• Title/Summary/Keyword: Construction of complex

Search Result 1,916, Processing Time 0.035 seconds

The Improvement of Delivery System for International Sports Complex Facility (국제종합경기 시설공사 발주방법의 개선 방안)

  • Choi Yong-Ho;Lee Soo-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.107-112
    • /
    • 2005
  • Renovation of existing sports facilities or construction of temporary ones for international complex games requires a wide variety of hundreds of sub construction projects to be awarded at the same time but there are few precedents required regarding the study of tendering process required in such cases. As award of construction contracts to build sports facilities for various international complex games is a critical determinant of fate of international complex games in the initial phase, it is very critical that adequate construction tendering process bedetermined. This research is aimed to study tendering cases for renovation or construction of critical international sports facilities to enhance efficiency of facility construction and define most reasonable tendering approach to satisfy schedule constraints often associated with international complex games and contribute to improvement of international competitiveness of their host cities and propose a direction for further development. This study also provides inputs to subsequent sports events of comparable scale to minimize trial and error.

  • PDF

Effects of an Apartment Complex on Flow and Dispersion in an Urban Area (도시 지역에서 아파트 단지가 흐름과 확산에 미치는 영향)

  • Lee, Young-Su;Kim, Jae-Jin
    • Atmosphere
    • /
    • v.21 no.1
    • /
    • pp.95-108
    • /
    • 2011
  • The effects of an apartment complex on flow and pollutant dispersion in an urban area are numerically investigated using a computational fluid dynamics (CFD) model. The CFD model is based on the Reynolds-averaged Navier-Stokes equations and includes the renormalization group k-${\varepsilon}$ turbulence model. The geographic information system (GIS) data is used as an input data of the CFD model. Eight numerical simulations are carried out for different inflow directions and, for each inflow direction, the effects of an apartment complex are investigated, comparing the characteristics of flow and dispersion before and after construction of the apartment complex in detail. The observation data of automatic weather system (AWS) is analyzed. The windrose analysis shows that the wind speed and direction after the construction of the complex are quite different from those before the construction. The construction of the apartment complex resulted in the decrease in wind speed at the downwind region. It is also shown that the wind speed increased partially inside the apartment complex due to the channeling effect to satisfy the mass continuity. On the whole, the wind speed decreased at the downwind region due to the drag effect by the apartment complex. As a result, the passive pollutant concentration increased (decreased) near the downwind region of (within) the apartment complex compared with that before the construction.

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

A Study on Rail Transport Method by the Construction Plan of Samcheok Electric Power Complex (삼척발전단지 건설계획에 따른 철도수송력 강화 방안 연구)

  • Cho, Chi-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1327-1334
    • /
    • 2009
  • According to the construction plan of Samcheok electric power complex from year 2009 to year 2020, many people are interested in this area. This national project which invests about 8.6 trillion won will have great influence to rail transport considering current depression days. Samcheok electric power complex will be the largest plan in Korea, and it is necessary to have railroad construction plan as soon as possible considering the route change of domestic coal transport and the possibility of coal transport by rail from North Korea, Russia and China after reunification of Korean peninsula. Also, Samcheok electric power complex will be located in the east area railroad route and it is important to study about this area. This study will mention about the railroad route of east sea north line and Pohang $\sim$ Samcheok line, and review the prospect and strengthening method of coal transport by railroad according to the construction of Samcheok electric power complex.

  • PDF

An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project (입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향)

  • Ko, Dae-Jun;Choi, Eun-A;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF

Analysis on Accuracy and Indigenity of Landscape Plants Species in Planting Design and Construction (식재설계 및 시공시 조경수종 사용에 있어서의 정확성과 자생성 분석)

    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.251-258
    • /
    • 1998
  • The purposes of this study was to investigate accuracy and indigenity of landscape plant species in planting design and construction at housing complex and offer basic data for improving precision of planting construction. The scientific name of landscape plant species was described in planting drawings at only two sites among twelve survey sites. According to analysis on indigenity of plant species in planting drawings, it was found that the component ratio of foreign species was the highest and the component ratio of native species at public housing complex was the lowest. The component ratio of landscape plant species in planting construction was severely differed to that of planting drawings. Also the component ratio of cultivar was higher than that of planting drawings due to planting of sevveral cultivars for one species in planting drawings. In the result of accuracy analysis on landscape plant species in planting construction, it was found that mean ratio of inacccurate species was 33.2% at public housing complex, 29.6% at local company housing complex and 26.4% at nationwide company housing complex. It was found that several cultivars were planted for one species in planting drawings. The representative species which were planted by several cultivars were Camellia japonica, Rododendron spp., Prunus spp. and Magnolia spp. and so on. In order to promote the precision and speciality of planting design and construction, scientific and cultivar name of plants should be described in planting drawings.

  • PDF

An Investigative Study on the Structural Characteristics of High-Rise Complexes in Korea (국내 고층 주상복합 건물의 구조적 특성에 관한 조사 연구)

  • Kang Suk-Won;Lee Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.137-144
    • /
    • 2003
  • Recently, the interest in a complex building increases rapidly in Korea. High-rise complex is not simply the combination of a residential apartment and a business office as previous but a building with the object of the convenience of the residents familiar with city-life style through adapting the high class life style and new residential culture to the business space, and the efficiency in using the limited building site in the town. This study presents an exploratory analysis focusing the structural system with the help of the extensive survey of the construction site in Korea, and aims a guideline for the structural design and construction of high rise complex. Through the survey, change and development in the design and the construction can be seen as the height and size of the complex grow. It is almost indispensable to design a structural system against lateral forces like earthquake or wind, which is usually measured by story drift ratio or story displacement. Improvement of the structural materials and their usages is also included for the efficiency of the structural system. Useful slab-beam system contributing to the decrease of the story height is still a concern.

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.4
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.