• 제목/요약/키워드: Construction Stage Analysis

검색결과 927건 처리시간 0.032초

광양항 동측배후단지 2단계 사업지구 상징공원 및 수변공원 설계 (A Design for the Symbol Park and the Waterfront Park for the Second Stage Development in the Eastern Rear Complex of Gwangyang Harbor)

  • 홍형순;김도경;정한호
    • 한국조경학회지
    • /
    • 제34권3호
    • /
    • pp.104-119
    • /
    • 2006
  • The eastern rear business complex of the Gwangyang Harbor (second stage) has undergone the 'alternative bid' process by which a construction company is selected based on their suggestions for an alternative plan and the bid for the construction expenses is based on the previously completed original plan, thereby implicitly accepting the arrangement and scale of the park which was presented in the original plan. It is possible, however, that the concept and plan of each park needs to be approached in a new way within the extent of given design guidelines. This study focuses on the alternative plan process and the Symbol Park (the second neighborhood park) and Waterfront Park (the third neighborhood park) among the five neighborhood parks in the eastern rear business complex (second stage). These two parks provide scale and function for the structure of the park and greenways system at the eastern rear complex. The neighboring waterway is a significant resource for emphasizing the pre-development features of the site. The alternative plan process focuses on determining the resources for the park's plan based on the environmental analyses of the site and utilizing the results. That is, through an analysis of the current state, all available resources are determined and the facilities and activities are derived based on these results. By this, Symbol Park and Waterfront Park reflect the regional features of the eastern rear complex, and these parks will feasibly perform the role of the region's key parte. The limit of this study is the fact that there is no chance for landscape architecture to actively play a role in the creation of the master plan, land utilization plan, and plan for the complex. Therefore there is a problem that the function scale and location of the park are not distributed appropriately in the rear complex. Also the plan for protecting the waterway's shore, a significant resource, only considers the structural stability of the engineering works, degrading the visual and ecological quality. These experiences will be used as a case for further designing the industrial complex and for the resulting park plan.

강교량의 기획단계에서의 환경부하 평가 및 영향요인에 관한 연구 (Life Cycle Assessments and Effect Factors in the Planning Stage of Steel Bridge)

  • 전민영;경갑수;이성진;류성진
    • 한국강구조학회 논문집
    • /
    • 제28권1호
    • /
    • pp.13-22
    • /
    • 2016
  • 최근 들어 다양한 분야에서 환경오염에 대한 관심이 높아지고 있으며 환경부하를 산출하는 환경적합성평가방법인 전과정평가에 관한 연구는 현재 많이 진행되고 있다. 그러나 SOC 시설물은 다양한 자재, 공정과정을 거치기 때문에 환경에 많은 영향을 미칠 것으로 예상되나 아직까지는 환경오염에 대한 대책 및 연구가 부족한 것으로 판단된다. 본 연구에서는 2000년 이후 설계된 204개 강교에 대한 데이터를 구축하였으며, 그 중 100개 교량을 대상으로 기획단계에서의 전과정평가를 실시하여 환경부하량을 산출하였다. 또한 강교에 대한 표준 공종 분류체계를 정립하였고, 이를 바탕으로 교량의 기본 설계 자료와 투입자재에 LCI DB를 적용하여 소요자재별 환경부하량을 산정하고 이를 Eco-point 값으로 나타내었다. 본 연구에서 도출된 환경부하량은 향후 강교의 설계에서 전과정평가 과정에 대한 기초자료로서 활용될 수 있을 것으로 판단된다.

