• Title/Summary/Keyword: Construction delays

Search Result 183, Processing Time 0.025 seconds

Design and Implementation of Piping Spool Management Android Application using QR Code (QR Code를 활용한 배관 스풀관리용 안드로이드 어플리케이션 설계 및 구현)

  • Jeon, Sang-Moon;Kim, Kyoung-Su
    • Journal of Digital Contents Society
    • /
    • v.13 no.4
    • /
    • pp.609-616
    • /
    • 2012
  • Plumbing of the plant project is an important discipline. Now workers on the construction site, carry hundreds of piping spool drawings and documents, record the Spool Stage data. Then, The data is input into the system or has been documented in the field office. Because of the work-flow, duplication work occurs. As a result, it is reducing the effectiveness of the Plumbing and causes schedule delays. Also, To manage the integration process, there is a problem, it takes a lot of time. Therefore, The study is conducted to design and implementation of piping spool management Android Application using QR Code. The Application will contribute to the management to the integration of piping work process.

A Review on the legal aspects of Airport Operation and Privatization in korea (한국의 공항운영 현황과 민영화에 대한 법적 고찰)

  • Hong, Sun-Gil;Lee, Gang-Seok
    • The Journal of Aerospace Industry
    • /
    • s.49
    • /
    • pp.3-40
    • /
    • 1999
  • In this paper, the types of airport operation are categorized four groups in context of ownership and operational management; full government ownership and operation; government ownership with privatization of selected service; government ownership and private management; private ownership and operation. The term,"Privatization" has a different definition when it is used in different contexts and cultures. In this paper, the definition of"Privatization" in the context of airport, is that the movement of an entity from the government sector to the private sector. To keep pace with the remarkable growth in the air traffic volume of passengers and cargo, more and more mega-international airports have been built or are under construction. As the air transport demand is expected to increase at an even greater rate in the 21st century, the need for new conception airport is merging to solve the current problems such as airport congestions and flight delays which will be essential factors to decide whether the competitive airports or not. Presently, we researched the type of the operational management to strengthen the competitiveness for Korea's airports. Specifically, It is focused on the government ownership with privatization of selected services. It seems to be evaluated as government ownership and private management when it is actively utilized within Korea Airport Authority's law or Inchon International Airport's public corporation law. To make more competitive airport in 21st Century, however, it is desirable to seek for the method to gradually evaluate to private ownership and operation.

  • PDF

A Study of Piping Leadtime Forecast in Offshore Plant’s Outfittings Procurement Management (해양플랜트 의장품 조달관리를 위한 배관 공정 리드타임 예측 모델에 관한 연구)

  • Ham, Dong Kyun;Back, Myung Gi;Park, Jung Goo;Woo, Jong Hun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.1
    • /
    • pp.29-36
    • /
    • 2016
  • In shipbuilding and offshore plant construction, pipe-stools of various types are installed. Moreover, these are many quantities but they must be installed in a successive manner. Due to these characteristics the pipe-stool installation processes easily tends to cause the schedule delays in the overall production processes. In order to reduce delay, the goal of this study is to predicts production’s lead time before manufacturing. Through this predictions it’s expected to reduce total production’s lead time by improving it's process. First of all, we made MLR(Multiple Linear Regression) and PLSR(Partial Least Square Regression) model to predict pipe-spool's lead time and then compared predictability of MLR and PLSR model. If a explanatory variable is added, it will be possible to predict results precisely.

Proposal for an Inundation Hazard Index of Road Links for Safer Routing Services in Car Navigation Systems

  • Kim, Ji-Young;Lee, Jae-Bin;Lee, Won-Hee;Yu, Ki-Yun
    • ETRI Journal
    • /
    • v.32 no.3
    • /
    • pp.430-439
    • /
    • 2010
  • Inundation of roads by heavy rainfall has attracted more attention than traffic accidents, traffic congestion, and construction because it simultaneously causes travel delays and threatens driver safety. For these reasons, in this paper, we propose an inundation hazard index (IHI) of road links, which shows the possibility of inundation of road links caused by rainfall. To generate the index, we have used two key data sources, namely the digital elevation model (DEM) and past rainfall records of when inundation has occurred. IHI is derived by statistically analyzing the relationships between the normalized relative height of the road links calculated from DEM within the watershed and past rainfall records. After analyzing the practical applicability of the proposed index with a commercial car navigation system through a set of tests, we confirmed that the proposed IHI could be implemented to choose safer routes, with reduced chances of encountering roads having inundation risks.

An Overview of Seabed Storage Methods for Pipelines and Other Oil and Gas Equipment

  • Fatah, M.C.;Mills, A.;Darwin, A.;Selman, C.
    • Corrosion Science and Technology
    • /
    • v.16 no.2
    • /
    • pp.76-84
    • /
    • 2017
  • In the construction of subsea oil and gas developments, it is increasingly common that subsea oil and gas equipment will be installed in subsea well before final hookup and production. Installation of wellheads, subsea hardware, pipelines, and surface facilities (platforms, FPSO, FLNG, connected terminals, or gas plants) are increasingly driven by independent cost and vessel availability schedules; this gives rise to requirements that the subsea facilities must be stored in the seabed for a specific time. In addition, schedule delays, particularly in the installation or startup of the connected platform, FPSO, FLNG, or onshore plant may cause unexpected extensions of the intended storage period. Currently, there are two methods commonly used for storage subsea facilities in the seabed: dry parking and wet parking. Each method has its own risks, challenges, and implications for the facility life and its integrity. The corrosion management and preservation method selection is a crucial factor to be considered in choosing the appropriate storage method and achieving a successful seabed storage. An overview of those factors is presented, along with a discussion on the internal corrosion threats and assessments.

