Value Engineering Idea Generation for Temporary Construction Designs through Conflict Resolution (가시설 공사 설계VE 대안검토시 모순충돌 해결을 통한 아이디어 창출)

  • Hong, Soonheon;Baeg, Hangee;Moon, Sungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.30-37
    • /
    • 2013
  • Idea creation is the most important step in the overall value engineering (VE) process. Usually the activity is done mostly relying on the experience and knowledge of the experts in the VE team. A more organized approach is needed to find the chance of design improvement during a VE workshop. This study presents an organized approach to increasing the chance of idea creation during the VE workshop. The concept of conflict resolution in TRIZ (Theory of Inventive Problem Solving) is applied to understand the problem area during design improvement. The technical parameters were identified in the problem area to explain the conflicts in design improvement. These technical parameters were used to assist problem solving and improve design functions. A case study was done on a temporary construction operation, and demonstrated that the organized idea creation can help improve the design value of the temporary construction operation.

Optimal Scheduling based on Probabilitic Estimation of Construction Duration (확률적 공기산정에 의한 공정 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-387
    • /
    • 2003
  • Construction project has many problem such as delay of the appointed date delivery, over budget, wether and site conditions. When several activities are influenced by the same factor, their duration may be delayed. This paper deals with the problem of construction duration estimating and schedule variation on the construction project. The theory of constraints technique for project management is referred to 'Critical Chain' technique. This paper shows optimal scheduling plan and time management technique, used probability construction duration estimating and scheduling buffer based on the critical chain project management.

  • PDF

The Estimation of $CO_2$ Emission Cost on Roof Waterproofing Types Using Input-Output Table (산업연관표를 이용한 지붕방수공법별 $CO_2$ 배출량 산정)

  • Jung, Young-Chul;Park, Gyu-Tae;Lee, Byung-Yun;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.243-246
    • /
    • 2010
  • Recently, global warming problem is a major issue in international community. The carbon dioxide ($CO_2$) emissions in the construction industry is one of the main factors causing a global warming problem. Accordingly, various researches on $CO_2$ emissions caused by the construction industry is needed and construction methods which is low $CO_2$ emissions should be developed. In this study, $CO_2$emission cost is compared with roof waterproofing types in construction phase. As a result, the $CO_2$ emission costs of asphalt waterproofing is the highest. This research is to provide basic information for selecting appropriate construction methods in aspect of low $CO_2$ emission cost.

  • PDF

A study on the efficient way of recycled aggregate (순환골재의 활용화 방안에 관한 연구)

  • Ji kun-chang;Park ho-gyun;Yun se-jeong;Kim chang-duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.556-560
    • /
    • 2004
  • The recent increase of the construction business. reflects tile rapid increase of the amounts of construction wastes caused by new buildings and demolitions. This trend brings about a problem of insufficient aggregate in the construction arena because construction wastes from new buildings are usually reclaimed in the land and it causes environmental pollution and a restriction of exploiting a natural aggregate, brought up by environmental organizations as well. Accordingly, researchers suggest recycled aggregate as a countermeasure of the two problems, however, it's not actually been used in the construction fields. By this study, it'll be feasible to expect to solve the problem of insufficient aggregate and to reduce environmental pollution from waste-reclamation.

  • PDF

Study on Work-Efficiency in feild of PFB(POSCO E&C Fire Board) for High Sterength Concrete Spalling Control (고강도콘크리트 폭열 방지공법(PFB 공법)의 현장 적용성 평가에 관한 연구)

  • Kim, Woo-Jae;Jung, Sang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.173-176
    • /
    • 2008
  • There are researches are in progress on ensuring the safety of the high impact concrete in cases of fire which is a current rising social problem and this research institute also developed PFB technology, the explosion preventing technology. PFB technology is to apply POSCO E&C Fire Board, a fireproof board, with an adhesive agent on the construction site, and this technology passed 3-hour fireproof test and this technology was proven from a previous research that the temperature of main root is maintained under 200 ℃. Therefore, tests on basic contents to be examined before the actual construction in this research by with a wooden prototype of a full scale to apply PFB technology to actual construction sites and tests are being done on the workability of fireproof board, the adhesive power, the resistance against imprint of wooden nail, the heat conductivity and etc. As the results of those tests, PFB technology was proven to have an excellent workability at a construction site and to be easy for processing and also this technology was proven to have a great the resisting power against imprint of wooden nail, so this research has confirmed that PFB technology has no problem to be applied on a construction site.

