The 6th International Conference on Construction Engineering and Project Management
/
pp.723-727
/
2015
Building energy use estimation relies on building characteristics, its energy systems, occupants, and weather. Energy estimation of new buildings is considerably an easy task when compared to modeling existing buildings as they require calibration with actual data. Particularly, when energy estimation of existing building stock is warranted at a city-scale, the problem is exacerbated owing to lack of construction drawings and other engineering specifications. However, as collection of buildings and other infrastructure constitute cities, such predictions are a necessary component of developing and maintaining sustainable cities. This paper uses Artificial Neural Network techniques to predict electricity consumption for residential buildings situated in the City of Gainesville, Florida. With the use of 32,813 samples of data vectors that comprise of building floor area, built year, number of stories, and range of monthly energy consumption, this paper extends the prediction to environmental impact assessment of electricity usage at the urban-scale. Among others, one of the applications of the proposed model discussed in this paper is the study of urban scale Life Cycle Assessment, and other decisions related to creating sustainable cities.
The 5th International Conference on Construction Engineering and Project Management
/
pp.488-493
/
2013
Accurate initial cost estimates are essential to effective management of construction projects where many decisions are made in the course of project management by referencing the estimates. In practice, the initial estimates are frequently derived from historical actual cost data, for which standard distribution-based techniques are widely applied in the construction industry to account for risk associated with the estimates. This approach assumes the same probability distribution of estimate errors for any selected estimates. This assumption, however, is not always satisfied. In order to account for the probabilistic nature of estimate errors, an alternative method for measuring the risk associated with a selected initial estimate is developed by applying the Bayesian probability approach. An application example include demonstrates how the method is implemented. A hypothesis test is conducted to reveal the robustness of the Bayesian probability model. The method is envisioned to effectively complement cost estimating methods that are currently in use by providing benefits as follows: (1) it effectively accounts for the probabilistic nature of errors in estimates; (2) it is easy to implement by using historical estimates and actual costs that are readily available in most construction companies; and (3) it minimizes subjective judgment by using quantitative data only.
In this study, we analyzed 82 dust damage dispute mediation cases over the past 5 years and evaluated cases where the probability of damage was verified through dust concentration measurement, modeling prediction, and chemical composition analysis. The cause of dust damage was a construction site, which accounted for most of the damage (97%), and was closely related to the distance from the construction site, total floor area of the construction site, and construction duration. Compensation was decided in only 33% of dust damage cases, and in only 6% (five cases) were damages determined using scientific techniques such as dust measurement, and forecasting. The main criteria for determining compensation were whether administrative measures were taken and evidence of damage in the form of videos and photos. In the future, measuring or model for the amount of dust damage is necessary to determine whether the limit has been exceeded and to revise the standard for calculating compensation through various lines of evidence of dust damage.
1997년 온실가스 감축을 위한 교토의정서가 채택된 이후 각 국가들은 대표적인 온실가스인 이산화탄소를 줄이기 위하여 전 산업에 걸쳐 다각적인 노력을 하고 있다. 건설산업에서도 온실가스 배출량을 고려한 Passive Design 이나, LCA기준에 의한 환경영향평가와 같은 소프트웨어적 기술의 개발 그리고 설비시스템의 조정이나 친환경 자재의 개발과 같은 하드웨어적 기술의 개발과 같이 두 가지 형태의 기술이 다양한 방법으로 개발됨으로써 이산화탄소 저감을 시도하고 있다. 그러나 건설산업에서 세부공정을 고려한 이산화탄소 배출과 관련한 연구는 전무하다. 본 연구에서는 철도노반공사 중에서 이산화탄소 배출량이 가장 많은 공정인 토공사를 대상으로 장비조합에 따른 이산화탄소 배출량을 산출하여 장비조합과 이산화탄소 배출량 그리고 공사기간의 상관성을 분석하였다.
