• 제목/요약/키워드: Construction Structure

검색결과 6,415건 처리시간 0.032초

PC부재의 접합부 거푸집의 개선방안 연구 -공동주택을 중심으로- (Improvement Plan for Connecting Form of PC Member -Focused on Apartment Buildings-)

  • 김선형;최재휘;김선국;이동훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.9-12
    • /
    • 2010
  • Conventional apartment building projects have favored wall slab structure for the ease of construction and economic viability. However, wall slab structure, consisting of bearing walls, makes remodeling a difficult challenge. In addition, as the amendment to the Building Act in November, 2005 incentivized easy-to-remodel Rahmen structure design for apartment building in terms of floor area ratio and the number of stories, were are seeing more use of PC construct method in apartment building projects gradually. However, PC construction method requires complex connections between beams and columns, making it difficult to install and remove formwork. Furthermore, it is not possible to reuse forms after removal, generating lots of construction wastes, and it is necessary to install new forms again when the size of connection changes in line with modification of column cross-section. Researchers in Korea and elsewhere in the world have focused on structural performance of connection in PC construction method, with little attention to alternative approaches to improving connection forms for PC construction method. Accordingly, this research aims to study an approach to improving connection forms for PC construction method.

  • PDF

Importance of Construction Sequence in Numerical Modeling for Underground Structure

  • Park, Yang-Hoo;Cho, Kook-Hwan
    • International Journal of Railway
    • /
    • 제9권1호
    • /
    • pp.21-26
    • /
    • 2016
  • When excavation under existing structure is planned for a new construction project, the underpinning method is one of the most applicable construction methods. This study introduces a new modified underpinning method which is applied to construct a new subway line in Seoul Metropolitan. The new subway line was designed to pass underneath the existing subway line. Existing subway line carries about 2 million passengers daily, which is 33% of total passengers using subway in Seoul, and is the only circulation line in Seoul. Subway trains are passing 540 times through this section in a day. By applying a new underpinning method, the subway box structure of line is exposed 54m in the air supported by bearing piles. The proposed method was carefully monitored using heavy instrumentation system during construction. This study proposed and verified the application of the modified underpinning method, which can reduce construction period by 1.5 times and the construction cost by 1.2 times comparing with conventional method. The importance of considering construction sequence is investigated and verified by analyzed data non-considering construction sequence. The unexpected heaving which can bring up a dangerous situation for train running stability were measured, so this study shows that the upward movement has to be analyzed in designing process. As the use of underground space increases, the proposed method can be a good example of underground development.

지하철 콘크리트 BOX구조물의 내구성설계에 대한 연구 (A Study of Durability Design in the Subway Concrete Box Structure)

  • 권영찬;김은겸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.940-956
    • /
    • 2004
  • In the course of studying the design of securing the 100-year-long durability of 100 years the subway structure according to the requested service by the Seoul Metropolitan Subway Construction Headquarters, we analyzed 14 construction sites adopting the durability design in subway line No. 9 and concluded as follows: 1. When comparing with 158, the environment index presented for securing 100-year-long durability of subway structure in subway line No. 9, the index of durability was verified as 159.7$\~$179.8 2. When examining the increase value of durability index, we verified that the constructors didn't make various choices in method but they employed the uniformly selected system. 3. Under consideration of the bid form, the construction under bid contract in bulk gave the impacts on the construction cost with attention to selection of the durability index, while the construction under alternative contract in bid adopted uniformly the standard presented by the ordering party.

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

건축물에 영향을 미치는 열차하중에 대한 방진공사에 관한 연구 (A Study on the Construction Work to Reduce Vibration Effect to the Structure)

  • 김상용;윤지언;박태하;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.27-32
    • /
    • 2004
  • Recently, the expansion of social infrastructures and urban redevelopment, the construction works have been a rapidly increase. The subway's noise and vibration are on a continuously increasing status in its importance as by the industrial and cultural development process. Nevertheless, in our country, adequate alternative idea for the construction noise and vibration are not yet established. In this point, the purpose of this study is to know the vibration effect to the structure. This study was used to determine the standard of vibration and the way of losing vibration. The case of construction site is a good example. The data of this study was obtained by a construction company in Korea. Vibration effect could cause structural problems and affect human mental state. The results of this study are as follows; check the vibrating point, determine the suitable limit of vibration, make a good plan and construction.

