• Title/Summary/Keyword: Construction drawing data

Search Result 151, Processing Time 0.029 seconds

Measuring and Modeling Labor Productivity using Historical Data (이력 데이터를 사용한 노무생산성 모델링 및 측정)

  • Park, Young-Jun;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.141-142
    • /
    • 2012
  • Estimating the productivity of labor has relied on the experience and intuition of an estimator, or productivity data, such as standard in practical estimation. However, when new technologies and new construction methods employed in the construction industry, Dependence of a quantity surveyor's intuition is increased. This is because of the lack of a systematic methodology which models, estimates, and measures the labor productivity, Due to the historical productivity data is unavailable. Even thought project history data contains information that is important to predict the performance of a project, It can not provide valuable information to model, estimate, and measure the labor productivity. This is because 1) the absence of the productivity measurement system with consistency, 2) the difficulty of reusability of historical data collected. Therefor, this study suggests a methodology which build a productivity model by measuring the productivity of labor and collecting the historical data systematically. In addition, this methology is applied to develop a productivity model of shop-drawing and manufacturing process using descrete event simulation.

  • PDF

A Study on the Application of Land Information System for the Land Management (토지 관리를 위한 토지 정보시스템의 응용에 관한 연구)

  • Yang, In-Tae;Yun, Young-Fun;Byun, Moo-Ryong;Kim, Eung-Nam;Paek, Jong-Won
    • Journal of Industrial Technology
    • /
    • v.11
    • /
    • pp.73-84
    • /
    • 1991
  • This study is concerned with the effective of aspects of utility management and land management, the accuracy of data, the structure of cross reference file of data and the perpetual preservation of data management through a drawing of computer and database, when land and utility information of the application of Land Information System is made on the computer. It will be shown that the present system of land management is inadequate in various contexts and occure in difficult problems of use, as presented in this paper, computer alternatives to these difficulties is efficiently managed and conveniently used land utility management. The ultimate goal is provided the necessary information of various areas as the presented land management operation is builted a drawing of computer and database construction through the computer.

  • PDF

Development and Verification of Technical Criteria for a U-Bridge

  • Kim, Kyoon-Tai;Kim, Chang-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.145-153
    • /
    • 2010
  • With the recent acceleration in the adoption of IT in industries, converged Construction-IT has been drawing attention as a new market driver in the IT fusion industry. Despite the simultaneous implementation of U-Cities all over Korea in a manner suiting each city's own attributes, Technical Criteria to build an optimized IT-infrastructure have not yet been prepared. To solve this problem, a standard for U-City construction should be prepared. This research, therefore, draw sample contents in order to establish and verify the criteria for U-City construction. The findings are expected to be meaningful, in that they would serve as significant data for establishing the criteria for future U-City construction.

Case Study of Coordinate Measurement during Construction of Long-Span Irregular Curved Roof Layers (장경간 비정형 곡면 지붕층의 시공중 좌표 계측 사례 연구)

  • Shim, Hak-Bo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.14-15
    • /
    • 2019
  • In this paper, it was tried to prove the possibility and effect of coordinate measurement by using MEP layout equipment at the construction stage, and to propose a method to improve measurement accuracy during construction. For this study, the passenger terminal site, which is a long span structure, was selected and compared with three dimensional CAD drawings and construction measurement results using MEP layout equipment for the precise construction of long-span irregular curved roof layers. As a result, it was found that it is possible to construct three-dimensional curved roof layers using MEP layout equipment through measurement and analysis.

  • PDF

Prediction of Blank Thickness Variation in a Deep Drawing Process Using Deep Neural Network (심층 신경망 기반 딥 드로잉 공정 블랭크 두께 변화율 예측)

  • Park, K.T.;Park, J.W.;Kwak, M.J.;Kang, B.S.
    • Transactions of Materials Processing
    • /
    • v.29 no.2
    • /
    • pp.89-96
    • /
    • 2020
  • The finite element method has been widely applied in the sheet metal forming process. However, the finite element method is computationally expensive and time consuming. In order to tackle this problem, surrogate modeling methods have been proposed. An artificial neural network (ANN) is one such surrogate model and has been well studied over the past decades. However, when it comes to ANN with two or more layers, so called deep neural networks (DNN), there is distinct a lack of research. We chose to use DNNs our surrogate model to predict the behavior of sheet metal in the deep drawing process. Thickness variation is selected as an output of the DNN in order to evaluate workpiece feasibility. Input variables of the DNN are radius of die, die corner and blank holder force. Finite element analysis was conducted to obtain data for surrogate model construction and testing. Sampling points were determined by full factorial, latin hyper cube and monte carlo methods. We investigated the performance of the DNN according to its structure, number of nodes and number of layers, then it was compared with a radial basis function surrogate model using various sampling methods and numbers. The results show that our DNN could be used as an efficient surrogate model for the deep drawing process.

