• 제목/요약/키워드: Construction of evaluation

검색결과 5,359건 처리시간 0.03초

PERFORMANCE EVALUATION INDEX FOR COMPARING TRADITIONAL CONSTRUCTION METHODS WITH A ROBOT-BASED AUTOMATED CONSTRUCTION METHOD

  • Donguk Oh;Younghoon Lee;Ung-Kyun Lee;Nakju Lett Doh;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1088-1093
    • /
    • 2009
  • To improve construction productivity and quality, and to make the construction environment safe, a new system, Robot-based Construction Automation (RCA), is currently being developed in Korea. To determine whether RCA is an improvement over traditional construction methods (TCMs), an evaluation method, called the Performance Evaluation Index (PEI), is suggested for RCA. The PEI considers the relationships among the factors influencing the performance of the system obtained using the Delphi method and the analytic hierarchy process (AHP). As the evaluation shows, RCA is much better than TCM except for three factors: the rate of work success, quality improvement by learning experience, and construction duration.

  • PDF

A STUDY ON INTANGIBLE ASSET EVALUATION MODELING FOR CONSTRUCTION MANAGEMENT EFFICIENCY

  • Soyean Lim;Hyun-Chul Lee;Woo-Sung Yoon;Seong-Seok Go
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.876-882
    • /
    • 2009
  • With overall opening of global construction market by World Trade Organization (WTO) agreements, importance of management efficiency of construction industry which considers both tangible and intangible assets is recently being recognized in our nation. That is, efforts for reinforcement of competitiveness must be placed through maximization of values of internal and external intangible assets of construction industry such as management innovation, information, investment in technology and R&D and intellectual property. Accordingly in this study, evaluation criteria for intangible assets of construction industry were investigated and classified. Using such criteria, evaluation index and model were established based on the degree of importance of each criterion. The purpose of this study is to review importance of intangible assets in terms of competitiveness and management efficiency of construction industry and to provide basic data for establishment of intangible assets and revitalization of investment.

  • PDF

ENR 통계데이터를 활용한 글로벌 해외건설 경쟁력평가 기초연구 (A study on the oversea construction competitiveness evaluation by ENR data)

  • 한재구;박환표
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.185-187
    • /
    • 2011
  • The purpose of this study is to develop and apply the oversea construction competitiveness evaluation model which measures the competitiveness of construction companies in global construction market. This model consists of the design and construction competitiveness indexes by ENR statistic data and provides the oversea construction competitiveness index based on the evaluation model.

  • PDF

Global Construction Competitiveness Evaluation in 2016

  • Park, Hwanpyo;Han, Jaegoo
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.1-7
    • /
    • 2017
  • Korea's domestic construction market and overseas construction order environment are experiencing a decreasing trend, and this trend is expected to continue. Therefore, domestic construction companies are seeking to enter the global construction market. This study analyzes the global construction market and the global competitiveness for global construction companies and provides the results. To this end, this study has developed a model to evaluate the global construction competitiveness level and to evaluated global construction competitiveness in 2016. The evaluation of global construction competitiveness was analyzed based on the competitiveness of construction infrastructure by country, and the evaluation results of competitiveness of construction companies. These assessments were based on 20 detailed international statistics (ENR, Global Insight, Compass, etc.). The evaluation results are as follows. First, in regard to the comprehensive global construction competitiveness by country, America ranked first among 20 countries, followed by China. European countries like Spain, Germany and the Netherlands ranked third to fifth, respectively. Korea ranked sixth, one rank higher than that of the previous year. America and European countries remain strong. Second, in regard to the comprehensive building infrastructure competitiveness by country, America ranked first followed by Germany. Korea ranked twelfth, which is the same rank as that of the previous year. When it comes to stability in the construction market, China ranked first and Korea eighth. For construction systems, Sweden ranked first and Korea thirteenth, and for infrastructure, Japan ranked first and Korea tenth. Third, according to the construction company's capability evaluation by country, America ranked first followed by China. Korea ranked fourth, two ranks higher than that of the previous year because of its building competitiveness (fifth → fourth) and design competitiveness (eleventh → eighth) which has improved. When it comes to building competitiveness, China ranked first and Korea fourth. For design competitiveness, America ranked first and Korea eighth, and for price competitiveness, India ranked first and Korea seventh. However, Korea is still in the middle of the pack rank among the 20 countries considered when it comes to design competitiveness. It is ranked eleventh for design productivity and thirteenth for foreign sales against the total sales (internationalization). Thus, Korea needs to improve technical power and tap into new markets for improved competitiveness, including increased productivity. To do so, more R&D investment is required.

