• Title/Summary/Keyword: Container crane

Search Result 427, Processing Time 0.024 seconds

A Study of Comparison with the Operating Priority Rules of RMGC on Semi-Automated Container Terminal (반자동화 컨테이너터미널의 RMGC 운영방식 비교 분석)

  • Kim, Chan-Ho;Ha, Tae-Young;Yang, Hong-Suk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.2
    • /
    • pp.1-17
    • /
    • 2010
  • This paper aims to compare four operating priority rules of RMGC (Rail Mounted Gantry Crane) used in semi-automated container terminal. The four priority rules employed in this paper are FCFS (First-come-first-served), LCFS (Last-come-first-served), TOS (Turn-over-served) and NFS (Nearest-first-served). And to compare the four operating priority rules, this paper analyzed productivity of RMGC and CC (Container Crane), waiting time of YT (Yard Truck) and RT (Road Truck) in container yard, and turnaround time of RT in container terminal of each priority rule by using stevedoring simulation. As a result, NFS was evaluated as the best rule to improve the overall productivity of container terminal in terms of all criteria.

A Study on the Effect of Wind Load to an Articulated type Container Crane by Fluid-Structural Coupled Field Analysis (유동-구조 연성해석기법을 이용한 풍하중이 관절형 컨테이너 크레인에 미치는 영향에 관한 연구)

  • An, Tae-Won;Lee, Seong-Wook;Han, Dong-Seop;Kim, Tae-Hyung;Han, Geun-Jo
    • Journal of Navigation and Port Research
    • /
    • v.32 no.1
    • /
    • pp.23-27
    • /
    • 2008
  • This study was carried out to the effect of wind load on the structural stability of an articulated type container crane according to the wind direction assuming that 75m/s wind velocity is applied on a container crane using FSI(fluid-structural interaction). To consider fluid phenomenon around the container crane, the wind load was derived by the computation fluid dynamic, and it applied to the FSI which can guarantee an accuracy and a reliability in the design stage for wind resistant structural stability to minimize the damage due to high wind load applied in a container crane with a 'ㄱ' type articulated boom which used in the total height restriction region. Following from this, the reaction force on the each support of a container crane was suggested. ANSYS ICEM CFD 10.0 and ANSYS CFX 10.0 used for computation fluid dynamic, and the ANSYS Workbench 11.0 was used for the fluid-structural interaction.

Dynamic Analysis of Floating Multi-Bodies Considering Crane Impact Loads (크레인 충격하중을 고려한 다중 부유체 운동해석)

  • Kim, Young-Bok;Kim, Yong-Yook
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.49 no.3
    • /
    • pp.273-279
    • /
    • 2012
  • The concept of the Mobile Harbor had been made recently as a kind of feeder vehicle to transfer a certain amount of container boxes (i.e. 250 TEU at a time) from main ocean container vessels over 5,000 TEU capacity to the container terminal on land. In a harbor a short distance apart from the land, the container loading/unloading operation has to be performed on the main deck of the Mobile Harbor using the container cranes in the state of side-by-side mooring with protection of fenders and robot arms in the gap. Even under the ocean condition of the sea state class 2 or 3, the operation has to be confirmed to be safely performed. In this situation, the floating bodies considering the multiple-body interaction effect also has to be examined whether they might behave safely or not. Especially, this study focuses on the dynamic behavior of the Mobile harbor when a container box is hanged on the crane and the impact load due to the slewing motion is imposed in a certain sea state. The motion response should be controlled within the motion level to assure the safe operation.

A Study on the Sway Control of a Container Crane with Varying Rope Length Based on Gain-Scheduling Approach (로프 길이변화를 고려한 크레인의 흔들림 제어에 관한 연구: Gain-Scheduling 기법에 의한 제어기 설계)

  • Kim, Y.W.;Kim, Y.B.
    • Journal of Power System Engineering
    • /
    • v.8 no.3
    • /
    • pp.58-66
    • /
    • 2004
  • The sway motion control problem of a container hanging on the trolly is considered in the paper. In the container crane control problem, suppressing the residual swing motion of the container at the end of acceleration, deceleration or the case of that the unexpected disturbance input exists is main issue. For this problem, in general, many trolley motion control strategies are introduced and applied. In this paper, we introduce and synthesize a swing motion control system in which a small auxiliary mass is installed on the spreader made by ourselves. In this control system, the actuator reacting against the auxiliary mass applies inertial control forces to the container to reduce the swing motion in the desired manner. Especially, we apply the $H_{\infty}$ based gain-scheduling control technique the anti-sway control system design problem of the controlled plant. In this control system, the controller dynamics are adjusted in real-time according to time-varying plant parameters. And the simulation result shows that the proposed control strategy is shown to be useful to the case of time-varying system and, robust to disturbances like winds and initial sway motion.