Since the 1970's, UNESCO and ICOMOS have adopted or emphasized on the principles of historic preservation. One of them is what to require a repair have not to be repaired beyond the limits of the features and techniques to have been born in those days of establishment. On the premise, this paper is to examine the materials and technique of lime plaster work in order for roof ridge, and for bond paste of stones and bricks in government constructions in the late of Joseon dynasty(17~19c). The result of this examination will come up with a basic conformity in the case of repairing the building established in the late of Joseon dynasty. This paper is carried out for the proper repair and restoration of architectural cultural properties. Construction reports and other documents in those days are examined for the study. Following conclusions have been reached through the study. The components of old plaster mixtures which agglutinate stones each other were quicklime, perilla oil, and paper fiber. The components of old plaster mixtures which point joint of black bricks consisted of slaked lime, perilla oil, paper fiber, and cereal starch. These components were the same as coat surface of roof ridges. In the case of times, one of the following sand, white clay, sap of boiled elm bark was added to these components for the purpose of high efficiency. These materials and techniques which applied to plaster work of those buildings had developed in the process of making royal tombs. But these materials and techniques were quite different from the present.
최근 건설공사에 있어서의 VALUE ENGINEERING 적용에 대한 관심이 높아지고 있으며 VE WORK-SHOP 을 통한 많은 효과가 현대건설의 사례에서 입증이 되고 있음에도 신문매체 등에 발표되는 VE 관련 논고가 일반론적 기고에 국한되어 있어 VE에 대한 이해에 큰 도움은 되지만 갈증을 해소하기에는 어려운 실정이며 우리사회에 전문성을 가진 리더군이 많지 않음을 반증하는 것도 되기에 향후 좀더 많은 VE 경험을 토대로 한 리더군이 형성되어 다양한 주제를 기사화한 실무적인 VE 기법의 소개가 필요하다고 본다. VE 적용은 그 기법이 매우 다양하므로 해당 공사의 시기와 특성, 제약요소 팀원 구성의 전문성 등 다양한 요소를 종합적으로 고려하여 가장 적합한 형태의 VE가 추진될 수 있도록 VE 계획 시 추진 팀의 방향설정과 역할분담이 필요하고 준비되어야 한다. 특히 WORK-SHOP 형태의 VE는 현장 테마 중임의 ITEM VE에 비하여 적은 투입으로 많은 효과를 거둘 수 있지만 팀원의 전문성이 결여시 VE 작업결과의 시행에 따른 신뢰도가 떨어질 수 있는 가능성을 내포하고 있으므로 추진팀의 입장에서는 보다 세심하고 조직적으로 접근 할 필요가 있다. 성공적인 VE 작업을 하기 위하여서는 특히 WORK-SHOP 개념의 새로운 기법을 설계 및 시공초기에 단계적으로 적용하고 VE 팀 리더의 효과적인 VE 작업을 위한 절차의 명확한 이해와 선진 기법의 이해를 바탕으로 한 팀원의 교육과 가이드가 점점 중요한 요소가 되고 있다. 실제 건설공사에 있어 효과적인 VE를 적용하기 위한 핵심요소를 VE 교육을 진행하고 있는 담당 실무자 입장에서 정리하여 보았으며 기회가 허락되면 한 두 차례의 추가 연재를 통하여 상세히 논하고자 한다.
