• Title/Summary/Keyword: Construction Standard

Search Result 3,420, Processing Time 0.036 seconds

A Fundamental Study on the Establishment of Restriction Standard of Construction Noise -Focused on the Classification of Construction Noise- (건설소음 규제기준 설정을 위한 기초적 연구 -건설소음의 유형화를 중심으로-)

  • 곽광수;김재수
    • Journal of the Korean housing association
    • /
    • v.12 no.3
    • /
    • pp.149-156
    • /
    • 2001
  • Recently, with the increase of income level, many people desire to have agreeable and quiet surrounding. However, construction noise has caused much annoyance for a number of dwellers and workers in nearby construction field. It has become a very serious issue in our living environment. For the accurate evaluation of construction noise with various frequency spectrums and fluctuation characteristics, the evaluation system should reflect not only physical quantities but also the psychological respects of individual persons. With preceding study of psycho-acoustical experiments, this study attempts to survey the classification of adjectives and sound using the method of selected description and intends to get the basic data for establishment of a standard about construction noise.

  • PDF

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Study on the Standard Specification of Linear Induction Motor Type Light Rail Vehicle Electrical Equipment (선형유도모터형식 경전철 전기장치 표준사양 연구)

  • Cho, Hong-Shik;Lee, Ho-Yong;Cho, Bong-Kwan;Hong, Jai-Sung;Ryu, Sang-Whan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1181-1182
    • /
    • 2007
  • Light Rail Transit (LRT) System is an urban transit system which has approximately an intermediate transportation capacity between conventional subway and bus ($5,000{\sim}25,000$ persons per hour and per direction). It is a high-tech system which operational capacity, punctuality and mobility are remarkably improved. There are some types of LRT systems such as monorail, tramway, AGT(Automated Guideway Transit), and so on. The LRT systems have been applied and being operated in about a hundred lines around the world and many projects that apply the LRT systems in Korea are being proceeded and scheduled. For the efficient management, economical construction, and safe operation of various LRT systems, the establishment of national standard is necessary such as vehicle standardized specification, vehicle performance test standard, vehicle safety standard, construction guide, operation regulation, etc. of LRT systems. This paper presents the standard specification of electrical equipment of linear induction motor type light rail vehicle, that is LIM AGT(AGT system propelled with linear induction motor) vehicle. The LIM AGT system has been applied in Japan subway and ART(Advanced Rapid Transit) system of Canada and Yongin LRT is currently under construction.

  • PDF

A Study on Improvement and Change Properties of Landscape Construction Standard Specification - Focused on Planting - (조경공사 표준시방서 변화특성과 개선방향 연구 - 식재공사를 중심으로 -)

  • Yu, Joo-Eun;Jun, Jin-Wan;Lee, Sang-Suk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.60-70
    • /
    • 2013
  • This study focused on analyzing classification system, technique methods, quality levels of periodic amendment characteristics in planting of standard specification. Through analyzing the above and comparing with foreign case study, this study suggests the improvement directions. The results improvement directions are as follows. 1. Many kinds of new construction were set up through the amendments of Landscape Standard Specification, but there are still needs to combine some construction categories because of mismatches between upper and lower categories. 2. Although the Landscape Standard Specification was revised to be more concrete, the contents there remains an ambiguous expression. So, standard specification is needed to revise a depth of earth ball or strength of support materials and quantify collect period of topsoil and application time. In addition, standards about following supervisor's instruction should be more detailed or deleted. 3. The standard specification has not been specified despite enactment and amendments reflecting the periodical paradigm and the needs of users, so it is still needed to revise. In addition, quality levels, planting periods, size of earth ball and performance criteria of tree materials are needed to revise. Each specific classification and construction methods were made by amendments of standard specification, but some standards are not clear and concrete. Therefore, the standard specification is needed to revise the classification system, technique methods, and problem deduction of quality levels and proposal of improvement. This study will be reference material when Landscape Standard Specification is revised.

Information Constitution of Daily Job-Site Report for Specialty Contractors (전문건설업체 작업일보의 정보구성에 관한 연구)

  • Lee, Kang-Min;Shin, Won-Sang;Lee, Dong-Eun;Kim, Dae-Young;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.279-280
    • /
    • 2012
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is questionable if the reliability and/or authenticity of the system is acceptable due to the lack of consistent enactment and/or revision procedures. This study identifies informational conditions and issues relative to using daily work report as a data collection method for enacting and/or revising CSPU system, and establishes the measures for improving the daily work report. This study aims on the information constitution of daily job-site report, daily manpower report, wages register for specialty contractors. According to the research results, most of necessary data were included in a daily job-site report. In conclusion, it is investigated that data of daily manpower report and wage register need to be included in a daily job-site report for understanding the current state of worker in the future.

  • PDF

A Study on Developing the Outcome Management System of Construction and Transportation R&D Project (건설교통R&D 사업의 성과관리체계에 관한 연구)

  • Jung, Si-Kyo;Moon, Dae-Seop;Maeng, Hee-Young
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.967-973
    • /
    • 2009
  • Construction and Transportation R&D budget is increased every year. Therefore, outcome is important issue. Also, we must try for practical use of outcome. And we need strategy for practical use of outcome. This is research for the application of research and development outcome. Specially, this research studies about way for construction standard. And this proposes a institutional improvement. First, it catch a problem point with present condition analysis. Second, It executes a survey and analysis. Finally it presents some policy suggestion. This research solves two problems. This applies to the field of research and development outcome. Another this amend construction standard.

A Study on the Classification System for Design DB(Database) (디자인 DB(database)에 있어서 분류체계에 관한 연구)

  • 유보현;김태균;홍석기
    • Archives of design research
    • /
    • v.13 no.1
    • /
    • pp.67-74
    • /
    • 2000
  • According to computer-based life style and computer networking system is generalized, the construction of information system based on the construction of database is one of the major jobs in the design field. The construction of standard database system is one of the major factors to build the information infra and develop design field as knowledge-base industry. However, the construction of user-based dassification of database is prior to that of standard design database system. This study presents the possibility of the construction of user-friendly and standard database system by studying the dassification system of database.

  • PDF

A Development of a Framework Cost Estimation Model for the Digital Document Database Construction Projects (지식정보 구축 대가의 개발 : 국가직무표준(National Competency Standards)과의 통합 방안을 중심으로)

  • Kim, Sojung Lucia;Seo, Yong Won;Son, Young-ho
    • Journal of Information Technology Services
    • /
    • v.16 no.3
    • /
    • pp.47-65
    • /
    • 2017
  • The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.