• Title/Summary/Keyword: Construction Standard Cost

Search Result 521, Processing Time 0.026 seconds

Load Bearing Capacity Evaluation of New Lattice Girder by Laboratory Test Techniques (실내평가기법에 의한 새로운 격자지보재의 하중지지력 평가)

  • Choi, Young-Nam;Kim, Dong-Gyou;Bae, Gyu-Jin;Jang, Yeon-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.666-672
    • /
    • 2010
  • Load bearing capacity of new lattice girder has been evaluated with optimized spider for lattice girder utilized in the construction of tunnels. This newly developed lattice girder is different from existing lattice girder as its design is associated with existing spider with newly developed 2 types of form. The spacing of lattice girder's spider is linked with the weight and it decides the unit cost and construction therefore, different spacing of the developed spider has been produced to evaluate the measurement of load bearing capacity. As the result of the tests by producing the spacing of spider as 0cm and 4cm for developed lattice girder-2, the load bearing capacity of 0cm with spacing of 21%, and 4cm with 25% of increase when they are compared with the existing lattice girder, and the weight of specimen was decreased. As the result of the tests by producing the spacing of 1cm and 6cm for developed lattice girder-3, the spacing of 1cm with 42%, and the spacing of 6cm with 11% of increase which presented higher load bearing capacity in all newly developed forms, and there was a certain degree of increase in weight in case of 1cm of spacing. The result of evaluation regarding on the displacement by applying the evaluation method suggested by the German Railroad administration, the entire specimens were found to satisfy all the evaluation standard suggested by the administration.

  • PDF

부유식 천연액화가스(LNG) 터미널의 설계 기술 개발

  • Han Yong-Seop;Lee Jeong-Han;Kim Yong-Su
    • THE INDUSTRY AND TECHNOLOGY OF GAS
    • /
    • v.5 no.1 s.6
    • /
    • pp.39-47
    • /
    • 2002
  • With the expansion of natural gas demands in many countries, the necessity of LNG receiving terminals has been increased. The offshore LNG Floating Storage and Regasification Unit (FSRU) attracts attentions not only for a land based LNG receiving terminal alternative, but also for a feasible and economic solution. Nowadays, as the reliability of offshore oil and gas floating facilities and LNG carriers gains with proven worldwide operations, the FSRU can achieve a safety level that can be comparable to an onshore terminal. The design development related with safety features of the FSRU has been extensively carried out by oil and gas companies, shipyards, engineering companies, and equipment vendors, and has been successful so far in many fields. The construction of the FSRU can be achieved by integrating various technologies and experiences from many disciplines and many participating companies and vendors. In this paper, reviews on some of the important design features and design improvements on FSRU together with the practical construction aspects in cargo containment, vaporization system, ESD system, and operation modes, have been covered in comparison with actual LNG carrier, onshore receiving terminal, and FPSO systems. In order to materialize an FSRU project, the technical and economic justification has to be preceded. It is believed that once the safety and technical soundness is convinced, the FSRU can bring a higher project feasibility by reducing the overall construction time and cost. Through this study, an FSRU design readily applicable to an actual project has been developed by incorporating experiences gained from many marine and offshore projects. The wide use of proven standard technologies adopted in the series construction of LNG carriers and offshore FPSOs will bring the project efficiency and reliability.

  • PDF

A Study on the Repair Time of the Construction Type in the Apartment Housings (공동주택 공종별 수선시기 설정 연구)

  • Lee, Kang-Hee;Park, Geun-Soo;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.22 no.4
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

Application of Electronic Deck Charge Blasting Method to a Vertical Shaft Excavation (수직구 굴착시 전자뇌관을 이용한 Deck-Charge 발파 시공사례)

  • Kim, Jae-Hong;Kim, Hee-Do;Lee, Jun-Won;Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.64-75
    • /
    • 2013
  • This case study deals with an excavation blasting carried out at "Sooseo-Pyeongtek ${\bigcirc}$-${\bigcirc}$ section construction site" in the vicinity of residential area. Originally, the sequential blasting (multi-stage blasting) using electric detonators was planed in this area. However, there was a concern that the sequential blasting method could increase the construction cost by delaying the construction period due to possible complaints from local residents. As an alternative, electronic deck blasting technique was taken in order to meet the ground vibration regulation (0.2cm/s, in apartment area) and to keep the construction schedule. The performance of the electronic deck charge blasting was two times better than the sequential blasting with electric detonators and the level of ground vibration was also within the regulatory value (0.2cm/s). In particular, it was shown that the use of electronic detonater eDevII, which was developed for tunnel, could provide more convenient and electrically safer working condition.

