• Title/Summary/Keyword: Continuous excavation

Search Result 65, Processing Time 0.023 seconds

A Study on the Improvement of the Stability of Small-Scale Manpower Tunnels for Food Storage (식품저장용 소규모 인력터널의 안정성 향상을 위한 방안 연구)

  • Byung Jo Yoon;Sung Yun Park;Ryung Hwan Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.746-753
    • /
    • 2022
  • Purpose: The purpose of this study is to review the safety of small tunnels for food storage excavation in the 1960s~1970s and to improve the stability of small tunnels. Method: A visual inspection and a hammer test were used to conduct safety tests, and the visual inspection is one of the tests conducted for non-destructive testing, and the hammer test is one of the types of hitting methods of rebound hardness. Result: According to the integrated analysis of the survey area data, there are generally good appearance, but there are many small cracks and complex geological conditions, requiring continuous observation and attention. Seven of the 23 tunnels require safety diagnosis, one collapse, one safe, and 14 require continuous observation and attention. Conclusion: All parts of small tunnels should be checked and recorded from time to time, and stability is expected to be improved when reinforcing small tunnels proposed in this study.

The Change of Site Pattern of Buddhist Architecture of Koguryo (고구려사지(高句麗寺址)를 중심(中心)으로 고찰(考察)한 5세기전후(世紀前後) 불사계획(佛寺計劃)의 변화(變化))

  • Kim, Sung-Woo
    • Journal of architectural history
    • /
    • v.5 no.1 s.9
    • /
    • pp.9-17
    • /
    • 1996
  • A few archeological excavation of Buddhist temple sites of Koguryo were reported with information of site arrangement. The interpretation of such information is very important not only for the explanation of Korea early Buddhist architecture but also for the development of East Asian cases in general since no archeological evidences of the same period were found in other countries such as China. Though the investigation of the four temple sites this paper attempt to identify their date of construction and the process of change. The study depended much on comparative studies of the change of site elements such as pagoda, image hall., corridor, and other buildings. The study could conclude that the site of SangO-Ri must be the earliest case which was followed by ChungRung-Sa, which was built in around 427AD. The site of ToSung-Ri was the case which was the work of the rate 5th century. Such process of the development of Buddhist architecture in Koguryo unveils the fact that the process of change was a continuous flow toward a consistent goal of change that had much to do with the contemporary religious situation.

  • PDF

Effects of geometric parameters of a combined nozzle for rock cutting using an abrasive waterjet (연마재 워터젯 암석절삭을 위한 결합 노즐의 기하학적 변수 영향)

  • Oh, Tae-Min;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.5
    • /
    • pp.517-528
    • /
    • 2012
  • Inserting a nozzle assembly into a removed cutting space during a continuous cutting operation is necessary in rock excavation using an abrasive waterjet. In this study, a combined two nozzle assembly is used to secure enough removal width. The shape of the cut space is affected by the geometric parameters (standoff distance, nozzle angle, and vertical distance between the nozzle tips) of the combined nozzle assembly. Abrasive waterjet cutting tests are performed with various geometric parameters for granite rock specimens. Optimized geometric parameters for the nozzle inserting process are determined and verified through the experimental tests.

MORDERN METHODS FOR TUNNEL (지하철 터널 굴착공법)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.14 no.3
    • /
    • pp.9-21
    • /
    • 1981
  • The rationalization for Tunnel Drifting is based on the high productivity which is achievable due to Continuous work with a Jumbo Drill, resulting in a much higher efficiency them the Conventional method of blasting, mucking and supporting services. Large projects of over 4,000m Tunnel Drifting are condidated to justify the use of a Jumbo Drill with a combination of superior explosives, machinery and techniques. During a Tunnel Drifting test, Gulita, Nabit and slurry made by Nitro Nobel were employed with following results. 1, Conditions: a. Granite Rock with Two free face b. Burden (W), 2m c. Diameter of hole, 42mm d. Depth of hole 3.5m e. Hole pitch 0.6m f. Charged Explosive per hole Gelatin Dynamite 4 pieces (112.5${\times}$4ea)+Guuita 5 pieces(110g${\times}$5ea) g. Simal-taneous Detonation h. After the blasting resultant rock size was Less 40% of the 0.3m Lumps. 2. Calculation results W=q/Wn=100cm‥‥‥Burden in simultaneous blasting 0.865kg(7.7ea)/hole ‥‥‥Amount of charge but hole pitch is 1.5W-2W The estimated cost of using a Jumbo Drill for the Construction of a 3,000,000 bbL sub-surface oil storage would be as follows: This calculation is based on the Jumbo Drill advancing 3.6m per blasting cycle. Unit cost/bbL Excavation $3.13 The attached sheet shows ideal Drilling pattern with Burn Cut & Smooth blasting method. In conclusion, it is my opinion that this method will assure safety and save cost and improve our technical know-how.

