• 제목/요약/키워드: Construction Standard

Search Result 3,407, Processing Time 0.043 seconds

A Study on the methodology of applying the CALS/EC Construction Drawing Information Exchange Standard(STEP) in Design Fields (CALS/EC 건설도면 정보교환 표준(STEP)의 설계분야 적용 방안에 관한 연구)

  • Kim In-han;Choi Jung-sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.163-168
    • /
    • 2001
  • In the domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To solve the problems effectively, it is necessary to apply STEP standard that is international standard and standard technology for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to solve problems which occur to the current construction drawing information exchanging and sharing practice. The domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In result, a methodology of applying the STEP standard has been suggested. In addition, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

A STUDY ON THE CLASSIFICATION OF OWNER'S STANDARD SPECIFICATIONS

  • Jai-Dong Koo;Tae-Song Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1158-1164
    • /
    • 2005
  • This study suggests how to classify owner's standard specifications in organizations such as local governments which place an order for constructing general and various types of facilities. And the principal conclusions of this study can be summarized as follows; first, the Standard Specifications for Seoul Metropolitan Government of for all facilities could be integrated by seven individual works. Second, it is advisable from a viewpoint of long term to draw up integrally owner's standard specifications by trade for facilities, rather than draw up by group of facilities. Third, editing integrated standard specifications for all trades to meet the unified work classification structure should be backed up by high technology, therefore owner's standard specifications by trades would be favorable to our situation.

  • PDF

Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

Improvement of Emissions from Diesel Engine according to the Korean Standard Test Cycle in the Construction Equipment (건설기계용 엔진의 국내 표준시험모드에 따른 배출가스 특성 및 개선)

  • Joo, Taeheun;Yu, Seunghun;Lee, Chang-Eon
    • Journal of the Korean Society of Combustion
    • /
    • v.19 no.4
    • /
    • pp.42-48
    • /
    • 2014
  • The emission standard of diesel engine on the construction equipment has been rapidly enhanced in advanced countries, because most of air pollutions was caused by construction equipment. So, all of the construction equipments will be tested for emission with standard measurement mode. But, the standard measurement mode of construction equipment is different for non-road and one for the road in korea. This study was conducted to measure emission characteristics of the construction equipment with changed standard measurement mode and to improvement the emissions experimentally.

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Establishment of Standard Construction Process of the Infill Modular Construction System (인필 모듈러 건설시스템의 표준 시공프로세스 구축)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.245-246
    • /
    • 2012
  • Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.

  • PDF

Operation Plan of the Certification System for the Construction Information Standard -From the Construction CALS Standard- (건설사업정보 표준 인증을 위한 운영방안 마련 -건설CALS 표준의 관점에서-)

  • Moon, Jin-Seok;Won, Ji-Sun
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.12
    • /
    • pp.459-470
    • /
    • 2012
  • Information technical dependence degree is coming to be high from constructive information-oriented field. The size and complexity of constructive information are increasing and consequently, the standard for a construction information resource management becomes important. Currently the certification about construction information standard is being enforced part system and information-oriented level etc. from domestic. So we have a plan which will propel the diffusion strategy for the practical application of constructive information standard with introduction of the certification system about construction information standard. For a certification system preparation, we studied a feature and definition about construction information standard and analyzed domestic and foreign case. From that, we accomplished a classification and an analysis about construction information standard becomes the object of certification. And then, we selected the object of the certification through deriving necessities of certification about each construction information standard and considering the priority at the time of introduction. Finally we suggested an certification institutional operation plan about the object which is selected. Held a consultation meeting about the fact where the professional knowledge or technique is demanded and established secured directivity about authentication institutional operation plan and professionalism.