EFFECTS OF ADOPTING KMS BASED BUSINESS PROCESS MANAGMENT IN DESIGN COMPANIES IN KOREA

  • Jin-Won Hwang;Hyung-Won Choi;Doo-Won Hwang;Young-Woong Song;Hyong-Chul Lim;Yoonki Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1030-1035
    • /
    • 2009
  • The value of intangible assets of a company attracts attention in enterprise management environment drastically changing. Following such a trend, many companies have adopted knowledge management. Especially in construction industry of which success of a project is easily affected by the capacity of various participants and work performers, we may find many cases to which the knowledge managements have been adopted. However, the domestic design companies have tended to be late to introduce the knowledge management or have difficulty in effective use of KMS already constructed. This study suggests KMS based on BPM (Business Process Management) and drives its effects to improve problems mentioned above. We drives the expected effects by studying the existing studies and surveying domestic design companies and suggests Prototype for introducing a real system.

  • PDF

Monitoring and performance assessment of a highway bridge via operational modal analysis

  • Reza Akbari;Saeed Maadani;Shahrokh Maalek
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.3
    • /
    • pp.191-205
    • /
    • 2023
  • In this paper, through operational modal analysis and ambient vibration tests, the dynamic characteristics of a multi-span simply-supported reinforced concrete highway bridge deck was determined and the results were used to assess the quality of construction of the individual spans. Supporting finite element (FE) models were created and analyzed according to the design drawings. After carrying out the dynamic tests and extracting the modal properties of the deck, the quality of construction was relatively assessed by comparing the results obtained from all the tests from the individual spans and the FE results. A comparison of the test results among the different spans showed a maximum difference value of around 9.3 percent between the superstructure's natural frequencies. These minor differences besides the obtained values of modal damping ratios, in which the differences were not more than 5 percent, can be resulted from suitable performance, health, and acceptable construction quality of the bridge.

Activity and Safety Recognition using Smart Work Shoes for Construction Worksite

  • Wang, Changwon;Kim, Young;Lee, Seung Hyun;Sung, Nak-Jun;Min, Se Dong;Choi, Min-Hyung
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.2
    • /
    • pp.654-670
    • /
    • 2020
  • Workers at construction sites are easily exposed to many dangers and accidents involving falls, tripping, and missteps on stairs. However, researches on construction site monitoring system to prevent work-related injuries are still insufficient. The purpose of this study was to develop a wearable textile pressure insole sensor and examine its effectiveness in managing the real-time safety of construction workers. The sensor was designed based on the principles of parallel capacitance measurement using conductive textile and the monitoring system was developed by C# language. Three separate experiments were carried out for performance evaluation of the proposed sensor: (1) varying the distance between two capacitance plates to examine changes in capacitance charges, (2) repeatedly applying 1 N of pressure for 5,000 times to evaluate consistency, and (3) gradually increasing force by 1 N (from 1 N to 46 N) to test the linearity of the sensor value. Five subjects participated in our pilot test, which examined whether ascending and descending the stairs can be distinguished by our sensor and by weka assessment tool using k-NN algorithm. The 10-fold cross-validation method was used for analysis and the results of accuracy in identifying stair ascending and descending were 87.2% and 90.9%, respectively. By applying our sensor, the type of activity, weight-shifting patterns for balance control, and plantar pressure distribution for postural changes of the construction workers can be detected. The results of this study can be the basis for future sensor-based monitoring device development studies and fall prediction researches for construction workers.

Reclaiming Multifaceted Financial Risk Information from Correlated Cash Flows under Uncertainty

  • Byung-Cheol Kim;Euysup Shim;Seong Jin Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.602-607
    • /
    • 2013
  • Financial risks associated with capital investments are often measured with different feasibility indicators such as the net present value (NPV), the internal rate of return (IRR), the payback period (PBP), and the benefit-cost ratio (BCR). This paper aims at demonstrating practical applications of probabilistic feasibility analysis techniques for an integrated feasibility evaluation of the IRR and PBP. The IRR and PBP are concurrently analyzed in order to measure the profitability and liquidity, respectively, of a cash flow. The cash flow data of a real wind turbine project is used in the study. The presented approach consists of two phases. First, two newly reported analysis techniques are used to carry out a series of what-if analyses for the IRR and PBP. Second, the relationship between the IRR and PBP is identified using Monte Carlo simulation. The results demonstrate that the integrated feasibility evaluation of stochastic cash flows becomes a more viable option with the aide of newly developed probabilistic analysis techniques. It is also shown that the relationship between the IRR and PBP for the wind turbine project can be used as a predictive model for the actual IRR at the end of the service life based on the actual PBP of the project early in the service life.

