Journal of the Korean Professional Engineers Association
/
v.34
no.1
/
pp.53-58
/
2001
Value Engineering (VE) is an organized process with an impressive history of improving value and quality. VE can be applied to the construction projects with having good study results. The VE study in construction projects gives identification of opportunities to remove unnecessary costs while assuring quality, performance, reliability, and other factors will meet or exceed the clients needs. VE techniques can save money, reduce time, and improve quality, reliability, maintainability, and performance. VE can also make improving of human factors (altitudes, creativity), and team work. According to the results of VE study in recent USA, 5∼35% reduction in initial costs have been made for the construction projects (ROI ranges : 100∼1000). To have successful work results, if possible, VE study shall be considered at project planning stage or basic design stage later than field work stage with application of VE JOB PLAN, multi-disciplinary approach, and proper techniques in respective study phases (pre-workshop / information gathering / function analysis / creativity / judgement and evaluation / development / presentation and implementation) among the detail techniques in many.
Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.6
/
pp.559-566
/
2017
This paper proposes a new composite deckplate system reinforced with inverted triangular truss girders(called 'D Deck'), which does not require the use of temporary supports at construction stage. The proposed system retains increased stiffness and strength while keeping the absolute floor height change to a minimum level and can be utilized as floor systems of various types beam members such as the conventional wide-flange and U-shaped composite beams. In order to evaluate the performance of the proposed system, five specimens with a span of 5.5 m were fabricated and tested under field loading conditions consisting of several intermediate steps. The load-deflection curves of each specimen were plotted and compared with the nonlinear three-dimensional finite element analysis results. The comparison showed that the effective load sharing between the truss girders and floor deck occurs and the maximum deflection under construction stage loading is well below the limit estimated by the provisions in Korea Building Code.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.1B
/
pp.13-21
/
2010
In recent, we have a growing interest in the washland construction as a measure of flood control and as a wetland with ecological function in the river. This study performed the flood control analysis and investigated the ecological effect for washland construction plan in Topyoung-cheon basin in Changyeong-gun, Gyeongnam. Several cases were considered for the washland construction on Topyoung-cheon basin, and we analyzed flood stage reduction and flood inundation for each case. From the result of flood control analysis, we found some significant results according to the combination of each washland case. We also found that the washland construction gave the positive results in biodiversity. Therefore, it will be desirable to consider various effects such as flood control, ecological aspects, and so on for the washland construction.
Journal of the Korean Society of Industry Convergence
/
v.23
no.2_2
/
pp.289-299
/
2020
The composition of convergence cross-section of the material is a technique that provides reasonable design and construction of structures. It is frequently used in medium-sized bridges and architectural structures. However, the structural behavioral spare capacity enhancement of the structure by the application of the convergence cross-section is still limited by the expandability due to the limiting state of each material. In order to overcome these limitations, this study reasonably analyzed the construction stages before and after the convergence cross-section constructed and developed a technique for forming multi-point boundary conditions using struts, which are compression members. Based on the existing cases, a reasonable construction step for forming the material composite section of the entire structural system of the structure was derived, and a numerical analysis model for a specific part was constructed to analyze the behavior of the strut application. As a result of this study, the effect of reducing the sectional force of 7.40% in beam-column joint and 6.31% in the center of girder was derived, and the deflection, which is a measure of the serviceability of the structure, improved by 54.41% from the installation and dismantling of strut members at each construction stage.
In this study, a process is proposed to calculate analytical correction values for the vertical shortening of all columns on all floors in a high-rise building that minimizes the error between the structural analysis predictions and values measured during construction. The weight ratio and the most probable value were accordingly considered based on the properties of the shortening value analyzed at several points in each construction stage and the distance between these measured points and unmeasured points at which the shortening was predicted. The effective range and shortening value normalization were considered using the column grouping concept. These tools were applied to calculate the error ratio between the predicted and measured values on a floor where a measured point exists, and then determine the estimated error ratio and estimated error value for the unmeasured point using this error ratio. At points on a floor where no measured point exists, the estimated error ratio and the estimated error value were calculated by applying the most probable value considering the weight ratio for the nearest floor where measured points exist. In this manner, the error values and estimated error values can be determined at all points in a structure. Then, the analytical correction value, defined as this error or estimated error value, was applied by adding it to the predicted value. Finally, the adequacy of the proposed correction method was verified against measurements by applying the analytical corrections to all unmeasured points based on the points where the measurement exists.
