• Title/Summary/Keyword: Construction Sites

Search Result 2,315, Processing Time 0.024 seconds

Improving Qualification of Safety Manager at Construction Site (건설현장 안전관리자의 자격기준에 관한 연구)

  • Gal, Won-Mo;Son, Ki-Sang;Jeong, Se-Gyun;Choi, Jea-Nam
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.111-115
    • /
    • 2009
  • As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).

Main Problems and Suggestions on Occupational Safety and Hygiene in Construction Sites (건설현장의 안전보건 주요 현안과 개선 방안)

  • Shim, Gyubeom
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.22 no.4
    • /
    • pp.329-336
    • /
    • 2012
  • Objectives: The aim of this study is to analyze main problems on occupational safety and hygiene in construction sites and to suggest some improvement methods. In order to decrease industrial accidents, I emphasize the approach paradigm shifts according to characteristics of construction workers. Methods: Pointing out the irrationality of current institutions by comparing bad outcomes of occupational safety and hygiene in construction industry and characteristics of construction workers. Results: In order to decrease industrial accidents, we need some approach paradigm shifts; the supply method of industrial safety and health fundamentals on the construction industry level, the accident rate calculation by using the actual construction workforce instead of an estimation, institutionalizing the prevention efforts themselves for industrial accidents, securing enough production costs for the precondition of occupational safety and hygiene in construction sites. Conclusions: I ascertain the need of the approach paradigm shifts for decreasing industrial accidents in the construction industry.

A study on effects of the prevention of rush work of construction sites on human accidents (건설 현장 강행공사 방지가 인적사고에 미치는 영향에 관한 연구)

  • Lee, Sung-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.27-37
    • /
    • 2017
  • In the construction sites, rush (speedy construction) work have recently been overused because of budget reductions by reducing the construction duration after the long-term economic recession and construction business stagnation with institutional change including the instruction of the duration shortening bidding system and the introduction of the post-construction sales system by the Korea Research Institute for Human Settlements. Due to this, negligent accidents have frequently occurred by forcing manpower, equipment, finance, and material procurement and pressing ahead with impractical construction wok at night according to the reduction of construction schedules. Therefore, this paper has the necessity of this study to seek for alternatives to prevent negligent accidents by finding factors related to rush work in the reality that the importance for preventing negligent accidents is more emphasized while they have not been reduced in construction sites.

Technological Trends in Safety Solutions for Construction Equipment (건설장비의 안전 솔루션 기술 동향)

  • Yong Jin Kim;Myoung Kook Seo
    • Journal of Drive and Control
    • /
    • v.20 no.2
    • /
    • pp.7-14
    • /
    • 2023
  • Negative perceptions of the construction industry are prevalent due to the high accident rate at construction sites. Recently, with the gradual change of the perception in industrial safety, the demand for improving the safety level of construction sites has increased. Accordingly, the government is preparing various safety-level measures such as the Serious Disaster Punishment Act and support for industrial safety management costs. In addition, private industries are incorporating various safety equipment in the sites. This paper introduced the current status of safety sensors and solutions currently applied to construction equipment and industrial vehicles. The technology development direction suitable for construction equipment was introduced by comparing the operating environment of automobiles and construction equipment. and the need to develop performance standards to protect and revitalize the market for safety devices for construction equipment was suggested.

Application of artificial intelligence-based technologies to the construction sites (이미지 기반 인공지능을 활용한 현장 적용성 연구)

  • Na, Seunguk;Heo, Seokjae;Roh, Youngsook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.225-226
    • /
    • 2022
  • The construction industry, which has a labour-intensive and conservative nature, is exclusive to adopt new technologies. However, the construction industry is viably introducing the 4th Industrial Revolution technologies represented by artificial intelligence, Internet of Things, robotics and unmanned transportation to promote change into a smart industry. An image-based artificial intelligence technology is a field of computer vision technology that refers to machines mimicking human visual recognition of objects from pictures or videos. The purpose of this article is to explore image-based artificial intelligence technologies which would be able to apply to the construction sites. In this study, we show two examples which is one for a construction waste classification model and another for cast in-situ anchor bolts defection detection model. Image-based intelligence technologies would be used for various measurement, classification, and detection works that occur in the construction projects.

  • PDF

Research on eco-friendly construction management plan for construction site through waste fiber resource recycling technology (폐섬유 자원재활용 기술을 통한 건설현장 친환경 시공관리 방안에 관한 연구)

  • Kim, Dae-Geon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.45-46
    • /
    • 2022
  • Recently, it is necessary to establish an eco-friendly construction system through recycling of waste material management at construction sites. This is required to reflect the times that require a carbon reduction system in construction as part of domestic and overseas carbon dioxide reduction. Therefore, we intend to establish eco-friendly construction management as part of resource recycling and carbon reduction through recycling technology for waste fibers generated at construction sites.

  • PDF

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

Checklist Development for Prevention of Safety Accidents in Form Work in Small and Medium Sized Construction Sites (중소규모 건설현장의 거푸집 공사 안전사고 예방을 위한 체크리스트 개발)

  • Cho, Ye-Rim;Shin, Yoon-Seok;Shin, Jae-Kwon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.587-594
    • /
    • 2017
  • The construction industry generates the greatest number of disasters. Laborer injury at construction sites is mostly reported by small and mid-sized construction sites. Moreover, of the injuries, the greatest number is related to formwork. The objective of this study is to propose a checklist of the risk factors of formwork, in which industrial injuries occur most frequently in small and mid-sized construction sites, with which safety management can be done thoroughly. Risk factors and preventive measures are derived by analyzing 9,396 industrial disasters occurring at construction sites in Korea. The checklist drawn in this study was reviewed by five specialists in safety management, and applied to construction sites to verify its applicability. In a result, applying the checklist to the site showed that the safety management system of small and medium-sized construction sites were insufficient. It is expected to contribute to the effective safety management of small and mid-sized construction sites.

Comparative Analysis of the Environmental Management Cost in Building Construction Sites (건축공사 환경관리비 운영체계 비교 분석)

  • Koo, Jakon
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

Analysis of worker's Ageing in Small-size Construction Sites in Busan (부산지역 소규모 건설현장 근로자의 고령화 실태조사 및 개선방안)

  • Lee, Sang-Ho;Huh, Young-Ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.12
    • /
    • pp.51-56
    • /
    • 2018
  • Due to the aging of economically active population in the world, the average age of workers in the domestic construction industry is also steadily increasing. This study analyzes the aging of construction workers in small-size construction sites in Busan, where the aging of the economically active population is the most severe in Korea. As a result of the study on the aging of construction workers in six construction sites with a construction cost of less than 500 million won in Busan, it was found that 65% of the workers were over 50 years of age. In addition, several experts interviews and survey revealed that 'securing welfare facilities for construction workers' and 'diminishing prejudice about the construction industry" were the most urgent and effective methods to overcome the aging problems. The results of this study can be served as basic data to solve the aging problems in the industry.