PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.
This study compared he importance of food service, views to the performance, management objectives, and recognition gap about the contract contents towards the dietetic departments of hospitals that manage the patients' food service and managers of contract managed companies, and dieticians. It conducted questionnaires and survey towards the vice director and dieticians of 17 hospitals, over 500 beds, and the persons responsible for contract managed companies and dietitians who were in charge of food service. The hospitals showed significantly(p<0.05) higher the importance scores in menu planning, the distribution of meal, sanitation management, and leadership than those of the contract managed companies. In the difference of hospitals and contract managed companies about performance, it appeared high in the contract managed companies. In the importance of the foodservice management objective, the hospital had significantly(p<0.05) higher scores in the management of client's satisfaction and quality improvement element through management innovation than those of the contract managed companies. In the importance of contract term, the contract method, expense, and payment condition of commission fee were significantly(p<0.05) high scores in the contract managed companies, compared to the hospital.
This study aims to suggest the method to enhance the value of public construction project during contract review process considering budget reduction for project profit and public interest enhancement simultaneously. The main results of this study are as follows: (1) Current method are considered to be improved from the point that cost reduction through current method could influence performance of the object of contract without conforming to user requirements or facilities' function. (2) In order to supplement current process, the method to evaluate the variation of performance and value was established based on facility type, participants on each phase, and their requirement. (3) Case study was conducted to verify suggested method, and showed the successful application in enhancing the value of construction projects on public sector.
IT outsourcing studies have centered on the separate effect of formal contract and relational trust on IT outsourcing performance. In addition, previous studies ignored the importance of the relational capability that combine the formal contract and partnership can be able to deliver IT outsourcing effects. In this paper, we propose an IT governance commitment as a mediated role between relational capability and IT outsourcing performance. We collected data from 143 client companies of IT outsourcing and analyzed it using the PLS method. Our findings are revealed as following: At first, relational capability significantly and directly influence IT governance commitment as well as indirectly through formal contract and partnership. Secondly, IT governance commitment mediate between relational capability and IT outsourcing effect, and in turn affect IT outsourcing performance. The results and implications are further discussed.
보금자리주택 건설에서 분양가 인하의 하나의 방안으로 직할시공제가 도입되었다. 특정 발주방식을 대규모 공공건설사업에 적용 할 경우 본격적인 적용이전에 해당 발주방식에 대한 각계의 논의를 수렴하고 해당 발주방식이 사업성과에 미치는 영향을 다각도로 분석할 필요가 있다. 이에 본 연구에서는 공공건설사업에의 직할시공제 적용에 따른 공사비, 공사기간, 품질, 리스크 등 사업성과에 미치는 영향을 전문가 면담과 해외사례 조사를 통해 분석하고, 이러한 문제점들을 해결하고 공공건설사업에의 직할시공제의 효율적 적용을 위한 방안을 제시하였다. 먼저 직할시공제하에서는 발주자의 업무가 대폭적으로 증가하므로 해당 공공발주자 조직에서 증가된 업무 수행이 가능한지를 점검해야 하고, 이에 따른 발주자 조직과 업무절차의 변화가 필요하다. 아울러 직할시공제의 효율적 적용을 위해 다중시공기반 CM방식 등 다양한 수행방식을 적용 할 필요가 있으며, 공사관리 절차 및 시스템 구축, 협력업체 강화 등이 필요하다.
도로포장분야의 성능보증(warranty)계약제도는 유럽, 미국, 일본에서 오랫동안 시행되어 왔거나 시행되기 시작한 제도로서 그 효과가 입증되었거나 입증되고 있다. 본 연구에서는 유럽, 미국, 일본의 성능보증계약제도의 도입 및 운영 현황을 조사하였고, 성능보증계약제도의 장단점과 국내 적용가능성 분석을 통해 성능보증계약제도의 국내 도입방안을 제시하였다. 본 연구의 주요 결론으로 성능보증계약제도를 국내에 적용하기 위한 성능기준 개발의 필요성과, 보증보험 수수료 및 보증기간 등을 고려한 적정공사비 산정방안 마련, 국내에 적합한 성능보증방식 개발 등의 필요성을 제시하였고, 국내에 성능보증계약 제도의 도입을 위한 장단기적 적용방안을 제시하였다.
