A Study on Proto-type Development of BIM based Architectural Construction Simulation System (BIM기반 건축시공 시뮬레이션 시스템 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.442-445
    • /
    • 2008
  • The purpose of this study is making Proto-type development of BIM based Architectural Construction Simulation System. This study suggest a new schedule access method for overcoming limitation of current Simulation Program focused on visualization. The method made from analysis of current Simulation Program. This program is based on Visual Basic .Net language.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

A Study on the development of Schedule based Architectural construction Simulation System (공정관리 프로세스 중심의 시뮬레이션 시스템 개발방향에 관한 연구)

  • Jo, Jin;Kim, Sun-Hyo;Park, Jong-Bae;Kwon, O-Cheol;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.353-356
    • /
    • 2007
  • The purpose of this study is to propose development of Schedule based Architectural Construction Simulation System. In this study (or paper), we analysis the simulation system concept ant) its characteristics, and analyze the main functions simulation system and the range of functions which are already used currently. Therefore, we could find the limit of the present simulation system. and propose more effective solutions to develop Schedule based Architectural Construction Simulation System.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

A Study on the development of 4D based Architectural construction Simulation System (4D 시스템 기반의 건축시공 시뮬레이션 개발 방향 - 공정 프로세스 중심으로 -)

  • Jo, Jin;Kwon, Gi-Bum;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.119-122
    • /
    • 2007
  • The purpose of this study is to propose development of Schedule based Architectural Construction Simulation System. In this study (or paper), It analyzes the simulation system concept and its characteristics, and analyze the main functions simulation system and the range of functions which are already used currently. Therefore, It could find the limit of the present simulation system, and propose more effective solutions to develop Schedule based Architectural Construction Simulation System.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.