• Title/Summary/Keyword: Construction simulation

Search Result 2,798, Processing Time 0.029 seconds

Development of Real-time Simulator for Vehicle Electric Brake System (차량 전자 제동 시스템을 위한 실시간 시뮬레이터 개발)

  • Cheon, Se Young;Choi, Seong Woong;Yang, Soon Yong
    • Journal of Drive and Control
    • /
    • v.16 no.1
    • /
    • pp.22-28
    • /
    • 2019
  • This paper develops ABS braking real - time simulator to develop vehicle braking system by simulation. Recently, real-time simulation is widely used in the development of vehicles to decrease development time. In the field of electronic braking, real-time simulation is actively underway. In order to simulate electronic braking model in real time, a vehicle model, a hydraulic model, and a control S/W model are required. These models must be calculated in one platform. Therefore, in this paper, a vehicle model composed of CarSim and a hydraulic model composed of SimulationX using S/W in actual ABS controller was developed as a Simulink model base and linked with Matlab real time model. Using this real-time model, design effects of the electronic braking controller were simulated according to road surface condition to verify its operability.

A FEASIBILITY STUDY ON THE NUMERICAL PRE-ASSEMBLY SIMULATION USING 3D LASER SCANNING MEASUREMENT

  • Kyoungmin Kim ;Seok Kim ;Chan-Hyuk Park ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1193-1198
    • /
    • 2005
  • The pre-assembly takes a large portion of the fabrication cost of steel bridges. In order to save the fabrication cost through the improvement of the conventional pre-assembling process, this research investigates a numerical pre-assembly simulation as an alternative to current pre-assembling process. The 3D laser scanning was utilized in site and measuring data for steel box were analyzed. The productivity of pre-assembly simulation system is compared with the conventional pre-assembling system. This paper identifies feasibility on the alternative pre-assembling process and then proposes the scheme of the pre-assembly simulation system development satisfying the current pre-assembly inspection of standards.

  • PDF

A Study on the Analysis of Simulation for Improvement Evacuation Safety Assessment of Building in Fire (건축물의 화재 시 피난안전성 평가 개선을 위한 시뮬레이션 분석 연구)

  • Kim, Hye-won;Kim, Yoon-Seong;Lee, Byeong-Heun;Jin, Seung-Hyeon;Koo, In-Hyuk;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.107-108
    • /
    • 2020
  • There is a need to analyze various factors in evacuation safety assessment of building in fire. In the current performance based design, evacuation safety assessment in case of fire is being conducted through the simulation as FDS and Pathfinder. However, the location and size of the door, the location of evacuation in the event of a fire are not considered when design. Accordingly, it is difficult to determine the worst case scenario considering the actual fire. Therefore in this study, in this study, we will propose an appropriate evaluation plan through simulation considering the worst-case scenario that may occur in case of fire.

  • PDF

An Internet-based computing framework for the simulation of multi-scale response of structural systems

  • Chen, Hung-Ming;Lin, Yu-Chih
    • Structural Engineering and Mechanics
    • /
    • v.37 no.1
    • /
    • pp.17-37
    • /
    • 2011
  • This paper presents a new Internet-based computational framework for the realistic simulation of multi-scale response of structural systems. Two levels of parallel processing are involved in this frame work: multiple local distributed computing environments connected by the Internet to form a cluster-to-cluster distributed computing environment. To utilize such a computing environment for a realistic simulation, the simulation task of a structural system has been separated into a simulation of a simplified global model in association with several detailed component models using various scales. These related multi-scale simulation tasks are distributed amongst clusters and connected to form a multi-level hierarchy. The Internet is used to coordinate geographically distributed simulation tasks. This paper also presents the development of a software framework that can support the multi-level hierarchical simulation approach, in a cluster-to-cluster distributed computing environment. The architectural design of the program also allows the integration of several multi-scale models to be clients and servers under a single platform. Such integration can combine geographically distributed computing resources to produce realistic simulations of structural systems.

Developing an Evacuation Evaluation Model for Offshore Oil and Gas Platforms Using BIM and Agent-based Model

  • Tan, Yi;Song, Yongze;Gan, Vincent J.L.;Mei, Zhongya;Wang, Xiangyu;Cheng, Jack C.P.
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.32-41
    • /
    • 2017
  • Accidents on offshore oil and gas platforms (OOGPs) usually cause serious fatalities and financial losses considering demanding environment platforms locate and complex topsides structure platforms own. Evacuation planning on platforms is usually challenging. The computational tool is a good choice to plan evacuation by emergency simulation. However, the complex structure of platforms and varied evacuation behaviors usually weaken the advantages of computational simulation. Therefore, this study developed a simulation model for OOGPs to evaluate different evacuation plans to improve evacuation performance by integrating building information modeling (BIM) and agent-based model (ABM). The developed model consists of four parts: evacuation model input, simulation environment modeling, agent definition, and simulation and comparison. Necessary platform information is extracted from BIM and then used to model simulation environment by integrating matrix model and network model. During agent definition, in addition to basic characteristics, environment sensing and dynamic escape path planning functions are also developed to improve simulation performance. An example OOGP BIM topsides with different emergent scenarios is used to illustrate the developed model. The results showed that the developed model can well simulate evacuation on OOGPs and improve evacuation performance. The developed model was also suggested to be applied to other industries such as the architecture, engineering, and construction industry.

