• Title/Summary/Keyword: Construction supervision process

Search Result 68, Processing Time 0.032 seconds

Derivation and Implications of Digitalizing Key Construction Supervision Work: Focusing on the Construction Supervision Work of the Domestic Construction Sites

  • Chan Hyuk Park;Seong Mi Kang
    • Architectural research
    • /
    • v.25 no.1
    • /
    • pp.11-17
    • /
    • 2023
  • This study aims to derive key construction supervision work that can be digitalized among construction supervision work. The scope of the study includes domestic construction sites to which the Building Act of South Korea is applied. First, the construction supervision process was identified through extensive consultation of construction expert witnesses. Afterwards, the key construction supervision works for digitization were derived through survey results construction expert witnesses. Among the 24 supervision works throughout the pre-construction, construction, and post-construction stages, the proportion of supervision work manpower or cost, the type of data generated by supervision work and the urgency of introducing digital technology, and the impact on productivity and safety of supervision work were evaluated on a 5-point scale from "very low" to "very high" was investigated. The survey was conducted by t-test analysis, and as a result, it was possible to derive that the level of digitization was higher than average in "quality management," "safety management," and "collection and cooperation of maintenance instructions." It can be interpreted that digitization has been introduced on a pilot testing basis or has already been completed according to the needs of the site. On the other hand, it can be interpreted that the work that are obtained below the average score are considered to be realistically constrained at the construction site and that it is inevitable for the supervisor to proceed manually. Future studies include analyzing the quantitative impact of the key construction supervision work once digitalization is fully applied.

The Effect of Construction Safety Supervision System on Risk Control and Reduction (건설안전감리제도가 위험제어 및 절감에 미치는 영향)

  • Lim, Jin-Sang;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.1-9
    • /
    • 2018
  • This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.

Analyzing Productivity Enhancement and Task Replacement Rates in Digitized Construction Supervision Process: A Comprehensive Study with Construction Supervision Checklists in South Korea

  • Dahee KIM;Chanhyuk PARK;Wangyoung JUNG;Wisung YOO;Joonseo LEE;Seongmi KANG
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.815-822
    • /
    • 2024
  • This study aims to facilitate the integration of digital technology into construction supervision by leveraging construction supervision checklists, a fundamental tool for inspections in this field. To achieve this, this research analyzed the tools and practices used in construction supervision, identifying 12 key supervision task types. These task types formed the basis for developing four distinct digital technologies, each tailored to specific inspection tasks based on practical feasibility. A checklist development process followed with the use of predefined criteria. Checklist items from the Ministry of Land, Infrastructure, and Transport of South Korea were analyzed and categorized according to the identified inspection task types. Digital technologies were then integrated for each task type, with corresponding supervision locations documented. This process enhanced the checklist's effectiveness by incorporating methods for digitizing tasks. The findings suggested that approximately 61% of traditional tasks could be potentially replaced by digital technology, highlighting the potential for successful digitization implementation. In addition, surveys among industry professionals provided insights into the level of productivity enhancement achievable through technology adoption compared to traditional practices, offering a basis for predicting productivity improvements across various disciplines. In conclusion, this research supports the effective integration of digital technology into construction supervision through an enhanced checklist. It also sheds light on practitioners' perceptions of technology usage and aids in developing strategies for technology adoption in this domain.

A Study on the ISO 9001 Application of Railway Supervision work (철도 감리 업무의 ISO 9001 적용에 대한 고찰)

  • Jang Seog-Jae;Hwang In-Bum;Sung Jung-Hwa;Kim Hae-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.325-329
    • /
    • 2006
  • Quite a few of persons often fall into an error that ISO has happened an additional work at construction sites. Supervision works, however, are carried out in compliance with 'Guidelines for the Supervision Works' which is including most ISO Requirements. Additional requirements needed for the supervision works are not many. This study has studied on the ISO application of supervision works in relation to, 1) ISO 9001 & KS A 9001 Quality Management System Basic Model, 2) The Process of Railway Construction Work Supervision Quality Management Plan, 3) Supervision Work Performance Guide Book(2005) & KS A 9001(2001) Standard, at the railway construction sites.

