• Title/Summary/Keyword: Construction volume

Search Result 1,471, Processing Time 0.024 seconds

Effects of Extending Duration of Nighttime Road Construction (도로품질 향상을 위한 야간 도로공사 시간확대의 영향분석)

  • Lee, Dongmin;Choi, Junseong;Park, Jejin;Park, Yongjin
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.153-162
    • /
    • 2017
  • PURPOSES : This study was conducted to analyze the effects arising from extending the duration of nighttime road construction on improving road quality and durability. METHODS : Most previous studies estimating the social cost of various construction conditions did not consider road pavement cooling time as a factor in improving road pavement quality. This study investigated the feasibility of achieving higher road quality and durability by extending the duration of nighttime road construction time extension. For this investigation, the effects of such an extension on traffic conditions were analyzed based on micro-simulation studies and scenario-based cost-benefit analyses, using factors including traffic volume, delay, construction cost, and road pavement cooling time. RESULTS : The results of the traffic simulation studies and cost-benefit analyses indicate that the current road construction method that emphasizes completing nighttime road construction by 6 a.m. reduces pavement life while causing relatively little traffic delay. If the night construction time is instead extended to 2 p.m., road pavement lifetime is increased, reducing road re-construction cost. These savings are greater than the cost of congestion arising from extending the duration of nighttime construction. CONCLUSIONS : The current nighttime construction durations need to be extended in order to efficiently manage roads and reduce road management costs.

Validation on the Utilization of Small-scale Unmanned Aerial Systems(sUAS) for Topographic Volume Calculations (토공량 산정을 위한 소형무인항공시스템의 활용성 평가)

  • Lee, Yong-Chang
    • Journal of Cadastre & Land InformatiX
    • /
    • v.47 no.1
    • /
    • pp.111-126
    • /
    • 2017
  • Small-scale UAS(Fusion technique of Unmanned Aerial Vehicles platform and Sensors, 'sUAS') opens various new applications in construction fields and so becoming progressively common due to the considerable potentials in terms of accuracy, costs and abilities. The purpose of this study is that the investigation of the validation on the utilization of sUAS for earth stockpile volume calculations on sites. For this, generate 3D models(DSM) with sUAS aerial images on an cone shaped soil stockpile approximately $270m{\times}300m{\times}20m$, which located at Baegot Life Park in Siheung-si, compared stockpile volume estimates produced by sUAS image analysis, against volume estimates obtained by GNSS Network-RTK ground surveying method which selected as the criteria of earth stockpile volume. The result through comparison and examination show(demonstrate) that there was under 2% difference between the volume calculated with the GNSS Network RTK data and the sUAV data, especially sUAS imaged-based volume estimate of a stockpile can be greatly simplified, done quickly, and very cost effective over conventional terrestrial survey methods. Therefore, with consideration of various plan to assess the height of vegetation, sUAS image-based application expected very useful both volume estimate and 3D geospatial information extraction in small and medium-sized sites.

Earth-Volume Measurement of Small Area Using Low-cost UAV (저가형 UAV를 이용한 소규모지역의 토량 측정)

  • Seong, Ji Hoon;Han, You Kyung;Lee, Won Hee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.4
    • /
    • pp.279-286
    • /
    • 2018
  • In the civil works, the measurement of earth-volume is one of the important elements in the estimation of the reasonable construction cost. Related studies mainly used GPS (Global Positioning System) or total station to obtain information on civil work areas. However, these methods are difficult to implement in inaccessible areas. Therefore, the aim of this paper is to use the UAV (Unmanned Aerial Vehicle) to measure the earth-volume. The study area is located in a reservoir construction site in Sangju-si, Gyeongsangbuk-do, Republic of Korea. We compared the earth-volume amounts acquired by UAV-based surveying to ones acquired by total station-based and GPS-based surveying, respectively. In the site, the amount of earth-volume acquired by GPS was $147,286.79m^3$. The amount of earth-volume acquired by total station was $147,286.79m^3$, which is the 96.13% accuracy compared to the GPS-based surveying. The earth-volume obtained by UAV was $143,997.05m^3$ when measured without GCPs (Ground Control Points), $147,251.71m^3$ with 4 GCPs measurement, and $146,963.81m^3$ with 7 GCPs measurement. Compared to the GPS-based surveying, 97.77%, 99.98%, and 99.78% accuracies were obtained from the UAV-based surveying without GCP, 4 GCPs, and 7 GCPs, respectively. Therefore, it can be confirmed that the UAV-based surveying can be used for the earth-volume measurement.

