• Title/Summary/Keyword: Construction scheme

Search Result 844, Processing Time 0.029 seconds

Investigation on the Description Method of Extrusion Die Surface using NURBS Surface Scheme (NURBS 곡면기법을 이용한 압출금형 곡면의 표현방법에 관한 연구)

  • 유동진;임종훈
    • Transactions of Materials Processing
    • /
    • v.12 no.2
    • /
    • pp.151-160
    • /
    • 2003
  • In the present study, an advanced surface construction method based on NURBS surface scheme is proposed to construct the extrusion die surface. The inlet and outlet profiles we precisely described with NURBS curves using the cubic appropriate control points and weights. The interior control Points of surface are generated using the cubic interpolation of the weights at the inlet and outlet sections. In order to verify of the proposed method, automatic surface generation is carried out for the various types of extrusion die surface.

COMPRESS MULTIPLE CIPHERTEXTS USING ELGAMAL ENCRYPTION SCHEMES

  • Kim, Myungsun;Kim, Jihye;Cheon, Jung Hee
    • Journal of the Korean Mathematical Society
    • /
    • v.50 no.2
    • /
    • pp.361-377
    • /
    • 2013
  • In this work we deal with the problem of how to squeeze multiple ciphertexts without losing original message information. To do so, we formalize the notion of decomposability for public-key encryption and investigate why adding decomposability is challenging. We construct an ElGamal encryption scheme over extension fields, and show that it supports the efficient decomposition. We then analyze security of our scheme under the standard DDH assumption, and evaluate the performance of our construction.

A Study On The Design Of Control Algorithm For Vibration Isolator And its Experiments (제진장치의 제어기 설계와 실험에 관한 연구)

  • Le, Dang Khanh;Nam, Taek-Kun;Roh, Young-Oh
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2011.06a
    • /
    • pp.219-220
    • /
    • 2011
  • In this paper the construction of vibration isolator using induction motor and its experiments are introduced. The vibration isolator is composed by plate, crank, electric motor and laser sensor to measure the displacement of plate. A control scheme to isolate the vibration signals due to the load variance and disturbance is designed with pole-placement and Routh-Huritz method. Experiments are also applied to confirm the effectiveness of the proposed control scheme.

  • PDF

Efficient Fuzzy Identity-Based Encryption Scheme (효율적인 퍼지 아이디 기반 암호화 방법)

  • Lee, Kwang-Su;Lee, Dong-Hoon
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.563-565
    • /
    • 2008
  • In this paper, we construct an efficient fuzzy identity-based encryption scheme in the random oracle model. The fuzzy identity-based encryption is an extension of identity-based encryption schemes where a user's public key is represented as his identity. Our construction requires constant number of bilinear map operations for decryption and the size of private key is small compared with the previous fuzzy identity-based encryption of Sahai-Waters. We also presents that our fuzzy identity-based encryption can be converted to attribute-based encryption schemes.

  • PDF

Improvement Scheme of System for Apartment Housing Remodeling Activity (우리나라 공동주택의 리모델링 활성화를 위한 제도 개선 방안)

  • Kim Yong-Sung;Lee Chan-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.57-67
    • /
    • 2001
  • In 1999, a residence stock amounts to 11 million units and apartment housing holds 57.6 percent of the residence stock. Without proper remodeling for apartment housing, a significant portion of them would be expected to be demolished shorter than their life-time due to socioeconomic reasons. Apartment housing is maintained depending on government regulations such as 'Housing Construction Promotion Code' and 'Apartment Housing Maintenance Ordinance'. However, there are many problems with implementation of them. In order to solve the problems, we focus on the remodeling system that includes Maintenance of Apartment Housing, Finance and Taxation, Special Repair Appropriation Budget, Resource Quality and Standard Plan, and Remodeling associated with the code. And this study, which being compared with the foreign remodeling system, presents the improvement scheme of system for apartment housing remodeling. This study aims to promote remodeling apartment housing and provide the suitable scheme for remodeling activities.

