• Title/Summary/Keyword: Container Crane System

Search Result 216, Processing Time 0.035 seconds

A Study on Controller Design for An Optimal Control of Container Crane (컨테이너 크레인의 최적제어를 위한 제어기 설계에 관한 연구)

  • 최성욱;손주한;이진우;이영진;이권순
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.142-142
    • /
    • 2000
  • During the operation of crane system in container yard, it is necessary to control the crane trolley position so that the swing of the hanging container is minimized. Recently an automatic control system with high speed and rapid transportation is required. Therefore, we designed a controller to control the crane system with disturbances. In this paper, Ive present the neural network two degree of freedom PID controller to control the swing motion and trolley position. Then we executed the computer simulation to verify the performance of the proposed controller and compared the performance of the neural network PID controller with our proposed controller in terms of the rope swing and the precision of position control . Computer simulation results show that the proposed controller has better performances than neural network PID with disturbances.

  • PDF

Movement identification model of port container crane based on structural health monitoring system

  • Kaloop, Mosbeh R.;Sayed, Mohamed A.;Kim, Dookie;Kim, Eunsung
    • Structural Engineering and Mechanics
    • /
    • v.50 no.1
    • /
    • pp.105-119
    • /
    • 2014
  • This study presents a steel container crane movement analysis and assessment based on structural health monitoring (SHM). The accelerometers are used to monitor the dynamic crane behavior and a 3-D finite element model (FEM) was designed to express the static displacement of the crane under the different load cases. The multi-input single-output nonlinear autoregressive neural network with external input (NNARX) model is used to identify the crane dynamic displacements. The FEM analysis and the identification model are used to investigate the safety and the vibration state of the crane in both time and frequency domains. Moreover, the SHM system is used based on the FEM analysis to assess the crane behavior. The analysis results indicate that: (1) the mean relative dynamic displacement can reveal the relative static movement of structures under environmental load; (2) the environmental load conditions clearly affect the crane deformations in different load cases; (3) the crane deformations are shown within the safe limits under different loads.

Development of Automatic Steering System using Image Processing Technique (영상처리기법을 이용한 자율주행시스템 개발)

  • Cho, Chi-Woon;Park, Sung-Won
    • IE interfaces
    • /
    • v.10 no.2
    • /
    • pp.69-77
    • /
    • 1997
  • Material handling equipment such as container cranes and transtainer cranes have made larger and faster to improve the efficiency of container handling. As conditions of use in container terminal have become severe, and also the automation level required has become higher. For the high level automation for transtainer crane, the following characteristics have to be developed 1) Container Terminal Operation & Planning System with high efficiency. 2)Autosteering System of transtainer crane with precise position sensing system using image processing and feedback control system. 3)Automatic Position Identification System with transponder. We have developed an AGSS(Automatic Gantry Steering System) of transtainer crane with image processing technology preferentially. In this paper, the system will be introduced.

  • PDF

Job Analysis of Container Crane Operators by the DACUM Method (데이컴 방법에 의한 컨테이너크레인 운전자 직무분석)

  • Bae, Suk-Tae
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.4
    • /
    • pp.281-298
    • /
    • 2009
  • There have been problems regarding decreased productivity and inherent safety risks due to apprentice facility operators receiving training without a standardized education system, especially for container crane operators. This study aims to propose alternatives to educate and manage container crane operators systematically in accordance with a job analysis. The Job analysis was professional panels and a Developing A Curriculum(DACUM) facilitator. The job description on the DACUM research chart for container crane operators contained 6 duties and 42 tasks. We surveyed problems with the existing education process for container crane operators; performed job analysis according to DACUM based on the survey results, and finally developed job description, education courseware and a summary table.

  • PDF

Anti-Sway System for Automated Transfer Crane (자동 트랜스퍼 크레인을 위한 컨테이너 흔들림 장치)

  • 박찬훈;박경택;김두형
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1743-1746
    • /
    • 2003
  • Automated Container Terminals have been being developed over the world for many recent years and more and more countries get interested in it because the amount of containers exported or imported is steeply increasing. Existed Container Terminals were not designed to control this kind of heavily many containers. They would face many structural problems soon or later, although they have managed to do well until now. One of the most important things in developing Automated Container Terminal is to develop the equipment able to transfer the awfully many containers. Those are maybe Automated Transfer Cranes, Automated Guided Vehicles, and Automated Quay-Side Cranes. The word "Automated" means the equipment is operated without drivers and those equipments are able to work without taking any break. Through the researches on the existed transfer cranes, authors decided that the structure of existed transfer cranes is not proper to swift and fast transfer and it′s not impossible to handle so many containers in limited time. Therefore authors have been studying on the proper structure of the Automated Container Crane for past several years and a new type of transfer crane has been developed. Design concepts and control methods of a new crane will be introduced in this paper.

