• Title/Summary/Keyword: Construction step

Search Result 1,150, Processing Time 0.032 seconds

A Study on the Standard Joint Material and Reference Plane for the Standard of Construction in the Apartment (공동주택 시공표준화를 위한 조립기준면 및 표준마무리재에 관한 연구)

  • Lim, Seok-Ho;Park, Keun-Soo;Lee, Ga-Kyung
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.230-235
    • /
    • 2009
  • In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 10 years. So MC design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc. But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance. However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to extract the effect and question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare this result with existing construction method. The following project of this study is to survey of actual condition of interior components such as gypsum board, windows & doors etc. Therefore this study is to induce architectural long-life through architectural standardization construction and component's exchange, and, by the subject of the study on Apartment to have design guideline and basis for joining part between Gypsumboard and windows.

  • PDF

A Study on the Standard Joint Material and Reference Plane for the Standard of Construction in the Apartment - Joining Part between Gypsumboard and Windows - (공동주택 시공표준화를 위한 조립기준면 및 표준마무리재에 관한 연구 - 석고보드 마감재와 창호재의 접합부위를 중심으로 -)

  • Lim, Seok-Ho;Park, Keun-Soo;Lee, Ga-Kyung
    • Journal of the Korean housing association
    • /
    • v.20 no.4
    • /
    • pp.31-38
    • /
    • 2009
  • In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 10 years. So MC(Modular Coordination) design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc. But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance. However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to extract the effect and question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare this result with existing construction method. The following project of this study is to survey of actual condition of interior components such as gypsum board, windows & doors etc. Therefore this study is to induce architectural long-life through architectural standardization construction and component's exchange, and, by the subject of the study on Apartment to have design guideline and basis for joining part between Gypsumboard and windows.

A Study on the System and Process of the Construction and Management for the Royal Garden and Landscape in the Late Choson Dynasty (조선 후기 원유의 영선체제와 과정에 관한 연구)

  • 전영옥
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.73-90
    • /
    • 1998
  • The construction and management of the royal garden and landscape were the most significant project in Choson Dynasty. The kind of the royal garden and landscape were the rear garden of the palace, the groves of the royal shrine and orchard, etc. As the important project of the country, these constructions were controlled by the administrative system without division into the fields of engineering, building and landscaping. The purpose of this study is to investigate the administrative system. In particular, this study is focused on the construction and management of the royal garden and landscape in Hanyang from the 18th century to the late 19th century. This study is based on the analysis of historic documents and a survey of the relics. The results were summarized as follows : 1) The administrative system of the construction and management of the royal garden and landscape was composed of the government offices under Industry Board as a permanent organization - Yongjosa, Santaeksa, Chunchonsa, Songonggam, Changwonso - and Togam as a temporary organization. In addition to these organizations, there were Revenue Board, Ceremony Board, Military Board, which served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and Songonggam. The high cost works were carried out through Togam and normal repairing works were completed by Songonggam. In case of planting, those works were carried out through Chunchonsa and the military. The management in the 3rd step; This process was done by two parts like the process of works. In case of facilities, management was done 효 the officers of Pongshim. In case of groves of newly - planted trees, this management was done by Tongsanbyonlgam and Tongsanjik who served cultivation and harvest of fruit trees as an expert.

  • PDF

A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management (건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

Analysis of Multi-Story Prestressed Concrete Structure Considering the Effect of Construction Stage (시공단계의 영향을 고려한 프리스트레스 콘크리트 다층 구조물의 해석)

  • Jeon, Chan-Ki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.213-223
    • /
    • 2001
  • This paper presents an analytical procedure for the time-dependent analysis of the multi-story prestressed concrete structure under the construction stage. To account for the actual structural behavior, the procedure considers the effects due to the construction interval and the time-dependent losses of prestress at every construction step on the entire structural response. A numerical study is performed to demonstrate the general validity of the approach and to quantitatively evaluate the effects resulted from the time-dependent behaviors during construction. Recommendations and conclusions are developed by comparisons with structural responses using the present and conventional methods of analysis. The comparative results show that both effects of sequential construction and time-dependent prestress losses should be considered for the construction stage analysis.

  • PDF

A Model Tests on the Shape of Deformation caused by Sea dike Construction (방조제 축조에 따른 치환 및 융기의 형태에 관한 모형실험)

  • 장병욱;김성필;우철웅
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.419-424
    • /
    • 1998
  • The deduction methods for forced displacement depths caused by sea dike construction often assumed the shape of forced displacements and heaving. To investigate the shape of forced displacements and heaving, a model tests was performed. Results of the tests are as follows; 1) The shape of forced displacements can be assumed ellipse. 2) The shape of heaving can not be assumed uniform shape like a circle and Extents of heaving was varied with the loading height and width. 3) The shape of forced displacements caused by step construction, pebble embankments and soil embankments, also investigated.

  • PDF

Chimney Construction (굴뚝의 설계2)

  • Jang, Gi-In
    • Korean Architects
    • /
    • v.3 no.9 s.9
    • /
    • pp.44-51
    • /
    • 1968
  • This article discusses at a basic level the of chimney construction. The concept, design, and operation can be understood easily. This, of course, is the first step to orderly construction. The selection of the boiler as to type, capacity, etc., was summarized in brief. The over all planning of the boiler and chimney together was the main object of this article. The architectural books covering this subject are very technical and this article tries to make the understanding of the basic principles more easy for the beginner in architecture.

  • PDF

Chimney Construction (굴뚝의 설계)

  • Jang, Gi-In
    • Korean Architects
    • /
    • v.3 no.8 s.8
    • /
    • pp.27-32
    • /
    • 1968
  • This article discusses at a basic level the process of chimney construction. The concept, design, and operation can be understood easily. This, of course, is the first step to orderly construction. The selection of the boiler as to type, capacity, etc. was summarized in brief. The over all planning of the boiler and chimney together was the main object of this article. The architectural books covering this subject are very technical and this article tries to make the understanding of the basic principles more easy for the beginner in architecture.

  • PDF

Importance Analysis of Major Factors in Formwork Collapse Accident (거푸집 붕괴사고 주요 요인별 중요도 분석)

  • Park, Ji-Yeong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.249-256
    • /
    • 2021
  • Fatal accidents in the construction industry account for a higher proportion than other industries, and in particular, the collapse accident of formwork is likely to lead to a serious accident like death. This study aim to derive the importance ranking of formwork collapse factors using AHP technique for preventing fatal accident. The AHP survey was conducted on field construction engineers, construction project managers, safety managers, and formwork specialist foreman with 10 years on site experience. The results of AHP analysis is that the most importance factor of formwork collapse accident is 'non-compliance with the formwork shoring assembly drawing'. Next it is important in the order of 'poor installation of formwork shoring and accessories', 'formwork shoring is not installed vertically', 'non-compliance with the concrete curing period of the formwork shoring', 'safety supervisor not designated and negligent'. It is necessary to preferentially and intensively manage the high importance factors presented as a result of this research for reducing formwork collapse accident. In addition, it will contribute to reducing construction safety accidents if the factors of the formwork collapse accident suggested in this research are included in the formwork inspection check list and checked step by step in formwork construction.

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF