학교 복합시설의 운영에 관한 연구 -서울특별시 초등학교 시설을 중심으로- (Exploring the effective management of the school complexes -Based on the cases of the elementary schools in Seoul Metropolitan-)

  • 오해진;이재림
    • 교육녹색환경연구
    • /
    • 제8권2호
    • /
    • pp.1-11
    • /
    • 2009
  • The school complex project is driven by public calling for school facilities change due to the social change followed by the aging society and increasing interest in the lifelong education. The school complex project is defined as an activity in which the school facilities and space are not only used for students, but also for the local residents. Since the project was promoted in a link with reform of the education system in 2001, the demand in the expectation effect has been sharply increasing. Despite of the high expectation and attention, the school complex project, however, has been performed in a limit of efficiency. Consequently, public opinion calling for more structured and effective way on construction and administration has been certainly increasing. According to the strong demand, this study was carried out to provide basic data for, and suggest an approach to, more structured and effective way of establishment and administration of the school complex project by comparing the success cases in Seoul metropolitan city.

  • PDF

건설 분야 전자도면의 모델 기반 교환을 위한 IFC2.x2모델의 2차원 형상정보모델의 확장 개발에 관한 기초 연구 (Development of Two Dimensional Extension Model far IFC2.x2 Model in the Construction Field)

  • 김인한;서종철
    • 한국CDE학회논문집
    • /
    • 제10권2호
    • /
    • pp.121-132
    • /
    • 2005
  • There have been several efforts for the investigation of the formal development team which was formed in the IAI to develop a common 2D standard specification between ISO/STEP and IAI/IFC since 2002. As a result, a drafting model has been included in the IFC2.x2 model. However, to be used actively in the construction practice for construction drawing exchange, the IFC model should be extended to the paper space for multiple views, drawing output, and delivery of drawings. Therefore, in this paper, the methodology of relating STEP and IFC has been investigated and schema extension of paper space(drawing sheet, presentation view, view pipeline), complex entity(leader), and dimension(associative) have been achieved. The resulting, IFC model will enable a basic harmonization with KOSDIC. SCADEC, and STEP-CDS by retaining the current IFC architecture. In addition, IT systems for the construction industry can be beneficial from the developed data model.

도시철도 차량기지의 기반녹화에 적합한 방수시스템 선정을 위한 환경 조건 분석 (Analysis of Field Condition for Proper Waterproofing Materials applied to Green Roof System for Depot)

  • 민광만;권시원;최성민;곽규성;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 추계 학술논문 발표대회 논문집
    • /
    • pp.127-131
    • /
    • 2006
  • Depot have a lagged behind structure in the side of building up the view. With this reason, people have been recognized depot as hatred facility causes to have car noise, air pollution. In the other hand, depot become a underground and complex facility as a higher-value added building, and moreover, it need to understand the environment that depot structure have a specific field condition to apply green roof system. 1) Analysis proper waterproofing material and root barrier apply to depot need root penetrating test method 2) Suggest root barrier and waterproofing material relate to maintain and construction for green roof system 3) Construction condition for depot have crack movement of structure by vehicle vibration and root penetrating force by plant growth

  • PDF

복합용도건축물 내 공공도서관 건립에 관한 연구 - 서울시 공공도서관을 중심으로 - (A Study on the Establishment of a Public Library in Mixed-Use Complex - Focused on Public Libraries in Seoul -)

  • 김영석
    • 한국도서관정보학회지
    • /
    • 제45권3호
    • /
    • pp.395-414
    • /
    • 2014
  • 본 연구는 복합용도건축물 내에 공공도서관을 건립하는 것이 효율적인 공공도서관 인프라 확충 방안의 하나로 인식하였다. 서울에 있는 112개 모든 공립 공공도서관을 대상으로 도서관의 복합화 여부를 현장방문과 전화문의를 통해 조사하였다. 조사 결과 전체 도서관의 약 50%에 해당하는 55개 도서관이 복합건축물형이다. 복합용도건축물 내에 공공도서관을 효율적으로 설치하기 위해서는 도서관의 규모, 위치, 공간구성에 대해서 충분한 고려가 필요하겠다. 그리고 필요하다면 더 많은 상업시설, 학교시설 그리고 관시설과의 복합화가 필요하겠다.

건설CALS에서 고속도로인허가 시스템 구현 사례 (A Case Study on Implementing Highway Approval/Permission System in Construction CALS)

  • 윤주용;김민홍;이영재
    • 한국전자거래학회지
    • /
    • 제4권3호
    • /
    • pp.43-62
    • /
    • 1999
  • This paper is to analyze business activities of approval/permission (A/P) and to describe its problems. To conduct the A/P business activities currently, there are many problems such as complex business process and different business policies among the each organization. In order to solve the problems, this paper suggests the A/P system of highway construction CALS (Commerce at Light Speed). CALS, a top down vision of complete computing integration, promises to support electronic data exchange. The A/P system is designed to classified documents based on CALS standard and store them to database. The data register to the A/P system by the Internet, and each construction company can use the A/P system by Internet also. Benefits of the A/P system is reduction in junk documents for approval/permission actives, improvement in conduct and services life cycle support.

