THE USE OF MOBILE COMPUTERS FOR CONSTRUCTION PROJECTS

  • Chul S. Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.956-961
    • /
    • 2009
  • When construction engineers perform their work in the jobsite, they have to record as-built conditions in the project log (Data Collection). On the other hand, the engineers often have to refer to the construction documents when necessary at the job faces (Data Access). The practice of Data Collection and Data Access in the jobsite can be greatly enhanced by utilizing mobile computing with wireless communications. In this paper, two cases of mobile computing applications for construction field management are presented; Mobile Specifications System and Mobile Data Collection System. The demonstration of the process for developing two mobile applications is the primary purpose of the paper. The problems and issues involved with adopting mobile computing for construction field are also presented. The simple information framework for mobile computing has been also proposed as an outcome of the research. As for development tools, readily available relational database and wireless network have been used. The use of commercial mobile broadband was examined for data communication where local area network is not available.

  • PDF

Emerging Technologies for Construction Data Collection

  • Han, Seung-Woo
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.181-186
    • /
    • 2006
  • Estimation based on current data of construction performances have become one of the critical subjects which many researchers have been interested in for the past decades. In order to accomplish accurate measurement and estimation of construction performances, the method of data collection stands the highest priority. However, there are many difficulties in data collection from construction jobsite due to the characteristics of the construction industry. With developments of new technologies in other industries, several technologies has recently initiated to be applied to construction field. Electronic tags based on the identification technology, automatic volume measurement based on laser scanning technology, and Global Positioning System (GPS) have been represented the technologies which show the high opportunity for being used in construction. This study reviews specific aspects of these technologies focused on the utilization in construction jobsite. Also, the challenges which these technologies need to overcome are discussed.

  • PDF

AUTOMATED DATA COLLECTION TECHNOLOGY APPLICATIONS IN CONSTRUCTION

  • Ronie Navon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.27-29
    • /
    • 2009
  • Real-time control of on-site construction, based on high quality data, is essential to identify discrepancies between actual and planned performances. Additionally, real-time control enables timely corrective measures to be taken when needed to reduce the damages caused by the discrepancies. The focus of the presentation will be on our work, which uses automated data technologies to collect data needed for real time control.

  • PDF

Data Collection Methodology of Activity Production Rates for Contract Time Determination

  • 허영기;김창완;송종철
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.114-123
    • /
    • 2004
  • Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

AUTOMATED PROGRESS MEASUREHEMT FOR CONTRUCTION PROJECT

  • Seunghee Kang;Youngsoo Jung
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1068-1074
    • /
    • 2009
  • The progress is widely used as a critical index for successful construction project management. In spite of the importance of progress measurement, the excessive management effort to collect and maintain detailed data has been highlighted as a major barrier to measurement of highly accurate progress. In order to reduce the required workload and to enhance accuracy, several researches have been conducted. These researches can be categorized into two groups. First group focuses on automated data collection utilizing advanced technologies only for limited construction tasks. The second group is a research area where the standard progress measurement methodologies encompassing entire construction tasks are investigated. Topics include the adjusting the level of details, standardizing work processes, and applying flexible WBS. However, the techniques for automated data collection are not fully investigated yet in the second group. Combining these two research areas can provide a solution for more effective progress management in terms of enhancing accuracy and optimizing workload. However, there has been no comprehensive research addressing these two research groups in an integrated manner. In this context, the purpose of this paper is to propose a methodology that identifies the most suitable measurement method and data acquisition technology (e.g., GPS, RFID, etc.) for entire construction tasks of a project. The proposed methodology in this paper will be able to facilitate the selection process of data acquisition technologies for entire construction tasks of a project and to support the overall enhancement of automated progress management.

