International conference on construction engineering and project management
/
2013.01a
/
pp.231-234
/
2013
According to the recent development of USN technology, it has been applied in various fields of construction management. In particular, the concrete curing management using the wireless measurement system is actively being conducted. However, the existing method has limitations such as the reinstallation of temperature sensors and repositioning of repeaters. It is also not easy to acquire the measured data. Thus, this study focuses on the concrete curing management. This study proposes data acquisition method using the smartphone on construction site and tests applicability of the data measuring device and the smartphone. The test allows us to suggest the actual communication distance on construction site and to determine the correction value that is applied to the measured temperature. The data acquisition method proposed in this study is intended to enable appropriate management on construction site and will be able to be applied effectively to a variable construction site. It can also be used in all fields of construction management.
International conference on construction engineering and project management
/
2015.10a
/
pp.716-717
/
2015
A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.289-290
/
2021
The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.
International conference on construction engineering and project management
/
2022.06a
/
pp.1255-1255
/
2022
Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.
International conference on construction engineering and project management
/
2017.10a
/
pp.297-300
/
2017
Particulate Matter(PM) is one of the most critical pollutant which can cause a fatal disease if the human body inhales. Construction is the business that emits the most fugitive dust. It is therefore necessary to manage construction site. South korea government focuses on the fugitive dust control measures defined in regulation being implemented properly. However the number of civil complaints related to fugitive dust emitted from construction site is the most in korea. So it is necessary to check from the management system aspect. This paper compares and analyzes the fugitive dust management system which applied to the construction site of major cities in three countries, and finds out what needs to be supplemented by the domestic management system.
The objectives of this study is to develop evaluation indicators for the quantitative evaluation of construction safety culture level in order to prevent accidents by evaluating the level of safety culture and each safety culture elements of the construction site and to present the areas that should be focused on improvements. In this study, it was presented assessment indicators of the construction safety culture by analyzing previous studies for safety culture, by categorizing items as an important element of safety culture hierarchically and by reflecting the opinion of the construction site professional personnels using AHP analysis methodology. The assessment indicators of the construction safety culture were structured the details of the leadership, systems, and personal characteristics and derived weighted value by the pairwise comparison to quantify the detail assessment indicators in order to assess the construction safety culture level. This study presents a safety culture assessment indicators for the construction site to suggest directions for improving the construction site safety culture and prevent the accidents of the construction site by derived via a safety culture assessment of construction site.
In order to maintain and protect professionalism in color planning, the present study examined the process at the time of realization of color through color inspection and supervision in the actual construction site and suggested plans for improvement. Reflecting the characteristics that the governing body of the construction site is not a private person but an organization, the present study aims to provide institutional measures so that the supervisor of color construction at the actual site of construction can propose concerns related to proper construction at the right time, and the matters cannot be decided from the perspective of a layman. The institutional measures are proposed through the case of application of a process at the construction stage of the color planning at the construction site of Muju Taekwondo Park. First, the process clarified where the responsibility lies by specifying special conditions concerning color inspection on the field guide and color contract. Second, the sample for building materials was selected after obtaining it from a company capable of supply and is appropriate for the planned unit cost so that it could play an important role in realizing colors at the stage of basic design. Third, the process of construction was ensured not by temporary selection of colors but by continuous approval of colors in consideration of the conditions of construction site through letter of approval of color at each stage and point of time. Fourth, coordination of various color elements of other fields including landscape, interior, and electricity ensured construction of the whole structure in one color concept. Fifth, color inspection through the mock up of the site will minimize erroneous construction and reconstruction and prevent decrease in productivity. Sixth, this study also suggested more comfortable and positive color environment through evaluation by experts and users. The researcher of this study expects that color experts actively participate in the stage of construction to contribute to improvement of the color environment.
International conference on construction engineering and project management
/
2022.06a
/
pp.1209-1216
/
2022
The majority of construction site incidents occur due to a lack of hazard awareness among workers on job sites. This lack of awareness is despite mandatory construction safety training, typically in the form of written content (safety manuals) or of images depicting hazards. To reduce job-site injuries and fatalities, general contractors have started adopting Virtual Reality (VR) to impart safety training to job site personnel. VR safety training can take the form of an immersive simulation comprising potential safety hazards intentionally embedded into a virtual job site; users are required to identify these hazards within a specified time frame with the expectation that they will be more adept at recognizing hazards on an actual job-site, resulting in fewer accidents. This research study seeks to identify the actual impacts of VR on construction safety awareness among participants. The research addresses the following question: Does VR improve hazard recognition awareness? The primary objective is to evaluate participants' performance of past construction safety awareness against present construction safety awareness after receiving VR training. Participants were asked to complete a multiple-choice Qualtrics™ questionnaire. The results of the study showed a statistically significant knowledge gain advantage with respect to hazard recognition and construction safety awareness with the use of interactive, immersive VR over a more conventional and passive safety training method.
KSCE Journal of Civil and Environmental Engineering Research
/
v.42
no.4
/
pp.549-557
/
2022
Due to harsh conditions of construction site, understanding of current feature of terrain and other infrastructures is critical issue for site managers. However, because of difficulties in acquiring the geographical information of the construction sites such as large sites and limited capability of construction workers, comprehensive site investigation of current feature of construction site is not an easy task for construction managers. To address these circumstances of construction sites, this study deduce difficulties and applicabilities of unmanned aerial vehicle in the area of construction site management. To confirm applicability of UAV in civil construction project, case study have been conducted on the road construction project. The result of case study proved that the developed system is one of promising technologies that has been studied in construction site management. To improve applicability of UAV for construction and process management information, law and technical issues will be an important area of future study.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.265-266
/
2023
Recently, many disasters have occurred due to poor management of construction site. In addition, as legal regulations on safety management at construction sites are strengthened, its importance is being further emphasized. In relation to smart safety management technology, a study was introduced to build an analysis model through various safety-related data collected within construction companies. This model derives quantitative disaster risk about the site level through information related to past disasters and near misses. However, construction work is performed separately by work group of each partner company. There is a limitation in that individual workers cannot directly experience this analysis information. In this study, we propose a method to derive the safety disaster risk of individual work units from disaster risk of the site level. We expect that this study to be helpful for smart safety management technology of construction sites.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.