대절토부 사면의 패널식 옹벽보강에 따른 안정성 검토 (A Study on the Stability of Slopes Reinforced with Panel-Type Retaining Walls)

  • 최동욱;박준오;김대현
    • 한국지반신소재학회논문집
    • /
    • 제23권2호
    • /
    • pp.1-7
    • /
    • 2024
  • 대절토사면 안정성 확보를 위한 보강공법에 대한 다양한 신기술, 신공법이 적용되고 있지만 현장 지반정수 고려에 대한 설계적 한계가 존재하여 실제 시공 시 설계와 현장 지반 조건이 상이한 결과가 발생하고 있다. 본 연구대상지역인 여수시 일원에 있는 옹벽의 경우 5단계 옹벽 시공예정중이나, 현재 2단계 시공완료 시점에서 옹벽 상부의 균열, 옹벽전면의 침하 및 우수 유출등이 확인되었다. 1, 2단계 옹벽 시공 완료후, 발생된 옹벽 상부의 균열 및 침하와 옹벽 전면의 우수 유출에 대한 문제점을 발견하고 기존 안정성 검토의 결과를 재검토하고자 하였다. 기존 설계단계에서 붕적층에 대한 명확한 검토가 이루어지지 않아 지하수 유출로 인한 문제임을 확인하였으며, 이에 지하수위 조건을 보수적으로 반영하고자 옹벽 최상부에 지하수위선을 위치시켜 사면에 대한 안정성검토를 수행하였다. 검토결과, 우기시 안전율은 1.31로 기준안전율 1.3을 상회하는 결과를 확인하였으나, 지진시 안전율이 1.12로 기준안전율 1.3을 만족하지 못하는 것으로 확인되었다. 이에 기존 1, 2단 시공된 옹벽은 그라우팅을 이용한 마이크로 파일과 같은 보강공법을 적용하고, 붕적층에 대한 명확한 검토 수행수 추가 공사가 이루어져야할 것으로 사료된다.

감쇠를 포함한 유한요소 모형의 개선 (Updating of Finite Element Models Including Damping)

  • 이건명;주영호;박문수
    • 한국소음진동공학회논문집
    • /
    • 제22권12호
    • /
    • pp.1243-1249
    • /
    • 2012
  • 이 논문에서 유한요소 모형은 2단계로 개선된다. 첫 단계에서는 감쇠를 무시하고, 최적화 방법을 사용하여 유한요소 모형의 질량행렬과 강성행렬을 개선한다. 최적화를 위한 목적함수는 모드시험 데이터와 유한요소해석으로부터 구한 고유진동수와 진동형으로 이루어져 있다. 두 번째 단계에서는 첫 단계에서 구한 질량행렬과 강성행렬을 고정시키고, 감쇠를 고려한다. 먼저 비례감쇠를 가정하고 감쇠행렬을 추정한 다음, 해석적인 주파수응답함수와 측정한 주파수응답함수의 차가 최소가 되도록 최적화 과정을 이용하여 감쇠행렬을 조정한다. 이와 같은 모형개선 방법을 시뮬레이션 계와 실제 외팔보에 적용하였다.

파쇄대가 과대분포한 암반지역에서 터널의 거동특성에 관한 연구 (Analysis on the tunnel behavior characteristic in the excessive fractured zone distribution of rock area)

  • 박재원;이승호
    • 한국터널지하공간학회 논문집
    • /
    • 제18권4호
    • /
    • pp.341-354
    • /
    • 2016
  • 본 논문은 설계단계에서 지반조사와 수치해석을 통해 예측된 터널의 거동특성과 실제 시공단계에서 어떠한 변형특성을 보이고 있는지 RMR 및 계측데이터의 비교분석을 통해 선정된 터널지보시스템의 선택적 적용을 보여준다. 이는 파쇄대가 과대분포한 암반지역에 터널을 설치할 경우, 터널굴착지반의 거동은 지반의 특성과 보강공법 등의 영향에 따라 상이한 거동특성 때문이다. 그러므로, 본 연구에서는 지반설계자가 단층대 및 파쇄대가 과대 분포한 암반지역의 터널 설계시, RMR-계측 데이터 분석과 지반물성치 저감에 따른 매개변수 분석을 비교하여, 지반 설계자가 향후 유사한 파쇄대가 과대분포한 지역의 터널거동특성을 예측할 수 있도록 하고자 한다.

