A FEASIBILITY STUDY ON THE NUMERICAL PRE-ASSEMBLY SIMULATION USING 3D LASER SCANNING MEASUREMENT

  • Kyoungmin Kim ;Seok Kim ;Chan-Hyuk Park ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1193-1198
    • /
    • 2005
  • The pre-assembly takes a large portion of the fabrication cost of steel bridges. In order to save the fabrication cost through the improvement of the conventional pre-assembling process, this research investigates a numerical pre-assembly simulation as an alternative to current pre-assembling process. The 3D laser scanning was utilized in site and measuring data for steel box were analyzed. The productivity of pre-assembly simulation system is compared with the conventional pre-assembling system. This paper identifies feasibility on the alternative pre-assembling process and then proposes the scheme of the pre-assembly simulation system development satisfying the current pre-assembly inspection of standards.

  • PDF

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

A Study on the Development of the Property Information Modeling Methods for the Trades without Shape Information (형상정보가 없는 공종의 속성정보모델링 기법 개발에 관한 연구)

  • Lee, Min-Cheol;Lee, Sang-Jin;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.114-125
    • /
    • 2011
  • Construction industries worldwide have moved to Building Information Modeling environment in conjunction with IT technology progress. Korean domestic construction market is in the midst of enthusiastically adopting BIM technique and the public sectors try to apply the method to their projects. Difficulties have been introduced, however, in doing so mainly due to the complexity in reflecting the distinctions of the public cost estimate requirements to BIM modeling. The main objective of this study is to propose four kinds of BIM property information modeling methodologies which would be used in the quantity surveys of the public construction projects. To evaluate the applicability of the suggested modeling methods, the research performed a case study.

Development of BIM Based Information Model Interface Module for a Modular Pier (모듈러 교각의 BIM 기반 정보 모델 인터페이스 모듈 개발)

  • Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.1-7
    • /
    • 2015
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the data exchange between the contractors, designers, fabricators and constructors. Therefore, a readily accessible information model interface module based on BIM technology is essential for their communication during a project life-cycle. In this study, BIM based information model interface module for a modular pier was developed. For the information models, the PBS(Product Breakdown Structure) and LOD(Level of Development) were defined. Next, all components of a modular pier were conducted by the parametric modeling technique, and then 3D cell library interface was developed. An nterface module was also developed using VBA(Visua basic Application) for exchanging a data from 3D model library to other softwares such as Microstation, AutoCad and Excel and was connected with MS Access database. The developed information model interface module would improve the design quality of the modular pier and reduce the time and cost for design. Updated 3D information models could be utilized for the fabrication, assembly, and construction process for modular piers.

Application of Sensor Technology for the Efficient Positioningand Assembling of Ship Blocks

  • Lee, Sang-Don;Eun, Seong-Bae;Jung, Jai-Jin;Song, Ha-Cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.2 no.3
    • /
    • pp.171-176
    • /
    • 2010
  • This paper proposes the application of sensor technology to assemble ship blocks efficiently. A sensor-based monitoring system is designed and implemented to improve shipbuilding productivity by reducing the labor cost for the adjustment of adequate positioning between ship blocks during pre-erection or erection stage. For the real-time remote monitoring of relative distances between two ship blocks, sensor nodes are applied to measure the distances between corresponding target points on the blocks. Highly precise positioning data can be transferred to a monitoring server via wireless network, and analyzed to support the decision making which needs to determine the next construction process; further adjustment or seam welding between the ship blocks. The developed system is expected to put to practical use, and increase the productivity during ship blocks assembly.

Field investigation and numerical study of ground movement due to pipe pile wall installation in reclaimed land

  • Hu Lu;Rui-Wang Yu;Chao Shi;Wei-Wei Pei
    • Geomechanics and Engineering
    • /
    • v.34 no.4
    • /
    • pp.397-408
    • /
    • 2023
  • Pipe pile walls are commonly used as retaining structures for excavation projects, particularly in densely populated coastal cities such as Hong Kong. Pipe pile walls are preferred in reclaimed land due to their cost-effectiveness and convenience for installation. However, the pre-bored piling techniques used to install pipe piles can cause significant ground disturbance, posing risks to nearby sensitive structures. This study reports a well-documented case history in a reclamation site, and it was found that pipe piling could induce ground settlement of up to 100 mm. Statutory design submissions in Hong Kong typically specify a ground settlement alarm level of 10 mm, which is significantly lower than the actual settlement observed in this study. In addition, lateral soil movement of approximately 70 mm was detected in the marine deposit. The lateral soil displacement in the marine deposit was found to be up to 3.4 and 3.1 times that of sand fill and CDG, respectively, mainly due to the relatively low stiffness of the marine deposit. Based on the monitoring data and site-investigation data, a 3D numerical analysis was established to back-analyze soil movements due to the installation of the pipe pile wall. The comparison between measured and computed results indicates that the equivalent ground loss ratio is 20%, 40%, and 20% for the fill, marine deposit and CDG, respectively. The maximum ground settlement increases with an increase in the ground loss ratio of the marine deposit, whereas the associated influence radius remains stationary at 1.2 times the pipe pile wall depth (H). The maximum ground settlement increases rapidly when the thickness of marine deposit is less than 0.32H, particularly for the ground loss ratio of larger than 40%. This study provides new insights into the pipe piling construction in reclamation sites.