An Ambiguity-free Surface Construction from Volume Data (입체적인 데이터에서 애매성-프리 표면 재구성)

  • Lee, Ee-Taek;Oh, Kwang-Man;Park, Kyu Ho
    • Journal of the Korea Computer Graphics Society
    • /
    • v.4 no.1
    • /
    • pp.55-66
    • /
    • 1998
  • This paper presents a simple method for relieving the ambiguity problems within the sub-voxel based surface-fitting approach for the surface construction. ECB algorithm is proposed to avoid the ambiguity problem which is the root of the holes within the resulting polygon based approximation. The basic idea of our disambiguation strategy is the use of a set of predefined modeling primitives (we call SMP) which guarantees the topological consistency of resulted surface polygons. 20 SMPs are derived from the extension of the concept of the elementary modeling primitives in the CB algorithm [3], and fit one to five faces of them to the iso-surface crossing a cell with no further processing. A look-up table which has a surface triangle list is pre-calculated using these 20 SMPs. All of surface triangles in the table are from the faces of SMPs and are stored in the form of edge list on which vertices of each surface triangle are located. The resulted polygon based approximation is unique at every threshold value and its validity is guaranteed without considering the complicated problems such as average of density and postprocessing. ECB algorithm could be free from the need for the time consuming post-processing, which eliminates holes by revisiting every boundary cell. Through three experiments of surface construction from volume data, its capability of hole avoidance is showed.

  • PDF

A Study on Flexural Behavior of Precast Prestressed Concrete Hollow Slab Bridge (조립식 PSC 중공슬래브교의 휨거동에 관한 연구)

  • Kim, Ki-Yong;Song, Ha-Won;Kim, Ho-Jin;Byun, Keun-Joo;Kim, Yon-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.524-527
    • /
    • 2004
  • Recently, precast concrete products have been increasingly used in the construction of bridges except for special bridges like long-span bridge due to their easy and high-quality construction. Specially the use of precast prestressed concrete hollow box slab bridges is also increased due to the merits in their construction. Thus, an experimental evaluation of flexural behavior of the precast PSC hollow box slab bridges and a development of effective analytical technique for the behavior are necessary. For the development, experimental study on the flexural behavior of the precast bridges up to ultimate states is needed. In this study, two full-scale precast PSC hollow box slab girders are manufactured and full-scale flexural failure tests of the girders subjected to cyclic loading are carried out. For the failure analysis of the girders, the so-called volume control method is applied to finite element analysis of the precast PSC hollow box slab girders discretized using multi-layered shell elements. The analytical results by the volume control method is verified by comparing with test results.

  • PDF

Properties of Light Weight Foamed Concrete According to Curing Condition (양생조건에 따른 경량기포콘크리트의 특성)

  • Shin, Sang-Chul;Choi, Ji-Ho;Hong, Sung-Rog;Kim, Ji-Ho;Jeong, Ji-Yong;Kim, Jin-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.237-239
    • /
    • 2011
  • This study was performed to investigate the influence of curing temperature on the properties of light weight foamed concrete, manufactured on-site construction according to the various experimental factor such as temperature of material, curing temperature in air(5, 10, 20℃), curing time in air(5, 10, 15hour), and target density of hardened state(0.8, 1.2t/㎥). As a result, the influence of the curing temperature on various properties of foamed concrete is greater than curing time. When increasing temperature and time in air curing, progress of hydration is fast and compressive strength is increasing more and more. However, when considering the productivity, minimum curing time is required 15hours at 5℃, 10hours at 10℃, and 5hours at 20℃. If this condition is not required, there is some crack due to volume expansion on the surface of light weight foamed concrete.

  • PDF

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.