FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구 (A Study on Development of Remote Site Monitoring System in Public Road Construction Projects)

  • 옥현
    • 한국도로학회논문집
    • /
    • 제14권6호
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

RTSP기반 건설현장 원격관리 시스템 구축 (Establishment of RTSP-based construction site remote management system)

  • 우윤희;윤효운;유무영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.165-166
    • /
    • 2023
  • Construction inspection and monitoring are key activities in construction projects. Automation of inspection tasks improves the limitations and inefficiencies of manual construction inspections, enabling systematic and consistent construction inspections. In this paper, an RTSP (Real-Time Streaming Protocol) system is used to remotely manage and supervise the construction site without having to visit the construction site by deploying a robot on site on behalf of four construction stakeholders (owner, supervisor, constructor, and designer). I would like to propose. The proposed system can contribute to identifying and monitoring the process process and work results at the construction site in real time.

  • PDF

Opportunities for construction site monitoring by adopting first personal view (FPV) of a drone

  • Kim, Seungho;Kim, Sangyong
    • Smart Structures and Systems
    • /
    • 제21권2호
    • /
    • pp.139-149
    • /
    • 2018
  • Understanding the current status of a construction project is necessary to achieve successful on-site management. Real-time information delivery is a major concern for construction industry practitioners in order to expedite decisions and discussions. We propose the use of a first personal view (FPV) system of a quadcopter drone as a tool for monitoring on-site status and communicating between construction participants. The most important function of the drone FPV system is its ability to visually monitor construction site situations in real time. An on-site management system process is developed, verified, and applied to several construction work tasks after determining factors that affect efficient construction management. The proposed system is expected to assist the construction manager in achieving high efficiency.

AUTOMATING SUPERVISORY MANPOWER ALLOCATION FOR CONSTRUCTION SITES

  • Jieh-Haur Chen;Li-Ren Yang;W. H. Chen;C. K. Chang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.239-248
    • /
    • 2007
  • In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.

  • PDF

드론 및 비전 프로세싱 기술을 활용한 디지털 건설현장 관리에 대한 연구 (Research on Digital Construction Site Management Using Drone and Vision Processing Technology)

  • 서민조;박경규;이승빈;김시욱;최원준;김치경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.239-240
    • /
    • 2023
  • Construction site management involves overseeing tasks from the construction phase to the maintenance stage, and digitalization of construction sites is necessary for digital construction site management. In this study, we aim to conduct research on object recognition at construction sites using drones. Images of construction sites captured by drones are reconstructed into BIM (Building Information Modeling) models, and objects are recognized after partially rendering the models using artificial intelligence. For the photorealistic rendering of the BIM models, both traditional filtering techniques and the generative adversarial network (GAN) model were used, while the YOLO (You Only Look Once) model was employed for object recognition. This study is expected to provide insights into the research direction of digital construction site management and help assess the potential and future value of introducing artificial intelligence in the construction industry.

  • PDF

Investigation of health and safety impact from the 'Site BIM' tools in the live construction sites

  • Shah, Raj;Edwards, Joel
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.1-7
    • /
    • 2016
  • Construction in the UK is the second most dangerous industry in terms of fatal and minor injuries according to the 2014 report of HSE. The use of mobile devices such as iPad, Tablets and Smart phones on the live construction projects is also on the increase in the UK due to the 2016 - Level 2 BIM (Building Information Modelling) implementation target, set by the UK Government. Hence, the use of such devices may become a distraction from work activities on the construction sites and will cause a major risk to the end users. The subject of improving safety of BIM use is widely researched, but there is a gap in knowledge about the actual use of the mobile devices and perception of 'Site BIM', on the construction site activities. The main gap identified in the 'Site BIM' is the health and safety aspect of using such devices on the construction sites. A safer way of working with such devices needs to be identified to avoid any potential site hazards and fatalities before the widespread use of the devices are found on the construction projects. In that context, the paper is aimed to highlight the safety issues that are required to address for the successful implementation of the mobile devices for safer use of the 'Site BIM'. Questionnaire survey was used to collect the site information among construction professionals in the UK. The survey findings suggested that a proactive approach may be helpful to stop potential hazards and risks causing by the use of mobile devices and potential measures need to be identified before any injuries and incidents occur. The paper concludes that training, changing size of mobile devices and ensuring a separate induction training for 'Site BIM' tools will improve the health and safety of the end users of the mobile devices at the live construction sites.