  • PDF

A case study of digital twin construction based on geospatial building information modeling (GeoBIM) - Focusing on the case of Jaeamcheon-gul and Jeonggusu-gul in Jeju Island - (지하공간건설정보모델링(GeoBIM) 기반의 디지털 트윈 구축사례에 관한 연구 - 제주도 재암천굴, 정구수굴 사례를 중심으로 -)

  • Lee, Jong-Hyun;An, Joon-Sang;Choi, Jae-Woong;Baek, Yong
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.20-30
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction is actively researched, in the domestic construction field, and one of the key elements in this field is Building Information Modeling(BIM). In Korea, smart construction is being implemented through BIM-based digitization and intelligence. The geotechnical engineering field should also prepare for the introduction of BIM. In this study, the concept and application status of GeoBIM were identified, and the direction of future research was presented. This study is a part of the study "Establishment of GeoBIM-based Digital Twin Maintenance System" in the current "Technology Development for Establishment of Jeju Ground Collapse Response System for Safe Road Operation". The subject and scope of the study is continuous excavation at caves located under roads in Jeju Island, and initial research is being conducted on Jaeamcheon-gul and Jeonggusu-gul. This study aims to build a digital twin through individual data construction and integration processes such as cave shape modeling using laser scanners, 3D stratum modeling using borehole information and geophysical exploration data, and modeling of surrounding conditions using drones.

Effects of Functional Improvement of Multiaxis Flat Continuous Soil Cement Earth Retaining Wall (다축 평면 연속형 SCW 흙막이 벽체의 개선 효과)

  • Chung, Choong-Sub;Yoo, Chan Ho;Nam, Ho Seong;Choi, In Gyu;Baek, Seung Cheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.7-22
    • /
    • 2023
  • In January 2022, a new legislation was enforced to enhance the safety of underground construction. Consequently, a comprehensive assessment of underground safety is now an integral part of the planning process, including an evaluation of its impact. Ensuring the stability of temporary retaining walls during underground excavation has become paramount, prompting a heightened focus on the assessment of underground safety. This study delves into the analysis of the Multi-axis Flat Continuous Soil Cement Wall retaining wall (MFS) construction method. This method facilitates the expansion of wall thickness in the ground and provides flexibility in selecting and spacing H-piles. Through laboratory model tests, we scrutinized the load-displacement behavior of the wall, varying the H-pile installation intervals using the MFS method. Additionally, a 3-dimensional numerical analysis was conducted to explore the influence of H-pile installation intervals and sizes on the load for different thicknesses of the MFS retaining wall. The displacement analysis yielded the calculation of the height of the arching effect acting on the wall. To further our understanding, a design method was introduced, quantitatively analyzing the results of axial force and shear force acting on the wall. This involved applying the maximum arching height, calculated by the MFS method, to the existing member force review method. The axial force and shear force, contingent on the H-pile installation interval and size applied to the MFS retaining wall, demonstrated a reduction effect ranging from 24.6% to 62.9%.

Study on the factors affecting the performance of the excellent Industry-University cooperation coordinator (산학협력 코디네이터 성과에 영향을 미치는 요인에 관한 연구)

  • Hong, Eunyoung;Choi, Jong-In
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.1
    • /
    • pp.107-118
    • /
    • 2014
  • enterprise to strengthen growth and technological competitiveness through close cooperation with universities and research institutions. The Purpose of this study is to present how to seek more participation in industry-university cooperation from Industry, University, Research Institute, and Government (I-U-R-G) using success factor analysis of "Excellent Industry-University Cooperation Coordinator". The findings can be summarized as follows. First, it is indicated that Coordinator' business aggressiveness positively affect the volume of business and technology DB excavation. Second, it is indicated that the number of agency staff positively affect the volume of business, the number of Project derived by Coordinator and new professors participation rate. Third, it is indicated that the Fellowship of the Enterprises positively affect the volume of business, technology DB excavation and new professors participation rate. Lastly, it is indicated that organization maintains, center chapter leadership, and local government'commitment don't have positive effect on the performance of I-U Cooperation of SMEs.. Therefore, in order to improve the performance of cooperation technology development projects that affect the technological competitiveness of SMEs, I-U cooperation coordinator needs more continuous attention and support from Industry, University, Research institution, and Government.