Improving Construction Site Supervision with Vision Processing AI Technology (비전 프로세싱 인공지능 기술을 활용한 건설현장 감리)

  • Lee, Seung-Been;Park, Kyung Kyu;Seo, Min Jo;Choi, Won Jun;Kim, Si Uk;Kim, Chee Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.235-236
    • /
    • 2023
  • The process of construction site supervision plays a crucial role in ensuring safety and quality assurance in construction projects. However, traditional methods of supervision largely depend on human vision and individual experience, posing limitations in quickly detecting and preventing all defects. In particular, the thorough supervision of expansive sites is time-consuming and makes it challenging to identify all defects. This study proposes a new construction supervision system that utilizes vision processing technology and Artificial Intelligence(AI) to automatically detect and analyze defects as a solution to these issues. The system we developed is provided in the form of an application that operates on portable devices, designed to a lower technical barrier so that even non-experts can easily aid construction site supervision. The developed system swiftly and accurately identifies various potential defects at the construction site. As such, the introduction of this system is expected to significantly enhance the speed and accuracy of the construction supervision process.

  • PDF

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

Priority Analysis for Applying Digital Technology to Improve the Efficiency of Building Supervision Work (건축감리 업무의 효율성 제고를 위한 디지털 기술 적용 우선순위 분석)

  • Kim, Chang-Won;Yoo, Wi Sung;Lim, Hyunsu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.93-102
    • /
    • 2023
  • Building supervision can be defined as a major task that involves managing and supervising the construction process to support the creation of high-quality results. To successfully perform supervision work, it is necessary to collect various information generated in uncertain field conditions, but today, supervision is performed based on documents such as reports, so there are limitations in collecting information. In fact, it has also been reported that the recent collapse of an apartment building in Korea was caused by limitations of information communication in th supervision work. Accordingly, this study analyzed the types of digital technologies that can be used to improve the efficiency of building supervision work, and presented the prioritized application of them. Priority application was quantitatively evaluated using analytic hierarchy process on data through a survey. It is expected that the results of this study can be used as basic data to set the roadmap of digital technology for building supervision in the future.

A Study on the Actual Condition of Electrical Construction Supervision and Countermeasure of It (전기분야감리제도의 운영실태 및 개선방안에 관한 연구)

  • 고선환;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.147-150
    • /
    • 2002
  • Domestic electrical construction inspection system was introduced into building site in 1963 by registered architects' law, meanwhile, inspector appointed by ministry of owners lake charge of Government managing building site. Afterwards several systems has been adopted to heal some problems each of them has revealed. These times Government granted authority for inspection on surveillancer, furthermore, formulate a supervising system which articulate the responsibilities of supervision and put it in effect as of 1st, January, 1994. This supervision system gets rid of factors causing faulty work to a considerable extent. However, as it is still in early stage, the system has various problems to overcome, For example, actual state of handling modifications of design in accordance with supervision system in field shows a difference between process provided by law and field process. Thus this study inquire and analyze actual condition of supervision system, at the same time, problems occuring in modifications of design under supervision, and then propose a way to improve it

  • PDF

A Study on the Management Information System for Supporting the Supervision of Construction Workplace (건설감리실무 지원을 위한 정보관리시스템 구축에 관한연구)

  • Noh, Dae-Won;Jeong, Byong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.85-93
    • /
    • 2003
  • The purpose of this study was to construct the management information system for supporting the supervision of construction workplace. For the purpose, firstly, this study surveyed the present states and the problems of construction workplace in Korea. And then, defined the range and the process of the supervision of construction workplace, and examined the information standards of construction and the CALS standards for supporting. As a result, this study proposed the first stage of management information system, which consists of several basic functions, such as, document management, system management and partially, duality management and construction information management.

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.