  • PDF

State of the Art of Virtual Construction System based on 3D Object for Design Phase (설계단계 활용을 위한 3D객체기반 가상건설시스템 개발 현황)

  • Ji, Sang-Bok;Kang, Leen-Seok;Bae, Cheol-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.68-73
    • /
    • 2008
  • Recently, construction management technology based on information technology is being changed from numerical information management to visual information management with virtual reality (VR) method. This study suggests a IDEF0 model for development process of VR system for the planning, design and construction phases of civil engineering project. And the simulation functions by each phase based on VR were developed by using the suggested IDEF0 model. The developed virtual construction system can be used as an effective design review tool by visualization of design information based on 3D object.

  • PDF

Earthwork Planning via Reinforcement Learning with Heterogeneous Construction Equipment (강화학습을 이용한 이종 장비 토목 공정 계획)

  • Ji, Min-Gi;Park, Jun-Keon;Kim, Do-Hyeong;Jung, Yo-Han;Park, Jin-Kyoo;Moon, Il-Chul
    • Journal of the Korea Society for Simulation
    • /
    • v.27 no.1
    • /
    • pp.1-13
    • /
    • 2018
  • Earthwork planning is one of the critical issues in a construction process management. For the construction process management, there are some different approaches such as optimizing construction with either mathematical methodologies or heuristics with simulations. This paper propose a simulated earthwork scenario and an optimal path for the simulation using a reinforcement learning. For reinforcement learning, we use two different Markov decision process, or MDP, formulations with interacting excavator agent and truck agent, sequenced learning, and independent learning. The simulation result shows that two different formulations can reach the optimal planning for a simulated earthwork scenario. This planning could be a basis for an automatic construction management.

Galloping of steepled main cables in long-span suspension bridges during construction

  • An, Yonghui;Wang, Chaoqun;Li, Shengli;Wang, Dongwei
    • Wind and Structures
    • /
    • v.23 no.6
    • /
    • pp.595-613
    • /
    • 2016
  • Large amplitude oscillation of steepled main cables usually presents during construction of a long-span bridge. To study this phenomenon, six typical main cables with different cross sections during construction are investigated. Two main foci have been conducted. Firstly, aerodynamic coefficients of a main cable are obtained and compared through simulation and wind tunnel test: (1) to ensure the simulation accuracy, influences of the numerical model's grid size, and the jaggy edges of main cable's cross section on main cable's aerodynamic coefficients are investigated; (2) aerodynamic coefficients of main cables at different wind attack angles are obtained based on the wind tunnel test in which the experimental model is made by rigid plastic using the 3D Printing Technology; (3) then numerical results are compared with wind tunnel test results, and they are in good agreement. Secondly, aerodynamic coefficients of the six main cables at different wind attack angles are obtained through numerical simulation. Then Den Hartog criterion is used to analyze the transverse galloping of main cables during construction. Results show all the six main cables may undergo galloping, which may be an important reason for the large amplitude oscillation of steepled main cables during construction. The flow structures around the main cables indicate that the characteristic of the airflow trajectory over a steepled main cable may play an important role in the galloping generation. Engineers should take some effective measures to control this harmful phenomenon due to the big possibility of the onset of galloping during the construction period.

Real-time prediction on the slurry concentration of cutter suction dredgers using an ensemble learning algorithm

  • Han, Shuai;Li, Mingchao;Li, Heng;Tian, Huijing;Qin, Liang;Li, Jinfeng
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.463-481
    • /
    • 2020
  • Cutter suction dredgers (CSDs) are widely used in various dredging constructions such as channel excavation, wharf construction, and reef construction. During a CSD construction, the main operation is to control the swing speed of cutter to keep the slurry concentration in a proper range. However, the slurry concentration cannot be monitored in real-time, i.e., there is a "time-lag effect" in the log of slurry concentration, making it difficult for operators to make the optimal decision on controlling. Concerning this issue, a solution scheme that using real-time monitored indicators to predict current slurry concentration is proposed in this research. The characteristics of the CSD monitoring data are first studied, and a set of preprocessing methods are presented. Then we put forward the concept of "index class" to select the important indices. Finally, an ensemble learning algorithm is set up to fit the relationship between the slurry concentration and the indices of the index classes. In the experiment, log data over seven days of a practical dredging construction is collected. For comparison, the Deep Neural Network (DNN), Long Short Time Memory (LSTM), Support Vector Machine (SVM), Random Forest (RF), Gradient Boosting Decision Tree (GBDT), and the Bayesian Ridge algorithm are tried. The results show that our method has the best performance with an R2 of 0.886 and a mean square error (MSE) of 5.538. This research provides an effective way for real-time predicting the slurry concentration of CSDs and can help to improve the stationarity and production efficiency of dredging construction.

  • PDF

3D numerical simulation of group-pile foundation subjected to horizontal cyclic loading (3차원 수치해석을 이용한 군말뚝기초의 반복수평하중재하실험에 대한 연구)

  • Jin, Youngji-Ji;Kim, Jin-Man;Choi, Bong-Hyuck;Lee, Dea-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.515-518
    • /
    • 2010
  • Horizontal forces may form a major part of the loading system for structures supported on pile groups. It is known that during a strong earthquake, the dynamic behavior of a group-pile foundation is related not only to the inertial force coming from the superstructures but also to the deformation of the surrounding ground. Therefore, it is necessary to understand the behaviors of the group-pile foundations and superstructures during major earthquakes. In this paper, numerical simulation of real-scale group-pile foundation subjected to horizontal cyclic loading is conducted by using a program named as DBLEAVES. In the analysis, nonlinear behaviors of ground and piles are described by cyclic mobility model and axial force dependent model (AFD model). The purpose of this paper is to prove availability of the analysis method by comparing numerical results and test results.

  • PDF