• Title/Summary/Keyword: Construction Structure

Search Result 6,384, Processing Time 0.03 seconds

Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.

A Study on Composition of The Construction Organization in Construction Work in Korea - Focus on Apartment of The Capital Region - (국내 건축공사 시공조직 구성에 관한 연구 - 수도권 공동주택을 중심으로 -)

  • Lee, Kyo-Sun;Kim, Hyun-Seok;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.155-160
    • /
    • 2003
  • The Korean economic crisis hit badly the local construction industry, especially during the year of the 1998 when the country took the IMF bailout proframme. Under the poor business environment, such as reduction of construction investment, financial difficulty from high interest rate, and increasing bankruptcies, restructuring measures were repuired for survival of the industry. It is obvious the restructuring process is essential for the future business success. regardless of the financial crisis. With this background, this research aims the contribute to improved construction management structure and strengthened international competitiveness of the industry through the cost reduction and productivity enhancement, by analysising and proposing and optimal level of the manpower structure of construction management organization With the subject of 24 construction fields of apartment houses in the capital region as of January 1, 1999, constructed by OO company having leaded the construction industry of the country so far now, the researcher performed the on the spot survey regarding the organization/manpower structure and construction contract amount.

The Priority Analysis of the Risk and Countermeasures for Quality Control in the Steel Structure (강구조물 공사의 품질관리를 위한 리스크 중요도 분석 및 대응방안)

  • Cho, Hang-Min;Song, Young-Woong;Ahn, Jae-Bong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.87-96
    • /
    • 2007
  • Recently construction environment is being professionalized. oversized and diversified. Due to fluctuation of construction environment, the demand for the project of steel structure is ieased gradually and steel construction is needed the efficient quality management. The construction of steel structure which required a variety of sub-contractors, the progress of works and technologies are comprehensive of various risks and uncertain factors. But currently the construction of steel structure is conducted the risk management by perception and experience of constructors. Therefore, the analyzing factors of the risk and establishing the device are able to manage the quality management efficiently. In this study, we have conducted the interview of experts, polls and through the Analysis Hierarchy Process (AHP) for the scientific and systematic risk management. This paper will propose a plan for systematization of the construction of the steel structure.

An Empirical Analysis of the Financing Behavior of Listed Construction Firms in Korea Stock Market - focused on Testing Two Capital Structure Theories -

  • Seung-Kyu Yoo;Jin-Sik Lim;Ha-Jung Yun;Jae-Kyu Choi;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.133-140
    • /
    • 2013
  • The purpose of this study is identifying the relationship among the business strategy, order receiving capability and leverage variables of a construction company using industry characteristic variables, in addition to the explanation variables used in the previous studies. The samples of this study were limited to the construction companies listed in Korean stock market. This study built multiple regression analysis models, which have been frequently used in traditional previous studies, in the explanation of company capital structure. Empirical analysis on Static Trade-off Theory and Pecking Order Theory was done by the built model. The study results suggested that the capital structure determination behavior of a construction company generally follows Static Trade-off Theory; however, profitability was found to follow Pecking Order Theory. The explanation variables used in the previous capital structure studies mostly produced significant results; however, the variables, which this study experimentally used, did not produce significant results. It is believed that it implies that additional studies are required in the selection of variables and study methodology. Consequently, a case that unconditionally supports a particular theory is scarce. It has been also found that a case can support both theories at the same time. Therefore, it is believed that development study methodology or introduction of new study methodology that can identify the dynamic characteristic of construction company capital structure formation is required.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

Thermal Crack Control of Wall Elements in LiNAC Structure (LiNAC실 벽체 구조물의 온도 균열 제어)

  • Son, Myong-Sik;Do, Yool-Ho;Na, Woon;Park, Chan-Kyu;Lee, Hoi-Keun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.11a
    • /
    • pp.413-416
    • /
    • 2006
  • This paper presents the analytical results on the heat of hydration and induced thermal cracking of the wall elements in LiNAC that is a radioactive shield concrete structure. This wall elements measuring 1.2 m in thickness and 32 m in length tend to exhibit thermal cracking due to heat of hydration and high constraint effects caused by slab element located in the lower part of structure. In this analysis, four different construction stages were considered to find out the most effective concrete casting method in terms of thermal stress. Among the construction methods adopted in this analysis, the method of installation of construction connection measuring 1.2 m at the both side of wall elements was very effective way to control the thermal stress, resulting in increase thermal cracking index of wall elements in LiNAC structure. Finally, the wall elements in LiNAC structure was cast successfully according to the proposed construction method.

  • PDF

Improvement method of process management on new han-ok style public building project (신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 -)

  • Seo, Jung-Seung;Kim, Young-Hoon;Kwak, Dong-Yeob
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

Construction of Roof Structure for Pusan Main Stadium (부산종합운동장 주경기장 지붕구조물의 시공)

  • Lee Ju-Young;Ryu Sang-Hyon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.228-231
    • /
    • 2001
  • Construction of roof structure, cable suspended structure, for Pusan main stadium is adapted a lifting method that is VSL lifting system. 5 precesses are practiced for erection of the roof structure including the first lifting process for erection of upper cables and the second lifting process for erection of lower cables. Since all cables of this roof structure with two open speller sockets are determined their length, some cable were wrong length, the roof structure would be unstable. But At complete of erection for the roof structure each cab3e is attained to theoretical tension force with average $4\%$ errors.

  • PDF

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.