  • PDF

A Basic Study on Upward Soil Nailing Combined Horizontal Drainage (수평배수공을 겸한 상향식 쏘일네일링 공법의 기초연구)

  • Kim, Hongtaek;Lee, Jungjae;Chung, Jongmin;Choi, Geunhyeok;Lee, In
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.151-158
    • /
    • 2009
  • In the early 1990s, soil nailing was first introduced as method of reinforcement for the slope stability and ground excavation, and as its application was increased the improved soil nailing was also developed. Most recently used for grout soil nailing greatly improve the methods and techniques for self-improvement techniques are classified as soil nailing. As the representative for the grout pressure method to improve the join method pressure grouting and improved method for the self-drilled soil nailing, removable soil nailing, upward soil nailing combined with horizontal drainage system. This paper is to compare upward soil nailing combined with horizontal drainage system with downward direction of the soil nailing. In order to study the limit equilibrium slope stability analysis and comparison with factor of safage, excavation for the vertical displacement for comparison with continuous analysis. According to this study, safage factor is decreased considerably using limit equilibrium analysis and makes no odds for the horizontal displacement when soil nail was installed upward.

  • PDF

A combined sewer design method using tractive force considering wastewater flow on non-rainy days and its application for improvement methods of sewer (청천시 오수량을 고려한 합류식 하수도 소류력 설계법과 이를 활용한 하수관거 개보수방안)

  • Ji, Hyon Wook;Yoo, Sung Soo;Song, Homyeon;Kang, Jeong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.3
    • /
    • pp.211-220
    • /
    • 2020
  • When domestic sewage and rainwater runoff are discharged into a single sewer pipe, it is called a "combined sewer system." The sewage design standards in Korea specify the flow velocity based only on the volume of rainfall; therefore, sedimentation occurs on non-rainy days owing to the reduced flow rate and velocity. This sedimentation reduces the discharge capacity, causes unpleasant odors, and exacerbates the problem of combined sewer overflow concentration. To address this problem, the amount of sewage on non-rainy days, not just the volume of rainfall, should also be considered. There are various theories on sedimentation in sewer movement. This study introduces a self-cleansing velocity based on tractive force theory. By applying a self-cleansing velocity equivalent to the critical shear stress of a sand particle, sedimentation can be reduced on non-rainy days. The amount of sewage changes according to the water use pattern of citizens. The design hourly maximum wastewater flow was considered as a representative value, and the velocity of this flow should be more than the self-cleansing velocity. This design method requires a steeper gradient than existing design criteria. Therefore, the existing sewer pipelines need to be improved and repaired accordingly. In this study, five types of improvement and repair methods that can maximize the use of existing pipelines and minimize the depth of excavation are proposed. The key technologies utilized are trenchless sewer rehabilitation and complex cross-section pipes. Trenchless sewer rehabilitation is a popular sewage repair method. However, it is complex because the cross-section pipes do not have a universal design and require continuous research and development. In an old metropolis with a combined sewer system, it is difficult to carry out excavation work; hence, the methods presented in this study may be useful in the future.

A Study on the Diffusion of Silla Roof-End Tile (신라기와의 지방확산에 대한 검토)

  • Yang, Jong-Hyun
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.3
    • /
    • pp.100-113
    • /
    • 2012
  • In the midst of recent active excavation, lots of Silla(新羅) roof-end tiles are unearthed in Yeongnam area(嶺南地域). These are confirmed the same tile frame as the Silla tiles excavated in Gyeongju(慶州). It is represented by the Silla tiles excavated in Ingaksa Temple(麟角寺) excavation research. Roof-end tile with arabesque design(唐草文平瓦當) etc. including roof-end tile with lotus design(蓮花文圓瓦當) are judged to be the tile frame produced by the same frame of roof-end tile that was excavated in Gyeongju, Wolseong(月城) and Hwangyongsa Temple(皇龍寺址). There are three kinds of cases concerning the transportation of tile manufacture ; the roof-end tile manufactured in Gyeongju directly moved to each region, only tile frame moved to site to be manufactured there, and tile manufacturer moved to site to manufacture there. This article considers the case of the roof-end tile manufactured in Gyeongju that was directly moved to each region. In case of the Silla tiles excavated in region especially Ingaksa Temple, the aspects of tiles in accordance with different era show the repeated coexistence, expansion and maintenance. This situation is significant as a clue to understand the supply from Gyeongju not as temporary, but as continuous. On the other hand, if the Gyeongju tiles flowed directly into each region, and if the road was built of gravels and the means of transportation was cart, the damage from movement must never be prevented. On the contrary, transportation through waterway might be advantageous due to the reduction of labor and damage rate and the easiness of loading. Accordingly, it tells us why the ruins where roof-end tiles were excavated located near big and small rivers or streams. Of course there are some ruins located in a fixed distance, but the distance may be enough to endure the impact put on tiles from the overland movement. Therefore, in case of direct inflow form long distance, transportation must be finished by overland movement after waterway movement.