  • PDF

Modelling of On-Site Energy Consumption Profile in Construction Sites and a Case Study of Earth Moving

  • Yi, Kyoo-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.10-16
    • /
    • 2013
  • The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. According to the greenhouse reduction scheme of Korean Government, construction sector targeted 7.1% reduction by 2020. Although this target is not higher than other industrial sectors, it is not easy to achieve the reduction target without radical advance in technology, which cannot be expected to happen soon, considering the conservative characteristics of construction industry. Most researches on environmental issues focus on the issues related to energy saving matters during material production stage or maintenance stage, such as heating and insulation, and few deal with the issues directly related to the energy use in the construction sites. This research regards the operation of equipment for the on-site construction processes as a system and attempts to model the energy use processes related to the activities in construction sites, and provides simulation results of earth excavation and hauling processes. The result of this research is expected to aid construction planners estimating the time-based patterns of energy use and assessing greenhouse gas emission and to help selecting more energy efficient alternatives at the planning stage.

SYSTEM MODELLING OF ON-SITE ENERGY CONSUMPTION PROFILE IN CONSTRUCTION SITES AND A CASE STUDY OF EARTH MOVING

  • Kyoo-Jin Yi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.287-293
    • /
    • 2013
  • The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. According to the greenhouse reduction scheme of Korean Government, construction sector targeted 7.1% reduction by 2020. Although this target is not higher than other industrial sectors, it is not easy to achieve the reduction target without radical advance in technology, which cannot be expected to happen soon, considering the conservative characteristics of construction industry. Most researches on environmental issues focus on the issues related to energy saving matters during material production stage or maintenance stage, such as heating and insulation, and few deal with the issues directly related to the energy use in the construction sites. This research regards the operation of equipment for the on-site construction processes as a system and attempts to model the energy use processes related to the activities in construction sites, and provides simulation results of earth excavation and hauling processes. The result of this research is expected to aid construction planners estimating the time-based patterns of energy use and assessing greenhouse gas emission and to help selecting more energy efficient alternatives at the planning stage.

  • PDF

A Study on Information Scheme for IETM Implementation in Construction (건설분야 전자매뉴얼 구현을 위한 정보체계에 관한 연구)

  • Jeong, Seong-Yun;Kim, Seong-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.11a
    • /
    • pp.125-128
    • /
    • 2005
  • 건설산업의 특성 상 도로, 교량 등 하나의 시설물을 준공하여 유지관리하기까지 설계 기준서, 시방서, 규격서, 보고서 등 각종 건설 제기준과 기술문서를 지속적으로 참조하여야 한다. 이러한 문서를 언제, 어디서, 누구나 쉽고 편리하게 공유 및 재활용할 수 있도록 전자매뉴얼체계를 건설분야에 도입하고자 본 연구를 수행하였다. 전자매뉴얼 구축에 필요한 요소기술과 기능기술을 분석하였다. 분석된 요소 및 기능기술에 부합하도록 XML 스키마 기반으로 한 35종의 전자매뉴얼 정보체계를 개발하였다.

  • PDF

A study on the Application Scheme of the Warranty contract in constructions (건설공사의 성능계약 도입방안에 관한 연구)

  • Kim, Dae-Gil;Jeong, Ho-Geun;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.89-92
    • /
    • 2007
  • Since 1960s, advanced constructions have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction. However, the interior of a country encounter another problem result from Defects Liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

Efficient Elitist Genetic Algorithm for Resource-Constrained Project Scheduling

  • Kim, Jin-Lee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.235-245
    • /
    • 2007
  • This research study presents the development and application of an Elitist Genetic Algorithm (Elitist GA) for solving the resource-constrained project scheduling problem, which is one of the most challenging problems in construction engineering. Main features of the developed algorithm are that the elitist roulette selection operator is developed to preserve the best individual solution for the next generation so as to obtain the improved solution, and that parallel schedule generation scheme is used to generate a feasible solution to the problem. The experimental results on standard problem sets indicate that the proposed algorithm not only produces reasonably good solutions to the problems over the heuristic method and other GA, but also can find the optimal and/or near optimal solutions for the large-sized problems with multiple resources within a reasonable amount of time that will be applicable to the construction industry. This paper will help researchers and/or practitioners in the construction project scheduling software area with alternative means to find the optimal schedules by utilizing the advantages of the Elitist GA.