A Case Study About Applying Electronic Detonator on Downtown Tunnel Construction Area (도심지 터널에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Heo, Eui-Haeng;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Kim, Nam-Su
    • Explosives and Blasting
    • /
    • v.40 no.1
    • /
    • pp.29-38
    • /
    • 2022
  • Electronic detonators are now widely used in various construction sites and quarry mines. Including the sites where safety-thing is located nearby, Cases of using electronic detonators are increasing to maximize operational efficiency by improving blast fragmentation or reducing the cost of secondary blasting. This case study is about applying for electronic detonators on zone 00 construction site, which is the part of urban area metropolitan express rail A line project. Although the project was initially planned to utilize non-electric detonators, Electronic detonators are considered as the solution not only for safe and fast excavation, but also to minimize civil complaint and the damage of safety-thing. By applying electronic detonators, we were able to satisfy environmental regulations standards and prevent nearby safety-thing from getting damaged.

An Experimental Study to Establish a System for Vertifying the Insulation Performance of Buildings (건축물의 단열성능 검증 시스템 구축을 위한 실험적 연구)

  • Kim, Hyun-Jin;Choi, Se-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.203-211
    • /
    • 2021
  • Recently, the insulaton design standards for reducing the energy use of buildings have been strengthened. Althoug insulation work is the most cost-effective method for reducing the primary energy consumption per unit area of a building, there are no evaluation criteria for insulation performance at the time of construction and completion inspection. The purpose of this study is to provide objective data by establishing a standard for an analysis method and a method for easily experimenting with the exterior wall thermal transmittance of an apartment house using a thermal transmittance measuring device(TESTO 435). For the exterior wall of the test subject, the specific heat per unit area exceeded 20kJ/(m2·K), and the data at the end point suitable for ISO 9869-1 were analyzed by the average method. The measured values of the thermal transmittance for 3 consecutive days converged within +5% of the desing value, and the standard deviation of the thermal transmittance by day decreased in the order of 1-Day > 3-Day > 2-Day. The standard deviation of the thermal transmittance by time period decreased in the order of 00:00~24:00 < 19:00~07:00 < 00:00~07:00. The measured value of the thermal transmittance for the time perion of 00:00 to 07:00 per day almost coincided with an error of -3% to + 2% compare to the desing value.

A Study on Structural Maintenance of 'Old Wall' Designated as National Registered Cultural Heritage (국가등록문화재로 지정된 옛 담장의 정비 양상)

  • So, Hyun-Su;Jeong, Myeong-Seok
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.21-34
    • /
    • 2023
  • This study identified the materials and construction methods of 'Old Wall' in 13 villages which were designated as National Registered Cultural Heritage at the time of designation and examined the their structural changes based on field survey. The results are as follows: First, the 'Old Wall' consisted of 10 Soil-Stone Wall and 5 Stone Wall. At the time of designation, Stone Wall, which was built irregularly by dry-construction of natural stones, is similar in shape, but Soil-Stone Wall showed difference by the construction method of making used stones, joints, and faces. Second, the study extracted the changes of 'Old Wall' by repair and examined the changes of construction methods as well as the substitution and addition of materials of structure. The wall-roof was built with cement roof-tile and asbestos slate which have the advantage improve durability and cost-effectiveness. In addition, tile-mouth soil was added to korean traditional roof-tile to prevent rainwater from flowing in. Besides, to improve constructional convenience, the natural stone of the wall-body was replaced with blast stone, float stone and cut stone. Cement block, cement brick and cement mortar were frequently used to repair as well. As Soil-Stone Wall was transformed from irregular pattern-construction to comb pattern-construction and wet-construction was changed to dry-construction, it caused landscape and structural problems. Also, the layer of cement mortar applied to wall-foundation blocked the flow of rainwater that was induced by dry-construction of natural stones. Third, the study regarded that the problem with the repair of 'Old Wall' may occur as it is located in living space, because the owner of the wall could repair for the minor damages without technical knowledge. In addition, it is difficult for repair companies in charge of maintenance of Cultural Heritage to supply local materials, and it is differential construction specifications are not applied.