  • PDF

A Study on the Sway Control of a Container Crane with Varying Rope Length Based on Gain-Scheduling Approach (로프 길이 변화를 고려한 크레인의 흔들림 제어에 관한 연구;Gain-Scheduling 기법에 의한 제어기 설계)

  • Kim, Y.W.;Kim, Y.B.
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.631-636
    • /
    • 2004
  • The sway motion control problem of a container hanging on the trolly is considered in the paper. In the container crane control problem, suppressing the residual swing motion of the container at the end of acceleration, deceleration or the case of that the unexpected disturbance input exists is main issue. For this problem, in general, many trolley motion control strategies are introduced and applied. In this paper, we introduce and synthesize a swing motion control system in which a small auxiliary mass is installed on the spreader made by ourselves. In this control system, the actuator reacting against the auxiliary mass applies inertial control forces to the container to reduce the swing motion in the desired manner. Especially, we apply the $H_{\infty}$ based gain-scheduling control technique the anti-sway control system design problem of the controlled plant. In this control system, the controller dynamics are adjusted in real-time according to time-varying plant parameters. And the experiment result shows that the proposed control strategy is shown to be useful to the case of time-varying system and, robust to disturbances like winds and initial sway motion.

  • PDF

A Study on the Sway Control of a Crane Based on Gain-Scheduling Approach (Gain-Scheduling 기법을 이용한 크레인의 흔들림 제어에 관한 연구)

  • Kim, Young-Bok
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.7
    • /
    • pp.53-64
    • /
    • 2001
  • The gain-scheduling control technique is vary useful in the control problem incorporating time varying parameters which can be measured in real time. Based on these facts, in this paper the sway control problem of the pendulum motion of a container hanging on the trolly, which transports containers from a container ship to trucks, is considered. In the container crane control problem, suppressing the residual swing motion of the container at the end of acceleration, deceleration or the case of that the unexpected disturbance input exists is main issue. For this problem, in general, the trolley motion control strategy is introduced and applied. But, in this paper, we introduce and synthesize a new type of swing motion control system. In this control system, a small auxiliary mass is installed on the spreader. And the actuator reacts against the auxiliary mass, applying inertial control forces to the container to reduce the swing motion in the desired manner. In this paper, we assume that an plant parameter is varying and apply the gain-scheduling control technique design the anti-swing motion control system for the controlled plant. In this control system, the controller dynamics are adjusted in real-time according to time-varying plant parameters. And the simulation result shows that the proposed control strategy is shown to be useful to the case of time-varying system and, robust to disturbances like winds and initial sway motion.

  • PDF

A Study on Future Container Cranes (차세대 컨테이너크레인에 대한 고찰)

  • Jung Hyun-Soo;Lee Suk-Jae;Hong Keum-Shik
    • Journal of Navigation and Port Research
    • /
    • v.29 no.3 s.99
    • /
    • pp.291-298
    • /
    • 2005
  • In this article. the specifications of a future container crane for a 18,000 TEU megaship are investigated After studying the transitions of containerships through the past half century, the characteristics of the past and current container cranes are outlined. together with various research trends throughout the world Upon these results, the size and performance of the container crane that will be used beyond the year 2014 are forecast. Specifically, the structure, trolley and hoist mechanism, control method, outreach. backreach, rail gage, loading capacity, stability, durability, and others are summarized.

A Study on Development ATCS of Transfer Crane using Neural Network Predictive Control (신경회로망 예측제어에 의한 Transfer Crane의 ATCS 개발에 관한 연구)

  • 손동섭;이진우;이영진;이권순
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2002.11a
    • /
    • pp.113-119
    • /
    • 2002
  • Recently, an automatic crane control system is required with high speed and rapid transportation. During the operation of crane system in container yard it is necessary to control the crane trolley position and loop length so that the swing of the hanging container is minimized We can do development of unmanned automation control system using automation travel control technique and anti-sway technique in crane system. Therefore, we designed a controller for Automation travel control to control the transfer crane system. Analyzed crane system through simulation, and proved excellency of control performance than other conventional controllers.

  • PDF

Optimal State Feedback Control of Container Crane Using RCGA Technique (RCGA 기법을 이용한 컨테이너 크레인의 최적 상태 피드백 제어)

  • Lee, Yun-Hyung;Yoo, Heui-Han;Cho, Kwon-Hae;So, Myung-Ok
    • Journal of Navigation and Port Research
    • /
    • v.31 no.3 s.119
    • /
    • pp.247-252
    • /
    • 2007
  • The container crane is one of the most important equipments at container terminal. If its working time in cycle could be reduced then container terminal efficiency and service level can be increased. So there are many i1forts to reduce working time of container cranes. It means how to design the controller with good performance which has small overshoot and swing motion of container crane. We, in this paper, present a state feedback controller based on LQ theory incorporating a RCGA which means real-coded genetic algorithm RCGA can search state feedback gains under given objective function. A set of simulation works are carried out in order to prove the control effectiveness of the proposed methods.

A Study on improvement of Quay productivity with minimizing double activities in Container Terminal Yard (컨테이너터미널 야드 중복작업 최소화를 통한 안벽 생산성 향상에 관한 연구)

  • Kim, Geong-Jung;Lee, Jung-Sun;Lee, Moun-Su;Kwak, Kyu-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.340-341
    • /
    • 2007
  • In case of Busan Port container terminals scale of a yard device chapter is small and narrow, and redundant works of device chapter facilities ability and transfer cranes are misgovernment occurring very much bemuse of this There is to the misgovernment that cannot support design ability of a container crane of quay because of this There is this in a change of marine transportation harbor environment to cross over to a large easel next of a ship, and a large problem cannot but become. Watched how redundant works were occurring in the second yards, and presented a problem Also, present the hint point tint these redundant works analyze how productivity of quay productivity and container crane is improved if solution works, and face to this.

  • PDF