• Title/Summary/Keyword: Construction level

Search Result 4,343, Processing Time 0.029 seconds

A Basic Study on the Correlation Analysis between Safety Perception Level of Domestic Construction Companies and Construction Productivity (국내 건설기업의 안전인식수준과 건설생산성간의 상관관계 분석 기초연구)

  • Jeon, Sang-Sub;Oh, Jun-Seok;Son, Seung-Hyun;Son, Ki-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.47-48
    • /
    • 2019
  • Currently, the government has made a lot of efforts to improve construction productivity but there are few studies which measure between safety perception level and productivity in the South Korean construction industry. Therefore, the objective of this study is to analyze correlation between safety perception level of domestic construction companies and construction productivity. To achieve the objective, first, the concept of safety perception level was defined. Second, the safety perception level and construction productivity were investigated in the case projects. Third, correlation analysis was conducted between safety perception level and productivity. As a result, it was concluded that a high level of safety perception of executive and manager would increase construction productivity. In addition, To improve the safety perception level in the construction company, it is suggested that the provision safety resources for managements and the equal communication system between workers and managements and the development safety education tools considering the worker's experience. In the future, these findings can be utilized to develop future evaluation tools for a safety perception level in domestic construction company.

  • PDF

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

INCORPORATING CONTEXT LEVEL VARIABLES TO IMPROVE OPERATION ANALYSIS IN STEEL FABRICATION SHOPS

  • Amin Alvanchi;SangHyun Lee;Simaan M. AbouRizk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1053-1059
    • /
    • 2009
  • Construction system modeling can enhance work performance by following the behaviors of a system. System behaviors may originate from physical aspects of a system, namely operation level variables, or from non-physical aspects of a system known as context level variables. However, construction system modelers usually focus on only one type of system variable (i.e., operation level or context level) which can lead to less accurate results. Hybrid modeling with System Dynamics (SD) and Discrete Event Simulation (DES) is one of the approaches that has been utilized to address this issue. In this research, an SD-DES hybrid model of a steel fabrication shop is developed, and the benefits of capturing context level variables together with operation level variables in the model are discussed.

  • PDF

Analysis of Informatization Level for Construction CALS (건설CALS의 정보화수준 조사 분석)

  • Jung, In-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.285-290
    • /
    • 2008
  • Ministry of Land, Transportation and Marine Affairs has implemented Construction CALS project for improving informatization level of construction industry and for making construction production system efficient. Construction CALS project has been implemented since 1998, however, there has been no attempt to measure how high the informatization level of Construction CALS is. This study measured the informatization level of Construction CALS by using the evaluation index proposed in the former studies. For measuring the level, this study made questions and selected samples, did survey, and analyzed the survey results. According to the results, Construction CALS is excellent for the fast rehabilitation of system errors, the web-base environment of system, the application of standard classification system, and the development of information strategic plan. This study will contribute to find out the informatization level of Construction CALS precisely.

  • PDF

An Analysis on the Safety Management Level of Domestic Medium Construction Companies and Its Improvement Measures (국내 중견 건설회사의 안전관리수준 분석 및 향상방안)

  • Jeong, Hyunyong;Shin, Wonsang;Son, Changbaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.20-30
    • /
    • 2023
  • This study was conducted to analyze the degree and characteristics of the improvement of the safety management level of mid-sized construction companies by identifying the current safety management level for domestic mid-sized construction companies and comparing it with the past safety management level. As a result of the study, the current safety management level of domestic mid-sized construction companies by group has improved more than in the past, compared to group 2 and group 1. The current level of safety management is relatively good, with the first and second groups almost similar, and the level of safety management at the headquarters and the site is also similar. Each group of mid-sized construction companies in Korea analyzed measures to improve the safety management level, and proposed measures to improve the safety management level of mid-sized construction companies in Korea.

Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method (역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석)

  • Park, Yong-Hyeon;Ju, Young-Kyu
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

A Study for the Optimal Expression Level Definition of BIM Model in Construction Phase (시공단계 BIM모델의 적정표현수준 정의를 위한 기초 연구)

  • Noh, Hae-ra;Kim, Ji-yun;Lee, Da-un;Yun, Seok-heon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.4
    • /
    • pp.378-388
    • /
    • 2016
  • As the needs for the mega-sized, high-rise and irregular shape of building increase, domestic application of BIM in construction industry is increasing in recent years. In this circumstance, interests in BIM modeling and modeling detail level have been also increased. BIM that is based on a three-dimensions, requires a specific and precise building expressions. And model expression level required for each phase such as design, construction, and maintenance of the construction project could be different as its needs. Because that it is not clear to define the criteria for the expression level of construction BIM model, It is difficult to decide how detail and what to model is appropriate in the practical application of BIM model. It could be the reason why the productivity in construction project became lower and lower. In this study we consider the way how to improve the productivity of BIM and analyze the appropriate representation level of construction BIM model through the experts' survey. The results of study could suggest the basis for an appropriate expression level of construction BIM model.

Relationship between Stress Level and Reworks for Construction Professionals

  • Chae, Jeonghyeun;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.169-178
    • /
    • 2020
  • This paper presents a study investigating the relationship between stress level and reworks for construction professionals. As employees' work-life balance (WLB) becomes more important nowadays, controlling the level of stress in the workplace becomes more important as occupational stress has negative impacts on WLB. Reworks can be one severe occupational stressor as people suffer from stress when they need to redo their works. This study hypothesizes that there is a positive correlation between reworks and level of stress, meaning that people tend to show high level of stress when they need to redo their works. The hypothesis will be tested by checking the stress level when engineers redo their works because of changes or errors. An electroencephalography (EEG) sensor will be used to measure the stress level of engineers when they redo their works. For more accurate measure of stress, the stress level will also be measured by the galvanic skin response (GSR). This experiment is expected to prove that rework process is a severe stressor for construction professionals, which will contribute to lower productivity and poorer WLB. The finding will emphasize the importance of managing reworks in the construction industry, which will eventually help construction managers to control the level of employees' stress successfully.

  • PDF

Regression Analysis of an Excavator Sound Power Level (굴착기의 음향파워레벨 회귀분석)

  • Gu, Jin-Hoi;Lee, Jae-Won;Seo, Chung-Youl;Jang, Seong-Ki;Choi, Kyung-Hee;Han, Jin-Seok
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.3
    • /
    • pp.203-207
    • /
    • 2012
  • The noise emitted from an excavator has long been a cause of environmental disputes, while causing displeasure to the nearby residents. So, the ministry of environment adopted the construction machinery noise labeling system to encourage the construction machinery manufacturing companies to develop the low noise construction machinery voluntarily. But, as the quality of life improves, a growing number of people desire the comfortable and quite environment to live in. Under the situation, noise from the construction machinery has been a major cause for stress and complaints. When the noise dispute happened in the construction site, the sound pressure level of the construction machinery like a excavator was measured at the lot boundary of the noise victim's residence to judge how much noise damage occur. But the sound pressure level of the construction machinery is measured differently according to the acoustic environment of construction site and the measuring position, respectively, which makes it difficulty to judge whether the noise damage occur or not. As the sound power level of noise source is not affected by the acoustic environment of construction site and the measuring position, if we use the information of the sound power level, it will be easy to judge whether the noise damage occur and to establish the soundproofing measures. Therefore, we derive the sound power level regression model of the excavator to judge whether the noise emitted from the excavator damages to residents near the construction site. Also, the sound power level regression model of the excavator drawn in this paper will help construction companies to plan the noise reduction program in the construction sites.

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF