This study aims to derive key construction supervision work that can be digitalized among construction supervision work. The scope of the study includes domestic construction sites to which the Building Act of South Korea is applied. First, the construction supervision process was identified through extensive consultation of construction expert witnesses. Afterwards, the key construction supervision works for digitization were derived through survey results construction expert witnesses. Among the 24 supervision works throughout the pre-construction, construction, and post-construction stages, the proportion of supervision work manpower or cost, the type of data generated by supervision work and the urgency of introducing digital technology, and the impact on productivity and safety of supervision work were evaluated on a 5-point scale from "very low" to "very high" was investigated. The survey was conducted by t-test analysis, and as a result, it was possible to derive that the level of digitization was higher than average in "quality management," "safety management," and "collection and cooperation of maintenance instructions." It can be interpreted that digitization has been introduced on a pilot testing basis or has already been completed according to the needs of the site. On the other hand, it can be interpreted that the work that are obtained below the average score are considered to be realistically constrained at the construction site and that it is inevitable for the supervisor to proceed manually. Future studies include analyzing the quantitative impact of the key construction supervision work once digitalization is fully applied.
This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.
Dahee KIM;Chanhyuk PARK;Wangyoung JUNG;Wisung YOO;Joonseo LEE;Seongmi KANG
International conference on construction engineering and project management
/
2024.07a
/
pp.815-822
/
2024
This study aims to facilitate the integration of digital technology into construction supervision by leveraging construction supervision checklists, a fundamental tool for inspections in this field. To achieve this, this research analyzed the tools and practices used in construction supervision, identifying 12 key supervision task types. These task types formed the basis for developing four distinct digital technologies, each tailored to specific inspection tasks based on practical feasibility. A checklist development process followed with the use of predefined criteria. Checklist items from the Ministry of Land, Infrastructure, and Transport of South Korea were analyzed and categorized according to the identified inspection task types. Digital technologies were then integrated for each task type, with corresponding supervision locations documented. This process enhanced the checklist's effectiveness by incorporating methods for digitizing tasks. The findings suggested that approximately 61% of traditional tasks could be potentially replaced by digital technology, highlighting the potential for successful digitization implementation. In addition, surveys among industry professionals provided insights into the level of productivity enhancement achievable through technology adoption compared to traditional practices, offering a basis for predicting productivity improvements across various disciplines. In conclusion, this research supports the effective integration of digital technology into construction supervision through an enhanced checklist. It also sheds light on practitioners' perceptions of technology usage and aids in developing strategies for technology adoption in this domain.
Jang Seog-Jae;Hwang In-Bum;Sung Jung-Hwa;Kim Hae-Seok
Journal of the Korean Society for Railway
/
v.9
no.3
s.34
/
pp.325-329
/
2006
Quite a few of persons often fall into an error that ISO has happened an additional work at construction sites. Supervision works, however, are carried out in compliance with 'Guidelines for the Supervision Works' which is including most ISO Requirements. Additional requirements needed for the supervision works are not many. This study has studied on the ISO application of supervision works in relation to, 1) ISO 9001 & KS A 9001 Quality Management System Basic Model, 2) The Process of Railway Construction Work Supervision Quality Management Plan, 3) Supervision Work Performance Guide Book(2005) & KS A 9001(2001) Standard, at the railway construction sites.
Lee, Seung-Been;Park, Kyung Kyu;Seo, Min Jo;Choi, Won Jun;Kim, Si Uk;Kim, Chee Kyung
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.235-236
/
2023
The process of construction site supervision plays a crucial role in ensuring safety and quality assurance in construction projects. However, traditional methods of supervision largely depend on human vision and individual experience, posing limitations in quickly detecting and preventing all defects. In particular, the thorough supervision of expansive sites is time-consuming and makes it challenging to identify all defects. This study proposes a new construction supervision system that utilizes vision processing technology and Artificial Intelligence(AI) to automatically detect and analyze defects as a solution to these issues. The system we developed is provided in the form of an application that operates on portable devices, designed to a lower technical barrier so that even non-experts can easily aid construction site supervision. The developed system swiftly and accurately identifies various potential defects at the construction site. As such, the introduction of this system is expected to significantly enhance the speed and accuracy of the construction supervision process.
Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.161-162
/
2023
The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.
Journal of the Korea Institute of Building Construction
/
v.23
no.1
/
pp.93-102
/
2023
Building supervision can be defined as a major task that involves managing and supervising the construction process to support the creation of high-quality results. To successfully perform supervision work, it is necessary to collect various information generated in uncertain field conditions, but today, supervision is performed based on documents such as reports, so there are limitations in collecting information. In fact, it has also been reported that the recent collapse of an apartment building in Korea was caused by limitations of information communication in th supervision work. Accordingly, this study analyzed the types of digital technologies that can be used to improve the efficiency of building supervision work, and presented the prioritized application of them. Priority application was quantitatively evaluated using analytic hierarchy process on data through a survey. It is expected that the results of this study can be used as basic data to set the roadmap of digital technology for building supervision in the future.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2002.11a
/
pp.147-150
/
2002
Domestic electrical construction inspection system was introduced into building site in 1963 by registered architects' law, meanwhile, inspector appointed by ministry of owners lake charge of Government managing building site. Afterwards several systems has been adopted to heal some problems each of them has revealed. These times Government granted authority for inspection on surveillancer, furthermore, formulate a supervising system which articulate the responsibilities of supervision and put it in effect as of 1st, January, 1994. This supervision system gets rid of factors causing faulty work to a considerable extent. However, as it is still in early stage, the system has various problems to overcome, For example, actual state of handling modifications of design in accordance with supervision system in field shows a difference between process provided by law and field process. Thus this study inquire and analyze actual condition of supervision system, at the same time, problems occuring in modifications of design under supervision, and then propose a way to improve it
Journal of the Korea Institute of Building Construction
/
v.3
no.2
/
pp.85-93
/
2003
The purpose of this study was to construct the management information system for supporting the supervision of construction workplace. For the purpose, firstly, this study surveyed the present states and the problems of construction workplace in Korea. And then, defined the range and the process of the supervision of construction workplace, and examined the information standards of construction and the CALS standards for supporting. As a result, this study proposed the first stage of management information system, which consists of several basic functions, such as, document management, system management and partially, duality management and construction information management.
Journal of the Korean Institute of Landscape Architecture
/
v.49
no.1
/
pp.1-18
/
2021
This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.