  • PDF

보-기둥구조 PC공동주택 시공관리를 위한 골조공사 ADM공정표 작성 (Writing ADM Network Diagram of Frame Work for the Precast Concrete Public Apartment Building Construction Management)

  • 김기호;김민준;김진원;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2022
  • In this study, the work flow of the construction process was analyzed based on construction monitoring for a building of the middle size beam-column system Precast Concrete(PC) apartment building supplied by LH, and the Arrow Daigram Method(ADM) network diagram of its construction was written. The results of this study are judged to be able to improve productivity by using the PC structure apartment building construction plan to calculate a reasonable construction period and prepare a process management method for the PC structure frame construction.

  • PDF

A NOVEL APPROACH OF BUILDING CONSTRUCTION USING ROBOTIC TECHNOLOGY

  • Baeksuk Chu;Kyungmo Jung;Hunhee Cho;Myo-Taeg Lim;Daehie Hong
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.31-37
    • /
    • 2011
  • Construction automation is yet to be improved since construction site still faces a lot of high risks and difficulties. This research focuses on applying robotic beam assembly system in place of construction workers. This system consists of CF (Construction Factory) structure to provide adequate working environment to robot automation. The CF structure not only gives automation environment for a robot but also houses the equipments to protect from outside effects. The robotic beam assembly system also consists of robotic bolting system and robot transport mechanism. It utilizes various tools to insert and join the bolts and nuts. Visual servoing helps precise robot motion by sensing bolt hole and tail of the bolt. ITA system helps non skilled workers to easily perform the assembly work with the robot system. The robot transport mechanism includes sliding rail and cross-wired lift. It carries the robot to a desired position for assembly work.

  • PDF

건설업 임금실태 조사를 통한 건설인력의 취업구조에 관한 연구 (A Study on Recruitment Structure of Construction Workforce Through Surveying Wages in the Construction Industry)

  • 원경연;박태근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.246-249
    • /
    • 2004
  • 최근 국내 건설경기의 회복세가 뚜렷해지고 건설취업자수도 증가세를 보이고 있으나 인력수급의 양적, 질적 불균형 양상이 나타나고 있고, 경제위기를 겪으면서 건설 생산 방식과 인력 활용 방식이 과도기적 양상을 나타낸다. 또한 기능인력에 대한 수요 증가와 구조적인 공급 부족 현상은 임금 상승을 가속화시켜왔으며, 생산성과 공기 조절을 비롯한 건설 생산활동 전반에 지대한 파급효과를 미치며 건설 인력 수급의 불균형 상태는 부문별로 상이한 취업구조의 변화를 야기한다. 본 연구에서는 기존에 조사된 각 연도의 건설업 임금실태 조사를 비교분석하여 건설인력수급현황을 분석하고 건설 수급 여건에 따른 건설 인력의 취업구조를 파악하여 취업구조 변화의 특성을 살펴보고 시사점을 도출한다.

  • PDF

구조체 균열 하자 저감을 위한 균열 저감형 콘크리트의 기초적 연구 (A Basic Studies of the Concrete Crack Reduction-type Structure for Crack Reduction Flaw)

  • 박희곤;이지환;박기홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.197-198
    • /
    • 2016
  • The root cause of the crack flaw occurred in construction. This crack is represented by a construction flaw occurs in the concrete structure. Therefore, we introduce the basic properties for the type of concrete to crack reduction measures to minimize the causes flaw this paper.

  • PDF

케이슨 구조물 고내구성 콘크리트 내구수명 평가 (Service Life Evaluation of High Durability Concrete in Caisson Structure)

  • 유조형;김우재;홍석범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2014
  • In order to ensure the construction of sustainable reinforced concrete structures, durability evaluation of Caisson structures before construction should be carried out. In this paper, a service life evaluation technique using a safety factor determined by a reliability theory for Caisson structures subjected to chloride attack is proposed.

  • PDF