More than half of the nonpoint sources of polluting water occur in cultivating farmlands in rural areas. Agricultural nonpoint sources are discharged from large areas of farmlands, making it difficult to collect or treat pollutants. Farmland source management is known to be the most effective, and preventive management by improving farming methods is the key to reduce nonpoint pollution. At present, more than 30% of the pollutants flowing into the rivers and lakes are nonpoint pollutants caused by agricultural activities. As a countermeasure, it is more preferable to develop and apply optimal farming management techniques for agricultural nonpoint pollution management basically than to apply existing water quality management techniques. Because of the characteristics of nonpoint source pollution, it is necessary to manage farmlands in rural areas, so the willingness and competence of the residents is most important. The purpose of this study is to analyze and understand the process of changing the cognition of residents through capacity education and survey for nonpoint pollution management in rural areas. This study conducted intensive resident competency education and examined the process of changing resident awareness through three surveys. As a result of this study, it was found that continuous education and activities for rural non-point pollution management are necessary for raising awareness of residents and managing non-point pollution effectively, showing possibility of change residents' perception.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.187-194
/
2011
Optimizing truck dispatching-intervals is imperative in ready mixed concrete (RMC) delivery process. Intervals shorter than optimal may induce queuing of idle trucks at a construction site, resulting in a long delivery cycle time. On the other hand, intervals longer than optimal can trigger work discontinuity due to a lack of available trucks where required. Therefore, the RMC delivery process should be systematically scheduled in order to minimize the occurrence of waiting trucks as well as guarantee work continuity. However, it is challenging to find optimal intervals, particularly in urban areas, due to variations in both traffic conditions and concrete placement rates at the site. Truck dispatching intervals are usually determined based on the concrete plant managers' intuitive judgments, without sufficient and reliable information regarding traffic and site conditions. Accordingly, the RMC delivery process often experiences inefficiency and/or work discontinuity. Automatic data collection (ADC) techniques (e.g., RFID or GPS) can be effective tools to assist plant managers in finding optimal dispatching intervals, thereby enhancing delivery performance. However, quantitative evidence of the extent of performance improvement has rarely been reported to data, and this is a central reason for a general reluctance within the industry to embrace these techniques, despite their potential benefits. To address this issue, this research reports on the development of a discrete event simulation model and its application to a large-scale building project in Abu Dhabi. The simulation results indicate that ADC techniques can reduce the truck idle time at site by 57% and also enhance the pouring continuity in the RMC delivery process.
Open ground story (OGS) reinforced concrete (RC) buildings are vulnerable to the complete collapse or severe damages under seismic actions. This study investigates the effectiveness of four different strengthening techniques representing the local and global modifications to improve the seismic performance of a non-ductile RC OGS frame. Steel caging and concrete jacketing methods of column strengthening are considered as the local modification techniques, whereas steel bracing and RC shear wall systems are selected as the global strengthening techniques in this study. Performance-based plastic design (PBPD) approach relying on energy-balance concept has been adopted to determine the required design force demand on the strengthening elements. Nonlinear static and dynamic analyses are carried out on the numerical models of study frames to assess the effectiveness of selected strengthening techniques in improving the seismic performance of OGS frame.. Strengthening techniques based on steel braces and RC shear wall significantly reduced the peak interstory drift response of the OGS frame. However, the peak floor acceleration of these strengthened frames is amplified by more than 2.5 times as compared to that of unstrengthened frame. Steel caging technique of column strengthening resulted in a reasonable reduction in the peak interstory drift response without substantial amplification in peak floor acceleration of the OSG frame.
In order to make plan for landscape construction by ecological methods in Yukong R & D Complex site, environmental factors and structure of plant community were investigated and analyzed around Yukong R & D Complex site of Daeduk. The result of this study were as follows: 1. In the result by the classification of TWINSPAN and ordination (DCA) techniques for analysing of plant community structure, thirty plant community structure, thirty plots were divided into four groups according to soil moisture and succession trends were seem to be from the development of subsidiary vegetation through Pinus densiflora, Quercus spp., Robinia psudoacasia community to Q. acutissima community. So this result was proposed to validity of vegetation introduction for planning of ecological landscape construction in studied site. 2. On the analysis of environmental factors by ordination techeniques, the plant community were divided by soil moisture. Soilcondition will be fertilized by introduction of broad-leaved tree and the development of succession trends from the present state of plant community to Q. acutissima community. 3. The problems of horiticultural places happened to studied site, so horiticultural places for ecological landscape construction was proposed planting techniques that were considered to soil suitability, economical efficiency, native species and wildlife. 4. If we attempt to ecological landscape designs on natural systems and use natural processes to achieve desired end-points, we are more likely to produce self-sustaining solutions.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.