  • PDF

The Anti-Sway System for Yard Crane Using Auxiliary Ropes (보조로프를 이용한 야드크레인의 안티스웨이 시스템)

  • 박찬훈;박경택;김두형
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.526-529
    • /
    • 2002
  • The development of automated container terminal has been a hot issue for recent years. It's very natural because it's very important how many containers, how soon, and how precisely a container terminal can treat. A crane treats a very heavy container, maybe, no less than 20∼40 tons, thus most cranes use ropes to take up and land containers. But rope causes the sway of a container and this phenomenon is not avoided. On the ground of this, in most case how much skillful a driver is may affect the productivity of a yard or quay crane. Thus many researches have been concentrated on the development of the control algorithm for a crane which may be useful and robust enough to drive a crane without any human driver. Authors of this paper also are interested in this kind of research but we have been much more interested for years in the development of a mechanical structure which may cause much less sway than the existing cranes do. In this paper, we may introduce the basic structure of the developed anti-sway system.

  • PDF

A Study on Loading/Unloading Methods for High-Speed Container Loading/Unloading System (고속 컨테이너 하역시스템의 하역방법에 관한 연구)

  • 박경택;김선호;김두형
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1998.10a
    • /
    • pp.167-174
    • /
    • 1998
  • Recently several researches of high speed container ship and loading system are mainly accomplished in U.S.A. and Japan. Its shipping service is not realized but it is realized in near future. To effective use of the feature and efficiency of them, quay, loading/unloading. yard operation system, port management system and connection transport system must be well integrated and operated. Specially, loading /unloading speed of container crane is important for making effective use of them. To speed up loading/unloading system, RO-RO and LO-LO methods that are mostly exclusive system are studied on the container crane with special structure and mechanism to handle individual container or bundle of containers. In this paper these methods are shown. When new high speed loading system of container is desighed, the realistic constrains must be considered.

  • PDF

A Study on the Sway Control of a Container Crane with Varying Rope Length Based on Gain-Scheduling Approach (로프 길이변화를 고려한 크레인의 흔들림 제어에 관한 연구: Gain-Scheduling 기법에 의한 제어기 설계)

  • Kim, Y.W.;Kim, Y.B.
    • Journal of Power System Engineering
    • /
    • v.8 no.3
    • /
    • pp.58-66
    • /
    • 2004
  • The sway motion control problem of a container hanging on the trolly is considered in the paper. In the container crane control problem, suppressing the residual swing motion of the container at the end of acceleration, deceleration or the case of that the unexpected disturbance input exists is main issue. For this problem, in general, many trolley motion control strategies are introduced and applied. In this paper, we introduce and synthesize a swing motion control system in which a small auxiliary mass is installed on the spreader made by ourselves. In this control system, the actuator reacting against the auxiliary mass applies inertial control forces to the container to reduce the swing motion in the desired manner. Especially, we apply the $H_{\infty}$ based gain-scheduling control technique the anti-sway control system design problem of the controlled plant. In this control system, the controller dynamics are adjusted in real-time according to time-varying plant parameters. And the simulation result shows that the proposed control strategy is shown to be useful to the case of time-varying system and, robust to disturbances like winds and initial sway motion.

  • PDF

A Study on the Development of Residual Sway Motion Control System for the Container Crane (컨테이너 크레인의 흔들림 방지장치 개발에 관한 연구)

  • 손유식;김영복
    • Journal of Ocean Engineering and Technology
    • /
    • v.14 no.4
    • /
    • pp.35-42
    • /
    • 2000
  • The sway control problem of the pendulum motion of a container hanging on the trolly, which transports containers from a container ship to trucks, is considered in the paper. In the container crane control problem, suppressing the residual swing motion of the container at the end of acceleration or the case of that the unexpected disturbance input exists is main issue. For this problem, in general, the trolley motion control strategy is introduced and applied. But in this paper, we introduce and synthesize a new type of swing motion control system. In this control system, a small auxiliary mass is installed on the spreader. And the actuator reacts against the auxiliary mass, applying intertial control forces to the container to reduce the swing motion in the desired manner. In this paper, we apply the LMI approach and simultaneous optimization design method to design the anti-swing motion control system for the controlled plant. And the simulation result shows that the proposed control strategy is shown to be robust to disturbances like winds and initial sway motion.

  • PDF

A Study on the Sway Control of a Container Crane Based on $H^{\infty}$ Gain-Scheduling Approach ($H^{\infty}$ Gain-Scheduling 기법을 이용한 컨테이너 크레인의 흔들임 제어에 관한 연구)

  • Kim, Yeong-Bok;Jeong, Yong-Gil
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.7
    • /
    • pp.559-566
    • /
    • 2001
  • The sway control problem of the pendulum motion of a container hanging on the trolly, which transports containers from a container ship to trucks, is considered in the paper. In the container crane control problem, suppressing the residual swing motion of the container at the end of acceleration, deceleration or the case of that the unexpected disturbance input exists is main issue. For this problem, in general, the trolley motion control strategy is introduced and applied. In this paper, we introduce and synthesize a new type of swing motion control system in which a small auxiliary mass is installed on the spreader. The actuator reacting against the auxiliary mall applies inertial control forces to the container to reduce the swing motion in the desired manner. In this paper, we apply the $H^{\infty}$ based gain-scheduling control technique to the anti-swing motion control system design problem of the controlled plant. In this control system, the controller dynamics are adjusted in real-time according to time-varying plant parameters. And the simulation result shows that the proposed control strategy is shown to be useful for the case of time-varying system and, robust to disturbances such as winds and initial sway motion.

  • PDF