  • PDF

우리나라 초고층용(超高層用) 건설(建設)팩토리 개발(開發)을 위한 성능평가체계(性能評價體系)에 관(關)한 기초적(基礎的) 연구(硏究) (A Study on the Performance Evaluation System for the Construction Factory System Applied to High-Rise Building Construction in Korea)

  • 최원준;김창규;송인식;임상채
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 추계 학술논문 발표대회
    • /
    • pp.105-108
    • /
    • 2007
  • This study aims to develop a performance evaluation system for the Construction Factory(CF). The CF is a kind of full automation system for building construction which consists of the lifting system for building materials, the built-up unit for steel structural components, the bolting robots, the control center for the site management, and the site covering system. The CF is developing now as a project of the construction automation and robotics. In this study we firstly reviewed the state-of-the-art of the construction automation and robotics in the foreign and the domestic, and investigated the precedent case of the CF such as the SMART System of Shimizu Co., Japan. We believe that without an objective evaluation of the results there won't be growth in technological R&D. Therefore, this study sees the developing CF as an new technology and method in building construction, and proposes the direction and frame of the appropriate evaluation which can be applied into the CF.

  • PDF

국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구 (A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea)

  • 박보성;이태형;방홍순;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF

건설공사 사후평가시스템 입력오류 분석에 관한 연구 (A Study of Error Analysis for Post Evaluation System on the Construction Projects)

  • 김경훈;이두헌;김태영
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.77-85
    • /
    • 2015
  • 현재 건설공사 사후평가시스템 입력과정에서 자료가 오류 및 누락이 발생되는 경우가 많아 데이터의 신뢰성이 떨어지는 경우가 많다. 이에 따라 본 연구에서는 사후평가 결과분석의 신뢰성 확보를 위해 건설공사 사후평가시스템의 입력누락 및 입력오류에 대한 세부적인 분석을 실시하였다. 분석결과, 건설사업 초기 단계일수록 자료의 미입력된 자료의 비중이 높게 나타났다. 그리고 분석된 등록오류로는 참고자료의 부정확, "원" 단위 오류, 입력항목에 대한 이해부족 등으로 나타났다.

건설공사 사후평가 수행결과의 효과적인 분석방법 (Effective Analysis Framework for Construction Post Evaluation)

  • 김태영;박희성
    • 대한토목학회논문집
    • /
    • 제36권6호
    • /
    • pp.1145-1152
    • /
    • 2016
  • 건설공사 사후평가는 공공건설공사의 효율성을 평가하고, 사업결과에 대한 적정성을 검증하여 추후 유사한 건설공사에 활용 가능한 정보를 제공하기 위해 도입되었으나, 인식 부족 등에 의해 활발한 제도 이행은 미흡한 실정이다. 이에 본 연구는 건설공사 사후평가 수행결과를 활용하여 추후 유사한 프로젝트 수행 시 참고자료로 활용 가능한 기본적인 틀을 제공하는 것을 목적으로, 건설공사 사후평가 수행결과의 효과적인 분석방법을 제시하고 이를 토대로 시범적인 분석을 수행하였다. 분석은 사후평가 결과가 건설CALS에 입력된 국도, 고속도로, 철도, 항만 등 293건의 건설공사를 대상으로 하였다. 분석결과, 철도 사업의 공사비 증감율이 고속도로, 국도, 항만공사 보다 높게 나타났다. 그리고 고속도로의 공사기간 증감율은 철도, 국도, 항만보다 큰 것으로 나타났다. 본 연구를 통해 제시된 사후평가 분석 프레임워크는 추후 프로젝트에 유용한 정보를 제공하고 벤치마킹 도구로써 유용하며, 지속적인 건설공사 사후평가 수행을 통해 다양한 분석이 가능하다는 점에서 큰 의미가 있다.

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF

선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발 (Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries)

  • 이강욱
    • 한국산업융합학회 논문집
    • /
    • 제25권6_2호
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.