  • PDF

건설공사 진도관리의 현황 분석에 대한 연구 (Analysis of Construction Schedule Progress Management Practice)

  • 신윤경;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

비정형건축물의 IPD(Integrated Project Delivery) 도입 필요성 검토 (Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic)

  • 김성진;박성진;류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.308-309
    • /
    • 2014
  • A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.

  • PDF

DSM을 이용한 건설사업 공정관리에 관한 연구 (A Study on Schedule Management in Construction Project Using the Dependency Structure Matrix(DSM))

  • 장세훈;박문서;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.682-686
    • /
    • 2007
  • 건설사업은 다양한 시대적 요구를 충족시키기 위해 매우 다변화되었고, 그에 따라 참여주체들이 많아지고 복잡성이 증가하게 되었으며, 사업의 규모 측면에 있어서도 날로 대형화되어 가고 있는 실정이다. 하지만 현재의 건설 프로젝트 공정관리 수준은 1950년대에 만들어진 PERT나 CPM을 반세기가 지난 지금까지 그대로 사용하고 있을 정도로 후진성을 면치 못하고 있다. 또한 현재의 공정관리는 결과위주의 방식으로 건설사업 과정에서 나타나는 작업 간의 정보의 흐름과 변이요소의 발생을 충분히 고려하지 못하고 있다. 따라서 본 연구에서는 기존의 공정관리도구들의 단점을 개선하고 공정관리기술의 한계를 극복하기 위하여, 국내에는 잘 알려지지 않은 설계관리기법인 DSM(Dependency Structure Matrix)를 도입하여 건설사업 공정관리에 대한 적용성을 고찰해보고자 한다.

  • PDF

Lessons learned from Multinational Parties Involved Program Management Consortiums in Korea

  • KO, Ok-Yeol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.32-36
    • /
    • 2015
  • This study explores the issue of program management consortia involving multinational participants. The aim of this research was to leverage advantages in program management (PM) skills and PM model improvement in product line construction in mega scale construction programs, typically funded by public funds. Such ventures involve multinational parties using dedicated partnering based on a program management consortium (PMC) to reduce confrontation between parties in complex circumstances, allowing an open and non-adversarial approach to project management. This research also seeks to implement an ongoing feedback program of best practices and lessons learned to minimize the repetition of mistakes and to reduce costs in sequenced construction. Recently, the Korean government has planned to undertake three large new projects: the Korean Peninsula major river maintenance, the reclamation of Se-Mangum, and the Science/Business City. This paper starts by providing a framework for the cost-reduction strategy for the United States Forces Korea (USFK) Relocation Program, which will be funded with public funds and a private fund investment (PFI) that combines programs executed by two governments as owners and multinational stakeholders, joined in the PMC. The establishment of project-oriented consortia is an innovative and non-adversarial approach to massive international construction projects. Such projects have used various tools effectively and skillfully. This experience may offer an opportunity to practice new and advanced program management delivery methods, and it is expected that Korea will gain a competitive advantage in the international construction market.

  • PDF

Incidence rates of injury, musculoskeletal, skin, pulmonary and chronic diseases among construction workers by classification of occupations in South Korea: a 1,027 subject-based cohort of the Korean Construction Worker's Cohort (KCWC)

  • Seungho Lee;Yoon-Ji Kim;Youngki Kim;Dongmug Kang;Seung Chan Kim;Se-Yeong Kim
    • Annals of Occupational and Environmental Medicine
    • /
    • 제35권
    • /
    • pp.26.1-26.15
    • /
    • 2023
  • Background: The objective of this study is to investigate the differences in incidence rates of targeted diseases by classification of occupations among construction workers in Korea. Methods: In a subject-based cohort of the Korean Construction Worker's Cohort, we surveyed a total of 1,027 construction workers. As occupational exposure, the classification of occupations was developed using two axes: construction business and job type. To analyze disease incidence, we linked survey data with National Health Insurance Service data. Eleven target disease categories with high prevalence or estimated work-relatedness among construction workers were evaluated in our study. The average incidence rates were calculated as cases per 1,000 person-years (PY). Results: Injury, poisoning, and certain other consequences of external causes had the highest incidence rate of 344.08 per 1,000 PY, followed by disease of the musculoskeletal system and connective tissue for 208.64 and diseases of the skin and subcutaneous tissue for 197.87 in our cohort. We especially found that chronic obstructive pulmonary disease was more common in construction painters, civil engineering welders, and civil engineering frame mold carpenters, asthma in construction painters, landscape, and construction water proofers, interstitial lung diseases in construction water proofers. Conclusions: This is the first study to systematically classify complex construction occupations in order to analyze occupational diseases in Korean construction workers. There were differences in disease incidences among construction workers based on the classification of occupations. It is necessary to develop customized occupational safety and health policies for high-risk occupations for each disease in the construction industry.