  • PDF

CRITICAL DRIVING FORCE FOR CONTRACTOR'S OPPORTUNISTIC BIDDING BEHAVIOR IN PUBLIC WORKS

  • Min-Ren Yan ;Wei Lo ;Chien-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.417-423
    • /
    • 2005
  • Contractor's opportunistic bidding behavior refers to contractor's deliberate low-bid, which cannot accord with the cost, and expectation for beyond-contractual reward (BCR), the compensation earned through cutting corners or claims after undertaking the construction project. This research applies System Dynamics to develop a model of contractor's pricing with consideration for dimensions of "cost", "market competition", and "BCR". Iterative computer simulations were performed to analyze the effects of contractor's pricing on the market price. The results were then examined by statistical analysis on data collected from 44 highway projects in Taiwan. It is found that the critical force driving the contractors to bid opportunistically is their excessive expectations in BCR under the current environment. Within the price competition mechanism, if the problem of BCR exists, even if the bidding system is further improved, contractors would still prefer opportunistic bidding behavior, and eventually make the whole construction industry operate ineffectively. Therefore, it is crucial to remedy the aforementioned BCR problem by more effective management policy.

  • PDF

Effect of Inadequate Design on Cost and Time Overrun of Road Construction Projects in Tanzania

  • Rwakarehe, Eradius E.;Mfinanga, David A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.15-28
    • /
    • 2014
  • Completing road construction projects within the budget and time has been a problem for the Tanzania National Roads Agency (TANROADS); and the major problem highlighted in almost all projects being inadequate design. However, the extent to which inadequate design contributes to both time and cost overruns and its causes remained under-studied. The objective of this study is therefore to determine the extent of the effect of inadequate design, its causes and remedial measures. The methodology used in this study includes reviewing recent projects completion reports, holding roundtable discussions with consultants and TANROADS officials and analyzing the information. Cost and time overruns for the reviewed projects averaged 44% and 26% respectively. Similarly, the extents to which inadequate design contributes to cost and time overruns were on average found to be 61% and 85% respectively. The overruns are predominantly related to problems that occurred during the design process. To alleviate the problem, TANROADS is advised to improve the management of design projects, enhance the process of reviewing design reports, improve the design process including introducing Road Safety Audit and geometric design manuals, and increase staff to match the work-load.

Intelligent Route Construction Algorithm for Solving Traveling Salesman Problem

  • Rahman, Md. Azizur;Islam, Ariful;Ali, Lasker Ershad
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.4
    • /
    • pp.33-40
    • /
    • 2021
  • The traveling salesman problem (TSP) is one of the well-known and extensively studied NPC problems in combinatorial optimization. To solve it effectively and efficiently, various optimization algorithms have been developed by scientists and researchers. However, most optimization algorithms are designed based on the concept of improving route in the iterative improvement process so that the optimal solution can be finally found. In contrast, there have been relatively few algorithms to find the optimal solution using route construction mechanism. In this paper, we propose a route construction optimization algorithm to solve the symmetric TSP with the help of ratio value. The proposed algorithm starts with a set of sub-routes consisting of three cities, and then each good sub-route is enhanced step by step on both ends until feasible routes are formed. Before each subsequent expansion, a ratio value is adopted such that the good routes are retained. The experiments are conducted on a collection of benchmark symmetric TSP datasets to evaluate the algorithm. The experimental results demonstrate that the proposed algorithm produces the best-known optimal results in some cases, and performs better than some other route construction optimization algorithms in many symmetric TSP datasets.

Investigation Study on Noise and Vibration Condition in Construction Site (건설공사장 소음.진동 실태조사에 관한 연구)

  • Sun, Hyo-Sung;Park, Young-Min;Jo, Youn-Hee
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.879-881
    • /
    • 2008
  • The construction noise and vibration is a serious social problem in the downtown. This results in many expenses and delays of construction process because of the satisfactory settlement of popular complaints. In this study, we analyze the dispute mediation cases on the damages of construction noise and vibration and the noise and vibration condition in construction sites by using questionnaire surveys.

  • PDF

The Effect of Force and Motion Conceptions into the Kinematics Graph Construction (대학생의 운동학 그래프 작성에 대한 역학 개념의 효과)

  • Kwon, Sung-Gi
    • Journal of The Korean Association For Science Education
    • /
    • v.17 no.4
    • /
    • pp.383-393
    • /
    • 1997
  • In order to study the effect of student's conceptions about force and motion into the graph construction in kinematics in college physics course, the tasks of constructing the qualitative graph in the similar problem context used in force conception was asked to the first 74 and third 97 student teacher in teachers' university. The frequencies analysis showed that student teachers had the naive conceptions that the throwing force was still acted to a upwarding ball. They also had the popular Aristotelian views about motion. These naive conceptions coexisted with the scientific conception about gravitational force. In a simple pendulum problem no one had the correct acceleration concepts which varies the direction in swing. This result suggest that student teacher had more difficulties in a acceleration problem than in a velocity problem In v-t and a-t graph construction tasks, the number of categories of a-t graphs were more than that of v-t graphs. There were many graph errors in a sign of velocity and acceleration. The acceleration conceptions without the relations of changes in velocity made the kinematics graphs more various shapes. The force and motion conceptions influenced the ability to construct the kinematics graphs.

  • PDF