occurs in mobile cloud services. Although various security solutions limiting database access, security strategies about new user environments should be analyzed. This study analyzes weakness of safe data access through database management in mobile cloud environment and examines security requirements for safe data management. In addition, this study looks into threatening factors of security in cloud services and then draws security requirements about safer access control. A study on system application and evaluation of security requirements about access control is required.

Investigation of Radio Communications-based Train Control System with Interoperability (무선통신기반 열차제어시스템 상호운영성 연구)

  • Choi, June-Young;Park, Jae-Young
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.1
    • /
    • pp.35-42
    • /
    • 2014
  • This paper analyzes the hazard related to train control, the functional requirements for atrain control system(TCS) and the automatic train protection(ATP) functional allocation that ensures the interoperability of a radio communications-based TCS. In addition, the interoperability can be obtained using wireless communications technology standards and standardized functional allocations of TCS performed on the wayside and onboard. Using this information, an integrated operating system for a rail network can be constructed. The functional allocations of TCS that support interoperability, require hazard analysis of TCS and definition of the system requirements. The hazard factors for a TCS are confirmed through setting the train safety space control and train speed limit excess. Furthermore, this paper determines the impact of the hazard factors on the TCS and, defines the functional requirements for the TCS subsystems and the ATP wayside and onboard functional allocations.

Creative Resolution for Requirement Conflict Using Conflict Resolution Theory of TRIZ (TRIZ의 모순 해결 이론을 이용한 창의적 요구사항 충돌 해결)

  • Jung, Ji-Young;Kim, Jin-Tae;Park, Soo-Yong
    • Journal of KIISE:Software and Applications
    • /
    • v.37 no.5
    • /
    • pp.411-415
    • /
    • 2010
  • The Conflicts between requirements may cause a failure of functions or even project. Currently, most of researches have focused on identifying requirements and some researchers have tried to resolve requirements conflicts but it was only based on requirement priority. This paper proposes the Creative Requirements Conflict Resolution (CRRC) to resolve requirement conflicts in a creative way using TRIZ methodology. TRIZ, which means the theory of solving inventor's problems, is made based on the analysis of over 2 million patent cases and helpful for developing a creative solution to resolve conflicts. CRRC classifies requirement conflicts into groups and then apply TRIZ theory related to each group. At the result of control experiment, CRRC provides the various kinds of creative solution for requirement conflicts.

General Requirements Pertaining to Radiation Protection in Diagnostic X-ray Equipment -KFDA DRS 1-1-3 : 2008 base on IEC 60601-1-3:2008- (진단용 엑스선 장치에 있어서 방사선 방어에 대한 일반 요구사항 -IEC 60601-1-3:2008에 근거한 KFDA DRS 1-1-3:2008-)

  • Kang, Hee-Doo;Dong, Kyung-Rae;Kweon, Dae-Cheol;Choi, Jun-Gu;Jeong, Jae-Ho;Jung, Jae-Eun;Ryu, Young-Hwan
    • Korean Journal of Digital Imaging in Medicine
    • /
    • v.11 no.2
    • /
    • pp.69-77
    • /
    • 2009
  • This study gives an account of the collateral standards in IEC 60601-1-3: 2008 specifying the general requirements for basic safety and essential performance of diagnostic X-ray equipment regarding radiation protection as it pertains to the production of X-rays. The collateral standards establish general requirements for safety regarding ionization radiation in diagnostic radiation systems and describe a verifiable evaluation method of suitable requirements regarding control over the lowest possible dose equivalent for patients, radiologic technologists, and others. The particular standards for each equipment can be determined by the general requirements in the collateral standard and the particular standard is followed in the risk management file. The guidelines for radiation safety of diagnostic radiation systems is written up in ISO 13485, ISO 14971, IEC 60601-1-3(2002)1st edition, medical electric equipment part 1-3, and the general requirements for safety-collateral standards: programmable electrical medical systems. Therefore the diagnostic radiation system protects citizens' health rights with the establishment and revisions of laws and standards for diagnostic radiation systems as a background for the general requirements of radiation safe guards applies, as an international trend, standards regarding the medical radiation safety management. The diagnostic radiation system will also assure competitive power through a conforming evaluation unifying the differing standards, technical specifications, and recognized processes.

  • PDF

GUI Design for PC Based Greenhouse (PC 기반 시설 하우스를 위한 GUI 설계)

  • 이종혁;김기환;전은호
    • Proceedings of the IEEK Conference
    • /
    • 2003.07c
    • /
    • pp.2549-2552
    • /
    • 2003
  • The greenhouse control system is designed by personal computer. This system should observe and control the growth conditions for crops in both plastic film and glass greenhouses. In this contribution puts emphasis on graphical user interface for greenhouse control system by personal computer under the aim of creating safer, more effective and more economical services. This system is developed for the requirements of the intelligent greenhouse control system and gives a lot of convenience for farmer who is not familiar with pc technique. The GUI and control system are programmed by Visual C++ and Visual Basic.

  • PDF

Priority Control Using Delay Counter for ATM Switch (ATM 스위치에서 지연카운터를 이용한 우선순위 제어 기법)

  • 김변곤
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • 1998.06c
    • /
    • pp.339-342
    • /
    • 1998
  • The various services that a broadband integrated services digital network (B-ISDN) carries, have a wide range of delay, delay jitter and cell loss probability requirements. Design of appropriate control schemes for B-ISDN is an extremely important and challenging problem. In this paper, we proposes a priority control scheme with a delay counter and a cell counter per each class type. The priority control for required service quality is performed with delay/loss factor obstained by comparing window counter with cell counter. The performance of proposed control scheme is estimated by computer simulation.

  • PDF

Fault Tolerant Control of Magnetic Bearings

  • Na Uhn-Joo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11b
    • /
    • pp.388-392
    • /
    • 2002
  • Fault tolerant control algorithm for heteropolar magnetic bearings are presented. This fault tolerant control utilizes grouping of currents as C-cores in order to isolate magnetic fluxes. Hardware requirements to maintain fault tolerant control are reduced since decoupling chokes are not required in this control scheme. The currents supplied to each pole are redistributed, if some coils fail suddenly, such that the resultant magnetic forces should remain invariant through coil failure events. Load capacity before magnetic saturation is reduced through coil failures while maintaining the same magnetic forces before and after failure.

  • PDF