Health assessment of RC building subjected to ambient excitation : Strategy and application

  • Mehboob, Saqib;Khan, Qaiser Uz Zaman;Ahmad, Sohaib;Anwar, Syed M.
    • Earthquakes and Structures
    • /
    • 제22권2호
    • /
    • pp.185-201
    • /
    • 2022
  • Structural Health Monitoring (SHM) is used to provide reliable information about the structure's integrity in near realtime following extreme incidents such as earthquakes, considering the inevitable aging and degradation that occurs in operating environments. This paper experimentally investigates an integrated wireless sensor network (Wi-SN) based monitoring technique for damage detection in concrete structures. An effective SHM technique can be used to detect potential structural damage based on post-earthquake data. Two novel methods are proposed for damage detection in reinforced concrete (RC) building structures including: (i) Jerk Energy Method (JEM), which is based on time-domain analysis, and (ii) Modal Contributing Parameter (MCP), which is based on frequency-domain analysis. Wireless accelerometer sensors are installed at each story level to monitor the dynamic responses from the building structure. Prior knowledge of the initial state (immediately after construction) of the structure is not required in these methods. Proposed methods only use responses recorded during ambient vibration state (i.e., operational state) to estimate the damage index. Herein, the experimental studies serve as an illustration of the procedures. In particular, (i) a 3-story shear-type steel frame model is analyzed for several damage scenarios and (ii) 2-story RC scaled down (at 1/6th) building models, simulated and verified under experimental tests on a shaking table. As a result, in addition to the usual benefits like system adaptability, and cost-effectiveness, the proposed sensing system does not require a cluster of sensors. The spatial information in the real-time recorded data is used in global damage identification stage of SHM. Whereas in next stage of SHM, the damage is detected at the story level. Experimental results also show the efficiency and superior performance of the proposed measuring techniques.

하천수위표지점에서 신경망기법을 이용한 홍수위의 예측 (The Flood Water Stage Prediction based on Neural Networks Method in Stream Gauge Station)

  • 김성원;호세살라스
    • 한국수자원학회논문집
    • /
    • 제33권2호
    • /
    • pp.247-262
    • /
    • 2000
  • 본 연구에서는 낙동강유역의 주요 수위표지점중 진동수위표지점에서 홍수위를 예측하기위한 신경망모형인 WSANN모형이 제시되었다. WSANN모형은 모멘트방법, 초기조건의 개선 및 적응학습속도에 의해 보완되어진 개선된 역전파훈련 알고리즘을 이용하였고, 본 연구에 사용된 자료는 훈련자료와 테스팅자료로 분할하였으며, 최적 은닉층 노드수를 결정하기 위하여 은닉층노드와 임계학습횟수로부터 경험식이 유도되었다. 그리고 WSANN모형의 보정은 4개의 훈련자료에 의해 실시되었으며, WSANN22와 WSANN32모형이 모델의 검증에 사용될 최적모형으로 결정되었다. 모형의 검증은 훈련되지 않은 2개의 테스팅자료를 이용하여 모형의 적합성을 평가하기 위하여 이루어 졌으며, 통계분석의 결과를 통하여 홍수위를 합리적으로 예측하는 것으로 나타났다. 따라서 본 연구의 결과를 기본으로 신경망기법을 이용한 실시간 홍수예경보 시스템의 구축 및 홍수위의 제어에 관한 지속적인 연구가 필요것으로 사료된다.

  • PDF

충주댐 방류에 따른 댐 상하류 홍수위 영향 분석 (Effect of Chungju Dam Operation for Flood Control in the Upper Han River)