  • PDF

Determination of Optimal Mixing Ratio of Phosphorescent Pigment to Develop Phosphorescent Paint for Road Line Marking (도로의 축광차선 도료 개발을 위한 축광안료 최적 배합비 산정에 관한 연구)

  • Lee, Yong Mun;Kim, Sang Tae;Kim, Heung Rae
    • International Journal of Highway Engineering
    • /
    • v.17 no.5
    • /
    • pp.67-73
    • /
    • 2015
  • PURPOSES : This study was conducted to derive the optimum mixing ratio of phosphorescent pigment for the development of phosphorescent line marking. METHODS: In this study, we utilized a literature review and case study methodology, to describe the domestic and foreign state of practice for the production and mixing of phosphorescent pigment for use in line marking. The optimal mixing ratio was derived by comparing the reduction in luminance over time for the various phosphorescent pigment mixing ratios identified in the literature. In addition, performance and construction characteristics were analyzed using field testing techniques. RESULTS : The results were as follows: 1) the results of the luminance performance standards tests showed that all of the phosphorescence test specimens satisfied the phosphorescent fire protection standard. As the phosphorescent pigment mixing ratio increased, the luminance value increased, 2) the luminance reduction rate was minimum at the mixing ratio of 50%. However, when compared to a mixing ratio 40%, a small difference was recorded, the luminance reduction rate from the mixing ratio of 40% is judged as being converged. Therefore, in view of the economic efficiency, it was determined that the optimal mixing ratio was 40%, 3) as a result of construction on the field, a mixing ratio of 40% was found to have a higher luminance value than the general line marking for up to three hours after sunset, 4) it was found that the phosphorescent line markings without glass beads spraying had a higher luminance value than the phosphorescent line markings with glass beads spraying. CONCLUSIONS : Through the results of the basic experiments of the line markings obtained by blending a phosphorescent pigment, the results could be applied to play an important role in the development of phosphorescent line marking paint technology and in establishing application planning for on-site construction characteristics.

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Prediction Model of Construction Safety Accidents using Decision Tree Technique (의사결정나무기법을 이용한 건설재해 사전 예측모델 개발)

  • Cho, Yerim;Kim, Yeon-Choel;Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.3
    • /
    • pp.295-303
    • /
    • 2017
  • Over the past 7 years, the number of victims of construction disasters has been gradually increasing. Compared with projects in other industries, construction projects are highly exposed to safety risks. For this reason, the research methods of predicting and managing the risk of construction disasters are urgently needed that can be applied to a construction site. This study aims to propose a prediction model for a construction disaster using the decision tree technique. The developed the model is reviewed the applicability by evaluating its accuracy based on disaster data. The top three of the prediction values obtained from the proposed model were enumerated, and then the cumulative accuracy were also calculated. The prediction accuracy was 40 percent for the first value, but the cumulative accuracy was 80 percent. Thus, as more disaster data was accumulated, the cumulative accuracy appeared to be higher. If utilized in construction sites, the model proposed in this study would contribute to a reduction in the rate of construction disasters.

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

A Study on the Establishment of a Collaboration Relationship between Prime and Subcontractors in Korean Construction Industry - Focused on the Gangwon Area - (건설업 원.하청 기업간 협력관계 구축에 관한 연구 -강원지역을 중심으로-)

  • Kim, Jin-Bong;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.95-107
    • /
    • 2008
  • Recently, a size of the domestic construction industry Has been reduced rapidly, and its economic slump Has been continued with the government real estate stabilization and tax policies. Moreover, as the reconstruction of apartments that has been added high value to the construction companies has been on the stake of high risk with delays of reconstruction start and finance restriction policies, an uncertainty of the construction markets and the competitions between the construction companies has been increased. At this point, the establishment of a collaboration relationship between construction companies has been recognized as one of the methodologies to respond actively on these uncertainties and fierce competitions. A collaboration relationship between construction companies is based on the balanced cooperation relationship for surviving together, and should be maintained on the complement and specialized collaboration between big, middle and small contractors. This paper propose a model of practical collaboration relationship to cooperate together between prime and subcontractors in Korean construction companies based on the analysis of questionnaires to the collaboration status between general and subcontractors in the Gangwon area.

CONSTRUCTION FINANCING AND INDUSTRY DEVELOPMENT

  • Yat-Hung, Chiang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.962-969
    • /
    • 2009
  • The market of building construction has been competitive in Hong Kong, perhaps as anywhere else in the world. The barrier to entry is low because there are relatively low requirements on the three factors of production - technology, manpower and finance. The prevailing building technology is traditional and labour-intensive. There is also not much need of capital because clients' periodic payments have been the main source of project finance. Further, capitalizing on trade sub-contracting, contractors have been able to keep their direct labour-force small and to transfer much of their business risk to the sub-contractors. Based on interviews to solicit the perception of a sample of building contractors on the particular issues of construction finance, we present the findings in this paper and discuss the various implications. We believe that the current practice of construction financing is both the cause and effect of the competition within, and the competitiveness of, the building construction sector in Hong Kong. We conclude that the building construction sector is "locked or stuck" in this "equilibrium" of traditional technology, reliance on clients' finance and exploitation of sub-contracting. In this "equilibrium" state, there is hardly any motivation for contractors to engage themselves in product or process innovation. Consequently, any talk of industry reform or innovation could only remain just that. We believe that this problem is not unique in Hong Kong. The building construction sector in many other developed and developing economies is posed with similar if not the same problems and constraints. We conclude that there has to be some "external forces" to bring this "equilibrium" state to a higher level "equilibrium" one where higher value-added building construction services are supplied and demanded. This is a state where building contractors possessing innovative technology, better financial and manpower resources could thrive to build better buildings with innovative building methods and processes.