A study on the Analysis of Building Information Modeling Factors of Construction Firms Using an Analytic Hierarchy Process (계층분석법을 이용한 BIM(Building Information Modeling)이 건설사에 미치는 영향요인 분석에 관한 연구)

  • Shim, Jin Kyu;Yi, Hye In;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.123-130
    • /
    • 2010
  • A lot of construction companies in overseas markets of construction try to change 2D CAD to 3D CAD for improving business ability and change to Building Information Modeling(BIM) for integrating information produced from construction life cycle. In America, GSA(General Service Administration) requires a design drawing planed by BIM and in Singapore and Europe, the government encourages architectures to use this tool. Recently in the domestic market, many organizations related construction industry are aware of importance of 3D CAD integrated information, and try to use BIM. Therefore, this research would analyze how does BIM affect construction industry and derive influence factors and provide basic data for using BIM.

Check Method of Rebar Placing Status Using 3D Scanning Technology (3D 스캐닝을 활용한 철근배근 간격 확인)

  • Kim, Ju yong;Park, Ji Yoeng;Kim, Chae Won;Lee, Young Do;Kim, Gwang Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.253-254
    • /
    • 2021
  • In the field of construction, research on smart construction technology is being actively pursued as a measure to increase productivity and efficiency. The technology that links 3D scanning and BIM of smart construction technology is in the limelight as a technology for checking the state of buildings in the field of architecture. It is thought that these techniques will be of great help in solving problems when the amount of inspection targets is large, such as confirmation of the rebar arrangement intervals, and therefore a large number of human resources are required. Therefore, in this study, we would like to apply 3D scanning to rebar construction to confirm whether the rebar arrangement can be confirmed according to the design drawing. In the study, the wall rebar of the rebar placed at the actual construction site was directly scanned to extract data, and the rebar placing status was confirmed through type analysis. As a result of analyzing the reinforcing bar arrangement state based on the data obtained by 3D scanning, it was found that the technology can be utilized.

  • PDF

Study of the Data Exchange Format of GIS and CALS/EC System (GIS와 CALS/EC 시스템의 자료 교환 포맷 연구)

  • 이상길;정종철
    • Spatial Information Research
    • /
    • v.12 no.2
    • /
    • pp.151-163
    • /
    • 2004
  • This study aims to develop a standard protocol by which users can exchange data information efficiently between KOSDIC and GIS. The ultimate goal from this study is to propose a data exchange format using KOSIC. The background of this study is that GIS industry sector is vigorously developing linked to spatial information construction such as UIS, LIS, EIS, AM/FM through supporting by regional government institution. According to do, the format of data transformation becomes major issue. GIS data can easily transfer to CAD version but when CAD data convert to GIS format (DWG->DXF->SHP) cannot get high success rate due to errors and problems. In addition, CAD data feature is made from oriental structure which is made of point and line faeture so that GIS system is impossible to data transformation. In the reason, the biggest problem is discordance of symbolization in integration and standard of data format. By investigation the usability of this study, conclusion are drawn efficient alternative plan in data transformation. Though this wort we will be able to provide a better transformation of data conversion between CAD format and GIS format. Accordingly, it is of important to enrich the integrated construction information infrastructure, which accommodates ever-changing constructions environment.

  • PDF

Development of an Extension Model based on Three Dimensional Wireframe Model for KOSDIC Format in the Construction Field (건설 분야 도면정보 교환 표준을 위한 3차원 와이어프레임 기반의 확장 모델 개발에 관한 연구)

  • Kim I.H.;Seo J.C.;Won J.S.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.10 no.3
    • /
    • pp.179-187
    • /
    • 2005
  • The usage of mixed 2D and 3D CAD data of commercial CAD systems is required in the construction practice. Sometimes 3D wireframe model is required by end-users when 2D CAD data is delivered. However, current KOSDIC can not represent 3D CAD data, because it has been developed as a 2D drawing delivery standard. Therefore, this study is to provide exchange and sharing of mixed 2D and 3D CAD data that add 3D wireframe model in the KOSDIC. To achieve this purpose, the authors have investigated the 3D CAD entities of commercial CAD systems, and have analyzed STEP standards providing 3D wireframe model. The result, the authors have extracted 3D CAD common entities based wireframe model which shall be added in the KOSDIC. This study can be beneficial by using the developed data model for heterogeneous CAD systems, and by providing the representation of mixed 2D and 3D CAD data in construction practice such as GIS, piping system, and so forth.

Efficiency Improvement Plan for Output Management at the Design Phase in BIM-Based Projects (국내 BIM 기반 건설 프로젝트에서의 설계단계 성과물 작성 효율화 방안에 관한 연구)

  • Kim, Ki-Nam;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.261-264
    • /
    • 2010
  • As construction projects get bigger and more complex, communication and information flow among participants become key success factors of a project. Accordingly, construction projects to respond to these changes being made in the introduction of BIM (Building Information Modeling). But as 2D drawings are still to be widely used in practical fields, it is very important that 2D drawing information could be easily and clearly projected from 3D BIM data. In this study suggest that efficiency of design phase in BIM-based construction projects for can cause confusion and additional work in traditional to BIM.

  • PDF