  • 김상호;김지성
    • 대한토목학회논문집
    • /
    • 제33권2호
    • /
    • pp.537-548
    • /
    • 2013
  • 본 연구에서는 2006년 홍수시 충주댐 운영에 따른 댐 상 하류의 홍수위 상승영향을 정량적으로 분석하기 위하여 팔당댐 상류의 한강 본류에 위치한 충주댐을 기준으로 상류구간과 하류구간으로 구분하고, 1995년부터 2008년까지의 홍수사상을 대상으로 모형을 검보정함으로써 수리학적 모형을 구축하였다. 구축된 모형을 이용하여 충주댐의 유무를 가정하여 충주댐의 홍수조절효과를 검토하고, 방류량의 변화에 따른 상 하류 주요지점의 수위 상승영향을 정량적으로 분석하였다. 분석결과, 2006년 홍수시 충주댐의 운영이 비교적 적절하게 수행되었음을 확인하였으나, 충주댐의 홍수조절효과는 댐 하류구간에 집중되어 있어 댐 상류 홍수피해 저감을 위한 제도적 보완이 필요한 것으로 분석되었다. 이러한 문제점을 해결하기 위하여 기존 댐 배수구간 상류 하천의 기점수위 결정방법의 한계를 검토하였으며, 댐 배수구간과 상류 하천의 계획홍수량 불연속을 반영할 수 있는 기점수위 결정방법을 제안하였다. 제안된 방법은 댐 상류하천의 홍수피해 저감을 위한 설계 및 홍수피해 발생시 피해원인 분석에 활용될 수 있을 것이다.

미국의 공공공사 설계변경조항 해석동향 연구 (A Study on the Interpretation for Change Order Clause of USA Government Contract)

  • 조영준
    • 한국건축시공학회지
    • /
    • 제9권5호
    • /
    • pp.103-110
    • /
    • 2009
  • 건설사업계약은 매우 다양한 계약으로 구성되어 있다. 그리고 이는 일의 완성을 필요로 하는 도급계약의 일종이다. 따라서 당사자들은 계약의 이행과정중에 항상 많은 분쟁에 봉착하게 된다. 실제로 발주자의 지시에 의한 설계변경으로 인해 많은 분쟁이 발생하고 있다. 이러한 분쟁을 해결하기 위해서는 계약의 해석이 수반되어야 하지만, 우리나라에서는 종국적으로 분쟁을 해결하게 하는 분쟁해결절차가 중재와 소송에 국한되어 있으므로 계약당사자들이 비효율성으로 인해 이를 꺼리게 되는 실정이다. 따라서 우리나라에서는 계약의 해석을 찾아보기는 쉽지 않은 반면, 미국의 경우 발주자별로 분쟁해결절차를 둠으로써 다양한 계약의 해석유형을 찾아볼 수 있다. 따라서 본 연구에서는 과업의 범위를 초과하는 변경, 수량의 변경, 이행기간의 변경, 이행방법과 태도의 변경, 정부제공물품이나 인도장소의 변경, 시공자의 변경절차 수용, 감액조정에 대한 사항에 대한 해석동향을 분석하여 제시하였다.

현장실측에 의한 조도계수 산정의 불확실도 평가 (Uncertainty Analysis in Estimation of Roughness Coefficient Using the Field Measurement Data)

  • 김지성;이찬주;김원
    • 한국수자원학회논문집
    • /
    • 제40권10호
    • /
    • pp.801-810
    • /
    • 2007
  • 본 연구에서는 현장에서 실측된 유량 및 수위로부터 산정된 조도계수의 오차를 분석하고 그 타당성과 한계를 검토하였다. 자연 하천흐름을 등류로 가정하여 산정된 조도계수는 저유량 규모에서 부등류로 계산된 조도계수와 큰 차이를 나타내었으며, 이는 속도수두의 차이보다 평균 단면적, 동수반경 등 단면정보에 크게 영향을 받았다. 상대적으로 긴 구간에서 홍수량 규모의 평균 조도계수 산정에서는 구간 상하류만의 수위 자료를 이용하여 조도계수를 산정하는 수정 Newton-Raphson 방법이 구간 내 다수의 실측 수위로 산정된 평균 조도계수와 비교하여 효율적이고 정확한 해를 제공하였다. 현장 실측으로 조도계수를 산정할 경우, 수위 및 유량 측정오차로 인하여 홍수기보다 저유량 규모에서 산정된 조도계수의 불확실도가 증가되지만 이로 인하여 발생되는 수심 및 유속의 불확실도는 유량규모와 무관하게 5% 내외의 유사한 결과가 나타남으로써 실측 수위를 이용한 조도계수 산정의 타당성을 확인하였다.