Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • 제15권3호
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.

국내 건축공사 시공조직 구성에 관한 연구 - 수도권 공동주택을 중심으로 - (A Study on Composition of The Construction Organization in Construction Work in Korea - Focus on Apartment of The Capital Region -)

  • 이교선;김현석;강경인
    • 한국건축시공학회지
    • /
    • 제3권1호
    • /
    • pp.155-160
    • /
    • 2003
  • The Korean economic crisis hit badly the local construction industry, especially during the year of the 1998 when the country took the IMF bailout proframme. Under the poor business environment, such as reduction of construction investment, financial difficulty from high interest rate, and increasing bankruptcies, restructuring measures were repuired for survival of the industry. It is obvious the restructuring process is essential for the future business success. regardless of the financial crisis. With this background, this research aims the contribute to improved construction management structure and strengthened international competitiveness of the industry through the cost reduction and productivity enhancement, by analysising and proposing and optimal level of the manpower structure of construction management organization With the subject of 24 construction fields of apartment houses in the capital region as of January 1, 1999, constructed by OO company having leaded the construction industry of the country so far now, the researcher performed the on the spot survey regarding the organization/manpower structure and construction contract amount.

강구조물 공사의 품질관리를 위한 리스크 중요도 분석 및 대응방안 (The Priority Analysis of the Risk and Countermeasures for Quality Control in the Steel Structure)

  • 조항민;송영웅;안재봉;최윤기
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.87-96
    • /
    • 2007
  • 최근 국 내외 건설 환경은 대형화, 전문화, 다양화되고 있다. 이러한 건설 환경의 변화로 인하여 강구조물 프로젝트의 수요가 점차 증가하고 있으며 강구조물 공사의 효율적 품질관리의 중요성은 더욱 부각되고 있다. 강구조물 공사는 다수의 협력업체와 수많은 공종에 따른 많은 기술력을 요구하는 공사이기 때문에 다양한 리스크와 불확실 요인을 내포하고 있다. 하지만 현재 강구조물 공사의 리스크 대응 및 관리는 과학적이고 체계적 인 방법으로 진행되는 것 보다 공사자의 직감과 경험에 의존한 방법으로 진행되고 있다. 강구조물 공사의 리스크 요인을 파악하고 대응방안을 세우는 것은 강구조물 공사의 품질관리 성패를 좌우한다고 할 수 있다. 따라서 본 연구는 강구조물 공사의 과학적이고, 체계적인 리스크 관리를 위하여 전문가들의 설문조사를 실시하고 계층적 분석법(Analysis Hierarchy Process : 이하 AHP)을 통하여 리스크 중요도와 분석된 리스크 요인의 대응방안을 제시함으로써 강구조물 공사의 품질관리 체계를 정립하고자 한다.

An Empirical Analysis of the Financing Behavior of Listed Construction Firms in Korea Stock Market - focused on Testing Two Capital Structure Theories -

  • Seung-Kyu Yoo;Jin-Sik Lim;Ha-Jung Yun;Jae-Kyu Choi;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.133-140
    • /
    • 2013
  • The purpose of this study is identifying the relationship among the business strategy, order receiving capability and leverage variables of a construction company using industry characteristic variables, in addition to the explanation variables used in the previous studies. The samples of this study were limited to the construction companies listed in Korean stock market. This study built multiple regression analysis models, which have been frequently used in traditional previous studies, in the explanation of company capital structure. Empirical analysis on Static Trade-off Theory and Pecking Order Theory was done by the built model. The study results suggested that the capital structure determination behavior of a construction company generally follows Static Trade-off Theory; however, profitability was found to follow Pecking Order Theory. The explanation variables used in the previous capital structure studies mostly produced significant results; however, the variables, which this study experimentally used, did not produce significant results. It is believed that it implies that additional studies are required in the selection of variables and study methodology. Consequently, a case that unconditionally supports a particular theory is scarce. It has been also found that a case can support both theories at the same time. Therefore, it is believed that development study methodology or introduction of new study methodology that can identify the dynamic characteristic of construction company capital structure formation is required.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

