• 제목/요약/키워드: Construction of airport

검색결과 198건 처리시간 0.021초

공항포장용 순환골재의 처리방법별 경제성 분석 (Cost Analysis of Recycled Aggregate Production on Airport Pavement)

  • 강승민;이활웅;양성철
    • 한국도로학회논문집
    • /
    • 제16권5호
    • /
    • pp.39-47
    • /
    • 2014
  • PURPOSES : This study aimed to analyze economic effect of recycled aggregate production on job-site airport pavement. METHODS : The validation of site recycling for waste concrete as economic efficiency is analyzed through the case study of site recycling at an O airport pavement construction. The break-even point for the cost of site recycling was estimated according to two different waste concrete processing methods such as job-site recycling and processing on commission (or plant). RESULTS : Job-site recycling cost decreases as the use rate of job-site recycled concrete aggregate increases, or the amount of concrete waste increases, but transporting distance decreases. It was shown in an O airport case that as the use rate of job-site recycled concrete aggregate exceeds 61.4 %, the job-site recycling cost is cheaper than the processing cost on commission. CONCLUSIONS : The results of this study can utilize basic data of feasibility for site recycling of waste concrete on airport pavement construction.

줄눈형식에 따른 공항 콘크리트 포장 하중전달율 비교 (Comparison with Load Transfer Efficiency for Joint Types in Airport Concrete Pavements)

  • 안지환;전성일;권수안;김민우
    • 한국도로학회논문집
    • /
    • 제16권3호
    • /
    • pp.9-20
    • /
    • 2014
  • PURPOSES : This study is to compare load transfer efficiency of key joint and dowel joint for airport concrete pavement. METHODS : As AC150/5320-6D of FAA's [Advisory Circular] was changed into AC150/5320-6E, Key joint type of rigid pavement were excluded from Construction Joints. LTE(Load Transfer Efficiency) of dowel joint and key joint were compared by times and seasons through pavement temperature measurement, ocular investigation and HWD measurement. RESULTS : For the joint performance grade of No. 2(The second) runway of airport, 12% of poor rate was observed in key joint and 2% of poor rate in dowel joint. Poor rate of key joint was increased to 17%, if only No. 3~No. 6 slabs, which are mostly loaded from the airplanes, were applied for the study. In apron area, LTE poor rate of key joint was high in winter, and LTE poor rate of dowel joint was at least above 'Fair' grade. In summer, 'Fair' for key joint, 'Acceptable' for dowel joint appeared. CONCLUSIONS : As results, dowel joint was superior than key joint for LTE. Deviations of seasons and times were smaller in dowel joint's result. And LTE in winter was lower than LTE in summer.

인천국제공항 접근교통시설의 현황분석 및 개선방안에 관한 연구 (A Research on Analyzing Current Status and Ways to Improve Access Transportation to Incheon International Airport)

  • 서양환;김경숙;한순욱;윤성현
    • 한국항공운항학회지
    • /
    • 제20권4호
    • /
    • pp.106-114
    • /
    • 2012
  • As Incheon International Airport(IIA) is located in an island 50-km away from Seoul, various travel equipments for access are required. So far two connecting bridges are constructed funded by civilian funds. For the further bridge construction, the reduction of forecast traffic amount and the government subsidy for the civilian funds are big issues. Comparing the access traffics of IIA to those other competing airports, traffic conditions inside the airport are superior to other competing airports from the management point of view, as utilization conditions and equipment capacities are periodically monitored and evaluated to set up comprehensive countermeasures following constructing by stages. However, while the accessability to IIA is very important, as IIA is built on an island the conflicts between near-by developers and traffic facility operators make further bridge construction difficult. As improving the accessibility to an airport is not easy to achieve only by the IIA management's efforts, the central government level authorities should organize a committee with agencies concerned and analyze the characteristics of access traffic periodically to suggest reform measures for each organization concerned to implement appropriate undertakings at apt timing. For the future, central government's level empirical research on the airport accessibility for synthetic and systematic plan set-up is expected.