Evaluation on the Structural Performance and Economics of Ultra-high Performance Concrete Precast Bridges Considering the Construction Environment in North Korea (북한 건설환경을 고려한 초고성능 콘크리트 프리캐스트 교량의 구조성능 및 경제성 평가)

  • Kim, Kyoung-Chul;Koh, Kyung-Taek;Son, Min-Su;Ryu, Gum-Sung;Kang, Jae-Yoon
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.2
    • /
    • pp.208-215
    • /
    • 2021
  • In this study, a customiz ed bridge system was developed for North Korea application. For the application of North Korea, the customized bridge system design, fabrication, and construction performance evaluation were performed using ultra-high performance concrete a compressive strength 120MPa or more and a direct tensile strength 7MPa or more. The comparison of the North Korean truck luggage load(30, 40, 55) and the Korean standard KL-510 load showed that cross-section increased as the load increased. Furthermore, a bridge with a span length of 30m was fabricated with ultra-high performance concrete for the construction performance evaluation. The evaluation of the load condition analysis was performed by a flexural test. The results showed that a bridge with a span length of 30m secured about 167% of sectional performance under initial cracking load conditions and about 134% of load bearing capacity under ultimate load conditions. As a result of economic analysis, the customized bridge system using ultra-high-performance concrete was less than about 11% of the upper construction cost compared to the steel composite girder bridge. Therefore, these results suggest that the price competitiveness can be secured when applying the ultra-high-performance concrete long-span bridge developed through this study.

A Study on Change Orders in Overseas Construction using Feature Selection - Focus on Plant Construction in the Middle East - (Feature Selection을 활용한 해외 건설의 공사변경 관리에 관한 연구 - 중동 플랜트 건설프로젝트를 중심으로 -)

  • Hong, Sunyoung;Yeom, Chunho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.63-71
    • /
    • 2021
  • This paper looks into how to enhance construction project management, focusing on the change order, which is often considered one of the major causes for construction delays, disputes, and claims in the middle east construction. First, this paper categorizes the major causes of change orders. It suggests a detailed classification standard for affecting factors resulting from change orders based on a case study result of an on-going construction project in the Middle East. In particular, this paper presents a method to apply a machine learning-based feature selection to quantify the importance of change order triggers and affecting factors. As a result, the case study identifies six major change order triggers and eight affecting factors. Also, a meaningful relationship between change order triggers and affecting factors by each category is presented. This paper will contribute to setting a clear guideline for change order management for the international plant construction field while helping prevent construction delays and cost run-ups by reducing the time required for change order resolution between project owners and contractors.

A Study on Minimizing of Condenser Pressure Loss according to the Temperature Rise of the Seawater for Korean Standard Coal-fired Power Plants (표준석탄화력 발전소 해수온도 상승에 따른 복수기 압력 손실 최소화 방안)

  • An, Hyo-Yoel;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.11 no.2
    • /
    • pp.45-51
    • /
    • 2015
  • In this paper, studied condenser operating management which is affecting power plants efficiency considering the cost of poor quality. Sea water temperature and condenser pressure have clear correlation in S power plants. As the sea water temperature changes, condenser pressure changed -1.7~+20 mmHg from design condenser pressure(38.1 mmHg). Use the heat rate correction curve from manufactory company, realized that efficiency and cost of poor quality changed 0.0201%, 12,830 won/h at Unit #1,2 but 0.0155%, 9,832 won/h when condenser pressure 1 mmHg rise. Also, checked that it is changed depend on seasonal corresponding operation, plant ageing and the point of preventive maintenance like overhaul maintenance. This study said if we considered complying with management range and planning overhaul maintenance, then it could help reducing operating maintenance losses minimum 2.5 billion won per 1 year (case : Unit #1, forty days maintenance).

  • PDF