LiNAC실 벽체 구조물의 온도 균열 제어 (Thermal Crack Control of Wall Elements in LiNAC Structure)

  • 손명식;도율호;나운;박찬규;이회근
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 추계 학술발표회 논문집
    • /
    • pp.413-416
    • /
    • 2006
  • This paper presents the analytical results on the heat of hydration and induced thermal cracking of the wall elements in LiNAC that is a radioactive shield concrete structure. This wall elements measuring 1.2 m in thickness and 32 m in length tend to exhibit thermal cracking due to heat of hydration and high constraint effects caused by slab element located in the lower part of structure. In this analysis, four different construction stages were considered to find out the most effective concrete casting method in terms of thermal stress. Among the construction methods adopted in this analysis, the method of installation of construction connection measuring 1.2 m at the both side of wall elements was very effective way to control the thermal stress, resulting in increase thermal cracking index of wall elements in LiNAC structure. Finally, the wall elements in LiNAC structure was cast successfully according to the proposed construction method.

  • PDF

신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 - (Improvement method of process management on new han-ok style public building project)

  • 서정승;김영훈;곽동엽
    • KIEAE Journal
    • /
    • 제17권3호
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

부산종합운동장 주경기장 지붕구조물의 시공 (Construction of Roof Structure for Pusan Main Stadium)

  • 이주영;유상현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.228-231
    • /
    • 2001
  • 부산종합운동장 주경기장 지붕구조는 케이블현수구조로 그 시공은 VSL 리프팅시스템을 사용한 인양공법을 채택하여 이루어 졌다. 본 지붕구조물의 시공은 크게 5단계 공정으로 이루어 졌고, 상기 공정 중 인양작업은 상부케이블과 하부케이블로 나누어 1차 인양작업과 2차 인양작업으로 이루어 졌다. 본 지붕구조물의 경우 각 케이블의 정착단은 조정이 불가능한 개방소켓으로 되어 있어 설계시 각 케이블의 길이 계산이 잘못될 경우에는 케이블이 구조부재로써 소정의 성능을 유지하기 위해 필요한 인장응력의 도입이 불가능하게 된다. 그러나, 구조물의 인양이 완료된 상태에서 계측된 각 케이블의 장력에 의하면 평균 $4\%$정도의 정확도를 보이고 있어 설계뿐만 아니라 지붕구조와 관련된 모든 공정의 시공이 치밀하게 이루어 졌음을 보여 주고 있다.

  • PDF

OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구 (A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly)

  • 이정욱;이한수;이치호;노현석
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.89-100
    • /
    • 2022
  • 최근, OSC(Off-Site Construction)기반 PC구조의 활성화를 위한 제도적 기반 마련의 일환으로 적정공사비 산정에 필요한 품셈 개발을 요구받고 있다. PC공법의 공사비는 공장제작-운반-현장설치의 단계로 구성된다. 최근 운반과 현장 설치는 부재(subsidiary materials)별 현장실태 조사 결과를 반영한 표준품셈 체계(standard product calculation system)를 제시하는 등 관련 연구가 진행되고 있다(Lee et al., 2021). 반면, 공장 제작 공사비 산정과 관련된 연구는 전무한 실정이다. 본 연구에서는 PC 공법의 공장제작 공사비 산정기준 마련을 위해 공장 제작 환경에 활용할 수 있는 품셈 체계를 제시하였다. 이를 위해 시공절차에 따른 작업 공종을 도출하였으며, 공종별로 연계된 표준품셈을 분석하여 작업 특성에 적합한 표준 투입인력을 산출하였다. 품셈 체계는 PC부재의 현장설치와 동일하게 기둥, 보, 벽체, 슬래브 부재로 구성하였으며, 공종별 기능공을 기준으로 부재별 기본공수를 제시함으로서 직접노무비의 산출이 가능하도록 하였다. 또한, 개별 부재의 규격(m3)에 따라 생산성이 변화되는 특성을 고려하여 부재 크기를 품의 할증 요소로 제시하였다. 본 연구결과는 현재 견적에 의해 재료비료 계상되는 PC공법의 공장제작 비용을 객관적으로 검증할 수 토대 마련에 기여할 수 것이다.