Simulation Based Investigation of Focusing Phased Array Ultrasound in Dissimilar Metal Welds

  • Kim, Hun-Hee;Kim, Hak-Joon;Song, Sung-Jin;Kim, Kyung-Cho;Kim, Yong-Buem
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.228-235
    • /
    • 2016
  • Flaws at dissimilar metal welds (DMWs), such as reactor coolant systems components, Control Rod Drive Mechanism (CRDM), Bottom Mounted Instrumentation (BMI) etc., in nuclear power plants have been found. Notably, primary water stress corrosion cracking (PWSCC) in the DMWs could cause significant reliability problems at nuclear power plants. Therefore, phased array ultrasound is widely used for inspecting surface break cracks and stress corrosion cracks in DMWs. However, inspection of DMWs using phased array ultrasound has a relatively low probability of detection of cracks, because the crystalline structure of welds causes distortion and splitting of the ultrasonic beams which propagates anisotropic medium. Therefore, advanced evaluation techniques of phased array ultrasound are needed for improvement in the probability of detection of flaws in DMWs. Thus, in this study, an investigation of focusing and steering phased array ultrasound in DMWs was carried out using a time reversal technique, and an adaptive focusing technique based on finite element method (FEM) simulation. Also, evaluation of focusing performance of three different focusing techniques was performed by comparing amplitude of phased array ultrasonic signals scattered from the targeted flaw with three different time delays.

Cooperative Design Method for Building Projects (건축 프로젝트의 협력설계 방안)

  • Kim, Eun-Youn;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.67-76
    • /
    • 2011
  • Two main features of the recent building project are the enlargement of the size and the technological complexity. Due to these features, the number or the size of organizations participating in building project is also increasing and the relationships between the organizations are becoming more interdependent than ever. Owing to these features, some delays or errors in the decision-making process in the phase of planning of a building project may influence many subjects related to the project. The most important factor for a successful project is to arbitrate confrontations and build cooperative relationships between parties who have different interests with one another in the project. Efforts were made to find out general features of building project and the features in the phase of planning in order to set a direction of this research. To solve problems in the phase of planning, the concept of 'cooperative design', which means that different features and interests of various organizations should be reflected from the phase of planning, was introduced. By introducing cooperative design in building projects, more rapid and objective decision-makings are possible.

  • PDF

Designing a Vehicles for Open-Pit Mining with Optimized Scheduling Based on 5G and IoT

  • Alaboudi, Abdulellah A.
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.3
    • /
    • pp.145-152
    • /
    • 2021
  • In the Recent times, various technological enhancements in the field of artificial intelligence and big data has been noticed. This advancement coupled with the evolution of the 5G communication and Internet of Things technologies, has helped in the development in the domain of smart mine construction. The development of unmanned vehicles with enhanced and smart scheduling system for open-pit mine transportation is one such much needed application. Traditional open-pit mining systems, which often cause vehicle delays and congestion, are controlled by human authority. The number of sensors has been used to operate unmanned cars in an open-pit mine. The sensors haves been used to prove the real-time data in large quantity. Using this data, we analyses and create an improved transportation scheduling mechanism so as to optimize the paths for the vehicles. Considering the huge amount the data received and aggregated through various sensors or sources like, the GPS data of the unmanned vehicle, the equipment information, an intelligent, and multi-target, open-pit mine unmanned vehicle schedules model was developed. It is also matched with real open-pit mine product to reduce transport costs, overall unmanned vehicle wait times and fluctuation in ore quality. To resolve the issue of scheduling the transportation, we prefer to use algorithms based on artificial intelligence. To improve the convergence, distribution, and diversity of the classic, rapidly non-dominated genetic trial algorithm, to solve limited high-dimensional multi-objective problems, we propose a decomposition-based restricted genetic algorithm for dominance (DBCDP-NSGA-II).

Consideration of guide sensor for Autonomous Electric Cart (자율전동카트 가이드 센서 고찰)

  • Jae Geun Lee;Sung Gi Kwon;Gye Choon Park
    • Journal of Drive and Control
    • /
    • v.21 no.3
    • /
    • pp.1-8
    • /
    • 2024
  • Electric cart, one of the many devices created to aid golfers, combines software and wireless technology with over 200 different parts and computers. It is designed to be controlled remotely and can be started or stopped using a remote control while on the golf course. However, one recurring issue is the frequent derailment of the electric cart during operation. This problem not only hampers game performance but also causes delays as drivers lose focus. The objective of this study is to enhance the driving system of autonomous electric carts, which are controlled by the driver's signals, in order to address the issue of derailments. These autonomous carts follow a line tracer on the course. By examining the evolution of golf carts and the safety enhancements implemented in current models, we propose to supplement the autonomous driving system to increase safety and improve the performance of these electric carts.

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.