• Title/Summary/Keyword: Construction field data

Search Result 1,430, Processing Time 0.033 seconds

Emerging Technologies for Construction Data Collection

  • Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.181-186
    • /
    • 2006
  • Estimation based on current data of construction performances have become one of the critical subjects which many researchers have been interested in for the past decades. In order to accomplish accurate measurement and estimation of construction performances, the method of data collection stands the highest priority. However, there are many difficulties in data collection from construction jobsite due to the characteristics of the construction industry. With developments of new technologies in other industries, several technologies has recently initiated to be applied to construction field. Electronic tags based on the identification technology, automatic volume measurement based on laser scanning technology, and Global Positioning System (GPS) have been represented the technologies which show the high opportunity for being used in construction. This study reviews specific aspects of these technologies focused on the utilization in construction jobsite. Also, the challenges which these technologies need to overcome are discussed.

  • PDF

Development of 3D Underground Information Construction and Visualization System Based on IUGIM (지하공간통합지도 기반 3차원 지하정보 구축 및 가시화시스템 개발)

  • Kang, Kyung Nam;Kim, Wooram;Hwang, Seung Hyun;An, Joon Sang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.497-505
    • /
    • 2021
  • Due to recent underground space accidents, are a frequent occurence in Korea, the government established the basic plan for the construction of the IUGIM (Integrated Underground Geospatial Information Map) in 2015 as a measure for safety management of underground spaces. The development of IUGIM was partially completed as of 2021. The underground space management entity and related organizations are utilizing it. This study is being carried out as part of a plan to improve the usability of IUGIM, and to build a visualization system that compares real-time field data with stored data. A system, equipped with a visualization function for borehole data and 6 types of underground facilities built and managed on IUGIM; a tool capable of comparative analysis with real-time data measured in the field, is being built. The 6 types of underground facilities are water supply pipe, sewage pipe, power pipe, gas pipe, communication pipe, and heating pipe. The completed system was demonstrated at three locations in Seocho-gu, Gangnam-gu in Seoul. The field demonstration was carried out by accessing the mobile center and downloading IUGIM data, visualizing IUGIM data (surface creation, borehole information, underground facilities), and visualizing the GPR(Ground Penetrating Radar)-based data acquired at the field. As a result of the empirical results of IUGIM data and GPR-based field data, it was judged to be suitable. As a result of this study, it is judged that it can be helpful for safe construction at the excavation site.

Example of Application of Drone Mapping System based on LiDAR to Highway Construction Site (드론 LiDAR에 기반한 매핑 시스템의 고속도로 건설 현장 적용 사례)

  • Seung-Min Shin;Oh-Soung Kwon;Chang-Woo Ban
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_3
    • /
    • pp.1325-1332
    • /
    • 2023
  • Recently, much research is being conducted based on point cloud data for the growth of innovations such as construction automation in the transportation field and virtual national space. This data is often measured through remote control in terrain that is difficult for humans to access using devices such as UAVs and UGVs. Drones, one of the UAVs, are mainly used to acquire point cloud data, but photogrammetry using a vision camera, which takes a lot of time to create a point cloud map, is difficult to apply in construction sites where the terrain changes periodically and surveying is difficult. In this paper, we developed a point cloud mapping system by adopting non-repetitive scanning LiDAR and attempted to confirm improvements through field application. For accuracy analysis, a point cloud map was created through a 2 minute 40 second flight and about 30 seconds of software post-processing on a terrain measuring 144.5 × 138.8 m. As a result of comparing the actual measured distance for structures with an average of 4 m, an average error of 4.3 cm was recorded, confirming that the performance was within the error range applicable to the field.

A Study on the Environmental Improvement in the Interior Construction Fields with the check-list (실내건축의 작업환경 개선을 위한 기본적 관리방안에 관한 연구)

  • 이용의
    • Korean Institute of Interior Design Journal
    • /
    • no.9
    • /
    • pp.10-17
    • /
    • 1996
  • With the ever-increasing important of high-speed information in society as we move towards the 21 st century. Interior design and it's working condition has been changed a great deal included a sort of each special character and make a difference against the others. It used to be find a great poles asunder of worker's safety and project quality according to the environmental dimension of interior construction field as if they should be a pleasantness or poor condition. This research aimed to improvement of environmental construction field of interior with construction engineers and particular interior labors in 4 phases as : ⅠThe preparatory phase : -Secure a Budget, Environmental safety supervisor -Fix of Design quality, Construction period. -Choice of Construction method, Sub constructing Ⅱ. Starting work phase ; -Capacity , Safety of temporary power line. -Carriage, Stock of Material -Safety of Electronic tools, -Personal protector. Ⅲ. Working period ; -Ventilation, I illumination of working place. -Measurement of environmental working condition Ⅳ.Finish working phase ; -Analysis of measurement data. -Evaluation and making up for the weak point. -Keeping data.

  • PDF

A case study of digital twin construction based on geospatial building information modeling (GeoBIM) - Focusing on the case of Jaeamcheon-gul and Jeonggusu-gul in Jeju Island - (지하공간건설정보모델링(GeoBIM) 기반의 디지털 트윈 구축사례에 관한 연구 - 제주도 재암천굴, 정구수굴 사례를 중심으로 -)

  • Lee, Jong-Hyun;An, Joon-Sang;Choi, Jae-Woong;Baek, Yong
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.20-30
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction is actively researched, in the domestic construction field, and one of the key elements in this field is Building Information Modeling(BIM). In Korea, smart construction is being implemented through BIM-based digitization and intelligence. The geotechnical engineering field should also prepare for the introduction of BIM. In this study, the concept and application status of GeoBIM were identified, and the direction of future research was presented. This study is a part of the study "Establishment of GeoBIM-based Digital Twin Maintenance System" in the current "Technology Development for Establishment of Jeju Ground Collapse Response System for Safe Road Operation". The subject and scope of the study is continuous excavation at caves located under roads in Jeju Island, and initial research is being conducted on Jaeamcheon-gul and Jeonggusu-gul. This study aims to build a digital twin through individual data construction and integration processes such as cave shape modeling using laser scanners, 3D stratum modeling using borehole information and geophysical exploration data, and modeling of surrounding conditions using drones.

A Study on the Comparison of Building Data Using 3D Scanning (3D 스캐닝 활용 건축물 데이터 비교에 관한 연구)

  • Hwang, Byeong Yeon;Park, Jong Ki;Lee, Tae Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.50-56
    • /
    • 2021
  • This study examines 3D scanning and how it is used in the construction field. 3D scanning technology was applied to a real space and compared with drawings in the planning and construction stages. 3D scanning technology has been widely applied in the field of construction, design, construction, and safety. The results of comparing 3D scanning data with drawings are as follows. First, the external shape and dimensions do not show much difference. Second, the internal shape and dimensions are different. Third, indoor lighting layouts are different in all buildings. 3D scanning should be an essential element in the construction stage before completion and should be used for supervision tasks such as material management, improving the efficiency of construction, and safety management through continuous 3D scanning using automation and robots. Follow-up studies in the field of architecture, such as BIM and process management, will be needed.

A Calculation Model of Site Management Manpower for Apartment Building Construction Project (공동주택의 현장관리 인력 산출모형 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Won, Il-Woo;Joo, Jin-Kyu;Lee, Goon-Jae
    • KIEAE Journal
    • /
    • v.11 no.4
    • /
    • pp.47-54
    • /
    • 2011
  • Construction companies find it increasingly necessary to reduce the cost as the construction market has been suffering from a depression and the industrial environment has been changing fast lately. The cost cut demands the productivity management of the field operations, which can be made feasible by assigning an appropriate number of managers on the construction site. However, previous studies are focused on the labor productivity and construction companies take into account only the revenue per worker in organizing the staff. The purpose of this study is to research the model for calculating the field management manpower in accordance with the characteristic of project and site conditions which are usually considered in the beginning of the construction project. The data about apartment building projects of domestic large constructors and factors related to them were statistically analyzed. The results of this study can be used to calculate the necessary field management manpower in accordance with the characteristic of project.

A review of corpus research trends in Korean education (한국어 교육 관련 국내 코퍼스 연구 동향)

  • Shim, Eunji
    • Asia Pacific Journal of Corpus Research
    • /
    • v.2 no.2
    • /
    • pp.43-48
    • /
    • 2021
  • The aim of this study is to analyze the trends of corpus driven research in Korean education. For this purpose, a total of 14 papers was searched online with the keywords including Korean corpus and Korean education. The data was categorized into three: vocabulary education, grammar education and corpus data construction methods. The analysis results suggest that the number of corpus studies in the field of Korean education is not large enough but continues to increase, especially in the research on data construction tools. This suggests there is a significant demand in corpus driven studies in Korean education field.

A Study on Construction Drawing Data Exchange Model for Information Interoperability Based on International Standards (국제표준기반의 건설도면정보 교환 모델에 관한 연구)

  • Kim, I.H.;Kim, G.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.6 no.3
    • /
    • pp.147-156
    • /
    • 2001
  • In the construction industry, construction process includes a variety of design stages with cooperation and regulation by many related disciplines. In addition, the construction market is growing and becoming more complex. With this characteristic, design information has become more and more complicated and difficult to manage by the simple and traditional data management methodology. In the practical field, although CAD has been widely available for the last ten years, related disciplines have not shared digital information efficiently. This paper suggests a construction CAD data exchange model that has been developed through investigation and analysis of Korean construction CAD practices and foreign CAD standards. Moreover, this paper investigates a CAD data exchange model using STEP to improve information availability and overcome the limit of CAD systems.

  • PDF

A Study on the Actual Condition and Effect of Dust Scattering in Construction Field (건설현장에서 발생하는 비산먼지의 실태 및 영향에 관한 연구)

  • Yu, Hee-Jong;Han, Kyeong-Yeon;Kwak, Kwang-Soo;Kim, Jae-Soo;Yang, Keek-Yeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.109-115
    • /
    • 2004
  • Dust scattering is one of the major problem for the residents living nearby construction field with construction noise and vibration. The dust scattering may inflict a considerable damage to psychological, spiritual discomfort to neighboring peoples. Therefore, the trouble of residents living nearby construction field have been increasing. Nevertheless, in our country, adequate guidelines for the dust scattering are not yet established because of the lack of basic data and insufficient research works. In this point, this study has researched its level of damage by conducting of the interview-survey which utilizing of questionnaire-paper asking for those staffs and workers to answer in the construction field, in order to grasp the damage extent of the actual condition effect and response against scattering dust in construction field. As the result, the occurring rate of dust scattering was appeared high compare with other constructing processes, due to utilization of construction equipment that operating at the fundamental basic construction stage, and it was turned out that presently the proper countermeasure and training against scattering dust in the construction site is insufficient. As for the solution mean against that, it is considered that with the better operation of construction site such as the installation of facilities for occurrence-restraint of dust scattering, frequent sprinkling of water, use of thermostat-covers, as well as those methods to be minimized of the occurrence of dust scattering must be contrived through the education for an attention how to use of construction equipment and training at the site.