• Title/Summary/Keyword: Construction factory

Search Result 376, Processing Time 0.03 seconds

Experimental Study on the Development of Void Precast Concrete Slab using Rubber Tube Mold for Inner Core (고무튜브 몰드 프리캐스트 콘크리트 유공 슬래브 개발에 관한 실험적 연구)

  • Bae, Kyu-Woong;Hong, Sung-Yub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.293-303
    • /
    • 2021
  • The void PC slab has a structurally reasonable cross-section by forming the hollow section of the neutral axis that is unnecessary for bending behavior. Domestic PC factories have introduced automation equipment to produce hollow PC slabs, and are achieving hollow sections through inserts. However, since the excessive initial investment cost of the PC factory is the main factor in the increase in production cost, other alternatives are needed. Therefore, in this study, when producing hollow PC slab members, by using a rubber tube as a formwork to form an internal hollow space, it is intended to contribute to securing productivity through molding various hollow shapes, making it larger, lightweight, and enabling rapid production. To implement a hollow PC slab using a rubber tube mold, the shape of a hollow cross-section in which the tube is combined was implemented by considering the shape of the rubber tube first. In addition, to secure the concrete quality of the hollow part, the finish properties of the rubber tube mold and concrete were evaluated, and the hollow PC production process was established.

Analytical Study on I-beam of I-beam Grated Concrete slab (I 형강 격자 상판의 주부재 I형강에 대한 해석적 연구)

  • 박창규;김용곤;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.437-442
    • /
    • 2001
  • Recently, there have been increased much concerns about repair and rehabilitation works for aged concrete structures. In particular, it is known that due to repeated overburden vehicle there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion during the repair and rehabilitation works of aged concrete slab, and can also sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, will be manufactured in accordance with the specification in the factory. and will be preassembled into the Panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam with punch holes itself through static and fatigue test with rational numerical analysis Finally this research is to suggest reformed I-beam through the numerical analysis.

  • PDF

AN EXPERIMENTAL STUDY ON THE PRODUCTION OF HIGH-STRENGTH CONCRETE PILE IN SITE (현장생산용 고강도 콘크리트 파일에 관한 실험적 연구)

  • 박칠림;권영호;백명종;이상수;정도순
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.183-188
    • /
    • 1995
  • Up to date, high-strength concrete pile which is producing in factory sells in the market. But according to the site and the construction conditions, the system to produce high-strength concrete pile directly in site is utilized in advanced country. Such the production system is the technique phenomenon very disirable in the side of quality control in site and the construction schedule, the time and the cost saving. This study is a fundamental experiment including concrete mixing design, non-autoclave curing method and the optimum condition to produce high-strengh concrete pile in site. As results of this study, High-strength concrete pile in site which target strength is 400kg/ $\textrm{cm}^2$ is able to produce it with optimum curing ciondition(75$^{\circ}C$, 9hr)and mixing design.

  • PDF

Experimental Comparison for Static Performance of I-beam Concrete Slab (I-형강 합성바닥판의 정적 성능비교)

  • 박길용;박창규;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.947-952
    • /
    • 2002
  • Recently, there have been increased much concerns about repair and rehabilitation works for aged concrete structures. In particular, it is known that due to repeated overburden vehicle there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion during the repair and rehabilitation works of aged concrete slab, and can also sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, will be manufactured in accordance with the specification in the factory, and will be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam concrete slab through static test.

  • PDF

Grand M Hotel interior renovation (포항 Grand M Hotel, 리노베이션 계획안)

  • Kim, Hye-Ja
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.97-98
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997 Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

Fundamental Properties of High Quality Concrete Using Grading of Coarse Aggregate by region (권역별 골재 입도보정 사용에 따른 고품질 콘크리트의 기초적 특성)

  • Kim, Dae-Geon;Choi, Sang-Hwan;Moon, Gyeong-Sik;Jo, Man-Ki;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.138-139
    • /
    • 2014
  • In this study, conventional aggregate obtained from a ready mixed concrete factory and the aggregate with a modified grading produced in lab. condition were prepared. Results showed that a good grading of aggregate the ratio of 5~13 mm and 13~25 mm is 20~40 % produced in the lab. condition significantly improved the slump and the compressive strength of the concrete.

  • PDF

Floor Vibration Analysis of Economic Steel (ES) Beam Using Field Measured Acceleration Responses (진동특성을 고려한 ES-빔 공법의 사용성능 평가)

  • Woo, Jong-Yeol;Park, Soo-Yong;Kim, Min-Jin;Hong, Seong-Wook;Doh, Sun-Boong;Choi, Tae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.83-84
    • /
    • 2011
  • This study provides floor vibration analysis for a factory constructed by ES-beam using field measured acceleration data. The natural frequencies of the first two modes of floor are extracted from measured data. With this information, a system identification has been performed to produce a numerical model representing existing floor. The peak magnitudes of acceleration for one man walking heel drop load from experiment and numerical model are analyzed using ISO vibration criteria and AIJ vibration performance criteria. The results show that there is no problem in use of ES-beam.

  • PDF

An Experimental Study of Vertically Suspended Shear Reinforcement for Reinforced Concrete Flat Plate slab (철근콘크리트 무량판 슬래브의 수직걸림형 전단보강재에 관한 실험적 연구)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Doh, Sun-Boong;Kim, Sang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.173-174
    • /
    • 2012
  • This study is concerned with the VSTUD shear reinforcement that it can be installed easily in filed as product at the factory and seismic performance can be achieved. The method of study is as follows. first, we researched constructability and economy of existing method. Secondly, we made specimen and were examined structural performance tests in order to verify the performance of the shear reinforcement. As a result, developed SL shear reinforcement increased in shear strength and stiffness of reinforcement, structural safety is judged to be increased.

  • PDF

Study and Field application of Segmented PC sleeper for Turnout (분절형 PC 침목 분기기의 연구 및 실용화)

  • Hwang Kwang-Ha;Park June-Teak;Lee Joong-Su;Park Yong-Gul;Jung Woo-Jin
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.739-745
    • /
    • 2004
  • In reference to conventional line speed-up and improvement railway, accurate assembly of turnout affects traveling quality of turnout area and running safety. Because of heavy weight and a large volume of the long sleepers and car limit, transport and construction of the P.C(prestress concrete) sleeper turnout is the most difficult process. the prerequisite for trouble-free transport of the factory pre-assembled major turnout components is achieved through division of long sleepers. So, in this paper we investigate structural safety of segmented sleeper which is adopted for the first time to improve performance of turnout and, new construction method.

  • PDF

Quantifying Praitical Application for Specialized Course on Temporary Work Safety (가설공사 안전 전문과정 수료후 실무활용도 조사에 관한 연구)

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.1
    • /
    • pp.116-123
    • /
    • 1999
  • It is generally considered that only questionnares, collected at the time when each course close, have been evaluated & represented for all of the subjects. But all the result of each course can be actually evaluated using only the data taken from how to apply for at the construction site or at the factory, directly, for the period of at least one year, not just short months. This study is to evaluate and quantify the result and analyses using the data from questionnare concerning the level practically applied to each process at construction site. 1st for three(3) months, 2nd for six(6) months, 3rd for nine(9) months, finally 4th for twelve (12) months, one year These questionnares have been distributed for same people four(4) times to find out what to, how to be applied with each subject.

  • PDF