Proceedings of the Computational Structural Engineering Institute Conference
/
1991.10a
/
pp.127-132
/
1991
The purpose of this study is to integrate a structural design Process of framed steel structures. It is composed of analysis, design, drafting and construction management. However each step of these works involved with a large amount of data and man hour resources. The aim of this study is to alleviate time consuming efforts mentioned above by integrating the different stage of works. Very successful results have been achieved by setting up a common database in whole process and applying the techniques of knowledge base system.
When the existing polder levee was constructed, the river's numerical analysis decided the bank raise by applying the planned flood stage or by using the result from the sectional 1st dimensional numerical analysis. But, it was presented that there is a limitation in the 1st dimensional value analysis when the structure like the polder levee obstructs the special shaped running water flow. Therefore, in order to verify the numerical value applicability when the polder levee is constructed, this report compared each other through the 1st and 2nd dimensional numerical analysis and the mathematical principle model laboratory. In case of the polder levee construction through the numerical analysis and the mathematical principle model laboratory, it was decided that there was no big problem in the 1st dimensional numerical analysis applied design, considering the uncertainty of mathematical principle analysis though the first dimensional numerical analysis was calculated a little bigger than the second. But, after construction, it was found that the water level deviation of the 1st, 2nd occurred biggest at the place where the flow was divided into two. Also, as a result of comparing the 1st, 2nd dimensional numerical analysis with the mathematical principle model laboratory, it was confirmed that the 1st numerical analysis applied design decreased the modal safety largely, as the left side water level was calculated smaller more than 0.5m in case of the 1st dimensional numerical analysis.
Transactions of The Korea Fluid Power Systems Society
/
v.7
no.1
/
pp.20-27
/
2010
Electromagnetic control valves have been used for almost 20 years. As the solenoid modulating technology advances, its applications are extending to various industrial fields such as nuclear and fossil fuel power plants, chemical plants and refineries. Proportional solenoid valve for large flow control is designed with two-stage configuration to meet the required actuating force on the main disc and its position is stabilized by the self-controlled system. In this research, main disc dynamics is analyzed with linearized system model which is derived from the mathematical equations describing its nonlinear behavior. Major design parameters of the valve control system that affect the response and stability are also studied with root locus method. The linear dynamic analysis results are verified with simulations in time-domain.
Proceedings of the Korean Geotechical Society Conference
/
2006.03a
/
pp.824-827
/
2006
The Prefabricated Vertical Drains (PVDs) method is one of the most widely used techniques to accelerate the consolidation process in-situ and hence increase its bearing capacity. In this paper, the degree of consolidation incorporated with PVDs was evaluated in O construction work site which composed with dredged soil. O Program PVD(Version 2.3) which developed by Asian Institute of Technology was used. The purpose of this analysis is efficiently to estimate the degree of consolidation by analyzing the surface settlement with time, and drainage at initial stage and final stage by using design-parameter which based on the in-situ tests and laboratory tests. This result can be compared with analysis of the degree of consolidation using Program PVD(Version 2.3) and the field observed data in the future studies.
Korea has relied on top down development method, in which companies, research and education institutions move into the industrial complexes established by the government. However, to improve local competitiveness, the paradigm is shifting from the government initiated industrial complex to the clusters based on the cooperative network of the region. Representative case is 'Samcheok-si Fire & Emergency industry cluster construction project' that begun in 2007. AHP technique analysis results on first-stage showed that priority was on policy and network elements, and the results of second-stage analysis show that priority was on Policy incentives to internationalize the cluster and strengthen link,. Cluster branding, Sharing of organizational culture to cope with changes in environment, Creation of group learning culture. The subject of this research is limited to Samcheok-si's the Fire and Emergency Industry cluster formation project. Therefore, the research area and standard should be expanded to increase generality in further researches.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.