밀도분석에 의한 공동주택 현장관리 인력 배치계획 분석 (Investigation on the Manpower Staffing Plan Utiling Density Analysis Method)

  • 권기덕;김선국;손효원;최재휘;이동훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.119-123
    • /
    • 2010
  • Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.

  • PDF

백제(百濟) 혼축기단(混築基壇)의 연구(硏究) (A Study on Mixed Construction of Platform of Baikje)

  • 조원창
    • 건축역사연구
    • /
    • 제15권2호
    • /
    • pp.77-94
    • /
    • 2006
  • "Mixed construction of platform" means the platform which was constructed by mixing heterogeneous materials such as roof tiles or bricks with divided stone of trimmed stone. This kind of construction technique was not known or found from the building sites of Goguryo or Silla so far and therefore it used to be understood as a unique platform construction technique or the product of technology and creativeness of Baikje's craftsman. The mixed construction of platform of Baikje came to position itself as one of the patterns of platform mainly used over Sabi period and we found the pattern from the sites including Imryugak site in Gongju, temple for royal tomb in Gwanbuk-ri, Wangheungsa Temple site, building site in Keumseong Mountain, Ohapsa Temple site in Byryeong. From the fact that they used a variety of materials which they could easily get around them such as roof tiles or bricks in addition to stones for the construction of platforms, we can see the feasibility and decoration characteristics of their material supply at that time. On the other hand, this mixed construction of platform was not popular in Goguryo and Silla, the major reason for which is judged to be non-existence of platforms to construct using bricks or roof tiles which could be constructed together with platform using divided stones. This is supported by the results of excavation of Hwangryongsa Temple site, Bunhwangsa Temple site, Heungryunsa Temple site of Silla which gave us comparatively abundant excavation data, and Jeongreungsa Temple site, Cheongamsa Temple site, Toseongrisa Temple site and building site in Daeseong Mountain castle and Anhak Palace site of Goguryo. For further progressive study on the mixed construction of platform of Baikje in the future, we will have to review more on the social background and technical background with the linkage with archeology and architecture at that time which led to the creation of such platform.

  • PDF

건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발 (Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site)

  • 진교홍;이혜원;김지홍
    • 한국정보통신학회논문지
    • /
    • 제8권1호
    • /
    • pp.192-199
    • /
    • 2004
  • 건설공사가 대형화, 복잡화 그리고 전문화 되어감에 따라 공사의 정보도 양적으로 팽창하고, 질적으로도 고도 전문화되어 가고 있으므로, 공정관리를 보다 효율적으로 관리하기 위한 전산시스템의 필요성이 대두되고 있다. 현재는 현장사무소에만 전산시스템을 도입하여 공정관리를 수행하고 있으며, 공정관리를 위한 데이터를 입력하고 확인하는 작업은 건설현장에서 현장사무소까지 직접 도보로 이동하여 처리하고 있다. 이에 따라 본 논문에서는 건설현장과 현장사무소를 이어주는 무선통신시스템을 구축하고, 건설현장에서 PDA를 이용하여 즉각적으로 본사의 데이터베이스에 공정데이터를 입력하고 확인할 수 있는 응용프로그램을 개발하였다. 이를 통해 기존의 건설현장에서 이루어지던 공정관리를 개선하여 인력, 장비, 시간, 비용 등을 절감할 수 있는 효과를 기대할 수 있다.