인천국제공항철도의 다목적 활용방안 - 연계체계 개선을 중심으로 (A study on the Multipurpose Usage of Incheon International Airport Railway - Focusing on the Improvement of Connecting Systems -)

  • 박정수;원제무;한우진
    • 한국철도학회논문집
    • /
    • 제8권6호
    • /
    • pp.610-616
    • /
    • 2005
  • The Incheon International Airport Express(I'Rex) is the railroad that connects Incheon International Airport, Gimpo Airport and Seoul Station. I'Rex is now under construction, and it will be connected to Gimpo Airport by 2007, to Seoul Station by 2010. However, there has been no discussion on how th connect different routes of railway Systems. Therefore it seems likely that rail passenger demand will be lower than that of limousine bus. Therefor, this paper proposes 4 effective connecting methods for I'Rex - (1) Shuttle transport, (2) Short-distance connecting transport (Inside I'Rex, Seoul Subway Line 9, 'Han-River line') (3) Mid-distance connecting transport (Jung-ang, Tae-baek, Young-dong line) (4) Long-distance connecting transport (Korean Train Express (Korean high speed railroad)) These methods can increase the connectivity of I'Rex with existing railroads and the competition power of I'Rex against a highway.

인천국제공항건설 사업관리 경험 (Introduction to CM Experience from Incheon International Airport (IIA) Construction Project)

  • 박대원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.20-25
    • /
    • 2004
  • 2003년 7월 18일 인칠공항공사는 동북아의 중추공항(Hub-Airport)건설을 목표로 단계적으로 추진되는 인천국제공항 2단계건석사업에 필요한 전문적인 사업관리 기술을 지원 받기 위하여 KIDS 컨소시엄(건원, ITM, 도화, 공간으로 구성된 컨소시엄)과 2단계 건설사업관리 기술지원용역계약을 체결하였다. 2단계 건설사업은 250만 평의 부지조성, 제3활주로, 계류장,원격탑승동, 무인자동열차, 고속수하물처리시설, 화물터미널. 등과 필요한 시설물을 2008년 말까지 완료하는 것으로 계획되어 있으며 CM계약자는 기 구축된 공항공사의 각종 사업관리 Tool을 이용하여 공정관리를 포함한 종합사업관리, 건축/전럭시설의 설계감리. IAT/BHS 등의 설계관리. 품질 및 시운전관리 등의 업무에 국내외 전문인력을 공항공사의 사업관리 조직에 투입하여 공사직원들과 함께 사업목표 달성을 위해 매진하고 있다. 본 고에서는 인천공항공사에서 수행하고 있는 건설사업관리사례를 주요업무 중심으로 소개해 보고자 한다.

  • PDF

한중 전략노선 운수권 교환가치 분석: 인천국제공항을 중심으로 (Analysis on the Exchange Value of Traffic Rights between Korea and China Strategic Route: Focusing On Incheon International Airport)

  • 최유진;박정희
    • 무역학회지
    • /
    • 제44권1호
    • /
    • pp.159-175
    • /
    • 2019
  • In China, the government has aggressively led the construction and expansion of airports across China. Upon this opportunity, "Korea-China" network is expected to expand. Therefore this study tried to deduce implications for Incheon International Airport by expansion of "Korea-China" traffic rights. As a result of analyzing the exchange values of traffic rights on the "Incheon~Beijing/Chengdu" routes, it was found that there is a concern that Chinese airlines could make inroads into Korean airline's market. In both routes, Korean airline's market share and passenger demand increased while the sales decreased after expanding traffic rights. On the other hand, Chinese airlines showed an increase in sales and a larger passenger growth than Korean airlines. Therefore it is necessary for the government to expand the traffic rights through detailed route value analysis.