The purpose of this study was to test the effects of health contract on the performance level for activity of daily living(ADL) in the hemiplegic patients. A quasi - experimental research for health contract, which was approved as an effective method of nursing intervention, was attempted to increase the performance of the hemiplegic patients' ADL. As a purpose sample, 69 hemiplegic patients hospitalized at Oriental medicine hospital of K university were taken and devided into the experimental group and the control group by means of random assignment. After Contracting with the experimental group, they were reinforced everyday for 20 minutes. The experimental group and the control group were observed and interviewed for five times at the in terval of 3~4 days by the trained nurses for this research. The data Collected through above mentioned methods were compute analyzed by t-test and ANOVA according to the purpose of this study. The data collected through above mentioned methods were computer analyzed by t-test and ANOVA according to the purposre of this study. strate increased the performance level for ADL than the Control group” was supported(t=2.96, df=52.76, p= .004). Sub Hypothesis 1,2,4,5 : “The hypothesis that the experimental group with health contract will demonstrate increased the performance level for eating(t=2.29, df=42.70, p= .027), personal hygiene and grooming (t=4.04, df=43.10, p= .000), dressing(t=3.32, df=67, p= .001) and undressing (t=3.47, df=48.44, p= .001) than the control group” was supported. Sub Hypothesis 3.6 : “The hypothesis that the experimental group with health contract will demonstrate increased the performance level for toiletting(t= .19, df=67, p= .849) and mobilization (t= .30, df=67, p= .765) than the control group” was not supported. The conclusion can be that the positive relationship between the nurse and the patient results in the desired performance level for ADL in the hemiplegic patients.
Journal of Construction Engineering and Project Management
/
제5권3호
/
pp.18-28
/
2015
Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.
There are various factors to consider when parties to an international agreement draft a dispute resolution clause in their written contract. These factors can be classified into two categories. The first category is about the parties and the nature of the contract, such as the parties' places of business and whether the contract contains a simple transaction or has a complicated nature. The second category is about the applicable rules of the parties' places of business or performance such as the private international law, service of process rules, and enforcement of court judgment and arbitration award rules. When parties to an international contract agree to a litigation, they normally choose a forum court and a governing law. In selecting a forum court and a governing law, the parties must consider private international law, service of process rules, and enforcement of judgement rules of candidate forums. In case the parties agree to an arbitration, they have to choose between institutional arbitration and ad hoc arbitration. For ad hoc arbitration, parties still need to further agree on which arbitration rules to use, and in which place the arbitration shall take place. Mediation involves a similar kind of decision as with arbitration. Traditionally, national courts of the parties' places of business have been used as litigation forums in dispute resolution clauses but, recently, arbitration is being increasingly employed as an alternative dispute resolution method in international contracts. Moreover, there have been international efforts to utilize mediation as a dispute resolution method in international commercial issues. Rather than simply taking a dispute resolution clause provided in a sample written contract, parties to an international contract must carefully consider various relevant factors in order to insert a dispute resolution clause which will work well for a particular contract.
항공우주분야에서 특수 목적 항공기 이외에도 시제기, 무인비행장치, 우주발사체 등 다양한 형태의 제작물공급계약이 증가하고 있다. 도급인의 입장에서는 거액의 비용을 지출하여 제작물을 공급받기로 예정되어 있었는데, 제품의 품질과 성능의 기준을 제시하는 구매규격서가 부실하거나 성능미달여부를 판단할 만한 능력이 부족한 경우에는 목적 달성 불능 이외에도 막대한 시간과 비용을 소모하게 된다. 수급인으로서도 계약 목적 달성에 필요한 성능과 품질을 갖춘 제작물을 공급할 능력이 없음에도 불구하고 무리하게 계약을 체결하게 되면, 일의 미완성에 따른 매몰비용과 계약해제에 따른 손해배상을 감수하여야 하므로 막대한 손해가 발생한다. 대상사안에서 피고는 원고에게 구매규격서에 규정된 바와 같이 ILS Offset 비행이 가능한 Happy Box 방식에 의한 항공기를 납품하도록 하였으나, 원고는 RNAV 방식에 의한 항공기를 납품하려고 하였다. RNAV 방식에 의하여도 ILS 지상신호의 검사가 가능하더라도 원고가 주장하는 방식으로 제작된 항공기는 구매규격서에서 요구한 ILS Offset 비행기능을 갖추지 못하여 피고가 구매규격서에서 요구한 목적을 달성할 수 없으므로, 이를 이유로 한 피고의 계약해제가 적법한지 여부가 문제되었다. 이 사건 계약의 목적물인 항공기는 부대체물에 해당하므로 이 사건 계약은 도급의 성질을 가지고, 따라서 이 사건 계약에서 일이 완성되었다고 하려면 항공기의 주요구조 부분이 약정된 대로 제작되어 사회통념상 일반적으로 요구되는 성능을 갖추고 있어야 한다. 그런데 원고가 납품한 항공기는 구매규격서에서 요구한 ILS Offset 비행기능을 갖추지 못하여 피고가 구매규격서에서 요구한 목적을 달성할 수 없으므로 중대한 하자가 있고, 이러한 하자는 원고가 보수하는 것이 불가능하므로, 이를 이유로 한 피고의 계약해제는 적법하다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.