  • PDF

WIRELESS SENSOR NETWORK BASED BRIDGE MANAGEMENT SYSTEM FOR INFRASTRUCTURE ASSET MANAGEMENT

  • Jung-Yeol Kim;Myung-Jin Chae;Giu Lee;Jae-Woo Park;Moon-Young Cho
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1324-1327
    • /
    • 2009
  • Social infrastructure is the basis of public welfare and should be recognized and managed as important assets. Bridge is one of the most important infrastructures to be managed systematically because the impact of the failure is critical. It is essential to monitor the performance of bridges in order to manage them as an asset. But current analytical methods such as predictive modeling and structural analysis are very complicated and difficult to use in practice. To apply these methods, structural and material condition data collection should be performed in each element of bridge. But it is difficult to collect these detailed data in large numbers and various kinds of bridges. Therefore, it is necessary to collect data of major measurement items and predict the life of bridges roughly with advanced information technologies. When certain measurement items reach predefined limits in the monitoring bridges, precise performance measurement will be done by detailed site measurement. This paper describes the selection of major measurement items that can represent the tendency of bridge life and introduces automated bridge data collection test-bed using wireless sensor network technology. The following will be major parts of this paper: 1) Examining the features of conventional bridge management system and data collection method 2) Mileage concept as a bridge life indicator and measuring method of the indicator 3) Test-bed of automated and real-time based bridge life indicator monitoring system using wireless sensor network

  • PDF

해외사례조사를 통한 녹색건설 비용 및 편익 정보 체계의 개선 방향 (Improvement Scheme on Green Construction Cost & Benefit through Analyzing Trends and Case Studies)

  • 김원태;최석인;장철기
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.44-54
    • /
    • 2013
  • 전세계적으로 녹색 건설에 대한 관심과 필요성이 높아지고 있는 시점에 있다. 정부도 녹색 성장 기조 하에 건축물의 에너지 사용량 저감을 위한 공격적인 목표를 설정하고 다양한 정책적 지원책을 통해 추진하고 있다. 하지만 녹색건설 시장의 지속적인 성장을 위해서는 수요 주체의 녹색 투자 의사 결정을 지원할 수 있는 녹색 건설 투자 비용과 경제적 편익 정보가 제공되어야 하지만, 녹색 건설 선진국에 비해 국내 건설산업계에서는 녹색건설의 비용이나 편익과 관련한 구체적이고 객관적인 자료가 부족하고 분석이 부족한 실정이다. 이에 본 연구에서는 건설 산업 차원에서 녹색 건설 비용의 개념을 정의하고, 녹색 비용 및 편익 정보 체계와 관련한 녹색건설선진국의 다양한 사례를 살펴봄으로써 국내 녹색건축 비용 및 편익 정보 체계의 문제점을 도출하고 개선 방안을 제시하였다. 본 연구에서 제시한 녹색 건설 비용 및 편익 정보의 분류, 축적, 활용 메커니즘이 해당 건설 상품의 경제적 타당성 검증 작업을 견인할 수 있을 것으로 기대한다.

Game Engine Driven Synthetic Data Generation for Computer Vision-Based Construction Safety Monitoring

  • Lee, Heejae;Jeon, Jongmoo;Yang, Jaehun;Park, Chansik;Lee, Dongmin
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.893-903
    • /
    • 2022
  • Recently, computer vision (CV)-based safety monitoring (i.e., object detection) system has been widely researched in the construction industry. Sufficient and high-quality data collection is required to detect objects accurately. Such data collection is significant for detecting small objects or images from different camera angles. Although several previous studies proposed novel data augmentation and synthetic data generation approaches, it is still not thoroughly addressed (i.e., limited accuracy) in the dynamic construction work environment. In this study, we proposed a game engine-driven synthetic data generation model to enhance the accuracy of the CV-based object detection model, mainly targeting small objects. In the virtual 3D environment, we generated synthetic data to complement training images by altering the virtual camera angles. The main contribution of this paper is to confirm whether synthetic data generated in the game engine can improve the accuracy of the CV-based object detection model.

  • PDF

A HAZARDOUS AREA IDENTIFICATION MODEL USING AUTOMATED DATA COLLECTION (ADC) BASED ON BUILDING INFORMATION MODELLING (BIM)

  • Hyunsoo Kim;Hyun-Soo Lee;Moonseo Park;Sungjoo Hwang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.17-22
    • /
    • 2011
  • A considerable number of construction disasters occur on pathways. Safety management is usually performed on construction sites to prevent accidents in activity areas. This means that the safety management level of hazards on pathways is relatively minimized. Many researchers have noted that hazard identification is fundamental to safety management. Thus, algorithms for helping safety managers to identify hazardous areas are developed using automated data collection technology. These algorithms primarily search for potential hazardous areas by comparing workers' location logs based on a real-time location system and optimal routes based on BIM. Potential hazardous areas are filtered by identified hazardous areas and activity areas. After that, safety managers are provided with information about potential hazardous areas and can establish proper safety countermeasures. This can help to improve safety on construction sites.

  • PDF