신공항(新空港)의 허브공항화(空港化)에 관한 소고(小考) (An Essay on the Possibility of New Seoul International Airport as a Regional Hub)

  • 김종석
    • 항공우주정책ㆍ법학회지
    • /
    • 제5권
    • /
    • pp.303-320
    • /
    • 1993
  • The construction of New Seoul International Airport is under way despite much controversy. Among much discussed, but not well-formulated controversy is the possibility of the airport as a hub in the North Asia Region. This paper specifies the factors which render it possible for an airport to be a regional hub. Then each factor is applied to the new airport to see whether it can function as a hub airport. Also examined is the qualitative cost and benefit calculation related to the hub function. The usual discussion has missed one big point of cost side of hub function in the belief that the hub only produces benefits to the national economy where the airline and airport industry belong; earlier-than-expected congestion and the necessity to expand the airport sufficiently enough to accommodate the increasing air demand. An airport as a hub is determined by several factors; geographical location ; economic status of the country where the airport belongs ; bilateral air service agreements according to which the airlines can exercise the route rights; the airport charges which directly influence the cost structure of the carriers ; international aviation and airport related policies of each country in the region ; airport capacity etc. The tentative implications of this paper are the followings; first, the new airport is able to function as a regional hub in the transpacific routes which connect Asian countries and North America. That is, directional hubbing by the airlines is implicated; second, the main benefits may be accrued to american airlines exercising all the route rights in the Asian region; third, the governmental effort to make the new airport a regional hub must take caution in optimizing the hubbing level (% of transitting passengers and freight) between the benefits and the costs. Further Studies may include optimal level of hubbing for the new airport and, quantification of the impact of the new airport on the national economy depending on the degree of hubbing.

  • PDF

울릉공항 결항률 증가조건에 따른 개선방안 연구 (A Study on Improvement Measures for Increasing Cancellation Rates at Ulleung Airport)

  • 이명식;김성엽;이준호
    • 한국항공운항학회지
    • /
    • 제32권2호
    • /
    • pp.142-150
    • /
    • 2024
  • Improving transportation accessibility on islands is closely related to regional development. Currently, the government is constructing Ulleung Airport as part of the 6th Airport Mid- to Long-term Development Plan. Similar to the case of Jeju Airport in 2016, severe congestion occurs at passenger terminals upon flight resumption after cancellations at airports on islands. Therefore, considering the cancellation rate at island airports is important. This study investigates the conditions leading to increased cancellation rates at Ulleung Airport, with the research results predicting frequent cancellations during the winter season. The research methodology involved examining airport construction plans, aircraft performance, airport de-icing capabilities, and also included consideration of weather conditions. Ulleung Island is a representative snowfall area, and sufficient snow removal capacity must be secured. However, the current plan's snow removal capacity is insufficient, leading to anticipated high cancellation rates. Therefore, measures to mitigate passenger inconvenience caused by increased cancellations and methods to reduce the cancellation rate are explored. With Ulleung Airport scheduled to open in 2027, there is ample time to implement supplementary measures to reduce the cancellation rate and minimize passenger inconvenience.

Productivity Analysis of Spray Task in an International Airport

  • Kisi, Krishna P.;Kayastha, Rujan
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.632-639
    • /
    • 2022
  • The objective of this study is to analyze the productivity, efficiency, and factors affecting the productivity of a spray task from an international airport project. The study is focused on the productivity analysis of the Subcontractor whose job was to supply and apply sprayed-applied fire-resistive material (SFRM) on steel members to achieve the necessary fire ratings on the building structures of the Hamad International Airport, Qatar. The study analyzed the productivity of the four sprayer teams who completed the task at three locations and three areas of the airport. The study found that the productivity of the individual team observed during the SFRM spray task was not only different but was also observed different when they worked at varying floor heights where different factors affecting productivity were predominant. The study found that the efficiency was lowest (47.32%) when the spray team had to work at second-floor heights and factors affecting productivity such as limited accessibility for material movement and lifting, site congestion, lack of continuity of operation due to priority areas and frequent re-handling of machines and tools were present. Besides, the factors such as adverse weather conditions and sub-trades interference affected productivity at all locations. The findings show that productivity depends on multiple factors and those factors need to be identified and addressed to improve productivity. The findings also show that the estimated efficiency was hard to achieve but possible since Team 4 had 97% efficiency on the first floor of the airport.

  • PDF