• 제목/요약/키워드: Construction Rate

검색결과 3,643건 처리시간 0.036초

다목적 복합 센서를 이용한 건설 장비 성과율 측정 알고리즘 개발 (Development of Algorithm for Measuring Performance Rate of Construction Equipment using a Multipurpose Composite Sensor)

  • 권재범;김춘학;김창원;조대구;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.9-10
    • /
    • 2012
  • Efficient operation of construction equipment has become more and more important in the competitive construction environment. Accurate measurement of performance rate of construction equipment is a critical factor for a construction project planning. However, it might be quite difficult to measure the performance rate due to diverse practical limitations such as continuously variable performance rate of construction equipment, considerable indirect cost, large construction field, and so on. Therefore, the purpose of this paper is to propose an automatic algorithm that measures a performance rate of construction equipment with a multipurpose composite sensor. It is expected that the algorithm compiles database on construction equipment and in advance, facilitates efficient operation of construction equipment.

  • PDF

국경을 넘어선 기준금리와 건설투자 간의 관계 분석 (Cross-border Relationship Analysis Between Base Interest Rates and Construction Investment)

  • 김토성;이현수;박문서
    • 대한건축학회논문집:구조계
    • /
    • 제35권1호
    • /
    • pp.47-56
    • /
    • 2019
  • As the zero interest rate era was over with the end of quantitative easing, the economy of several global markets observed the fluctuations of the base interest rate. Interest rate, which is the change of money value with respect to time, is negatively correlated with construction investment. Considering the characteristics of interest rates and construction investment as economic variables, the necessity of cross-border analysis between base interest rate and construction investment was suggested in this paper. Cross-correlation analysis between base interest rates and construction investment crossing the border was performed. The effective correlations were confirmed with values varying by countries. Similar characteristics were also observed among countries with similar economy, which were then divided into three groups. Additionally, identifying the base interest rate that affects the construction investment of a particular country was made possible by reflecting a self-cycle of base interest rates. Lastly, from the result of examining the influence of each rise and fall of the interest rate, it was verified that the difference was more than twice as large in some countries. These results are expected to contribute to construction-related policy makers or investors to make decisions in response to the economic status of the construction market.

호주 어워드 시스템과 국내 건설공사 시중노임단가 체계 비교연구 (Comparative Study on Awards System of Australia and Wage Rate in Construction of Korea)

  • 임채연;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.70-71
    • /
    • 2018
  • The labor cost on construction project of Korea is calculated based on the Wage Rate in Construction of Korea which is published by Construction Association of Korea. The Wage Rate in Construction of Korea does not have any variation on the wage following skill level of labor although it has 123 work categories. In addition, the classification on skill level and career of construction labor in Korea does not defined. Therefore, to establish the concept of the classification on skill level and career of construction labor, this study aim to compare the difference between Wage Rate in Construction of Korea with Award system which present grade on skilled labor.

  • PDF

일반건설업의 직접시공과 하도급시공의 공사원가 및 수익성 비교분석 (The Analysis about Construction Costs and Profitability of Direction between Subcontracting Construction in General Construction Industry)

  • 황욱선;이현숙
    • 산학경영연구
    • /
    • 제19권1호
    • /
    • pp.25-34
    • /
    • 2006
  • 직접시공이나 하도급시공은 건설산업기본법에 의해 정한 시행령에 따라 시공하는 것이 원칙이나 직접시공이나 하도급시공시 수익성을 비교하여 이익 창출을 극대화하는 방향으로 의사결정이 된다. 이 연구에서는 민간공사 사례를 바탕으로 직접시공과 하도급시공의 공사원가와 수익성을 비교분석하였다. 자료 수집은 S건설에서 2002년과 2003년에 공사한 근린생활 및 단독주택을 토대로 하였다. 공사건수의 사례는 직접시공과 하도급시공 각각 3건의 공사에 의한 평균비율 값에 의하여 비교분석하였다. 이 연구의 사례를 분석한 결과, 공급가액 대비 매출총이익에 대한 수익률은 하도급시공이 직접시공 보다 1.3% 높은 수익률을 올린 것으로 분석되었다. 영업이익에 대한 수익률은 하도급시공이 직접시공보다 2.3% 높은 수익률을 올린 것으로 분석되었다. 마지막으로 하도급시공(영업이익률 11.7%)이 직접시공 공사에 대해 4대 보험료 차감후의 최종 영업 이익률이 4.4% 더 많이 발생한 것으로 분석되었다. 그러므로 건설회사는 하도급을 주는 것이 수익률이 높다는 것을 알 수 있고, 노무자 관리 또한 용이한 것으로 나타났다.

  • PDF

건설업에서 재해율과 업무상 사고 사망의 예측 및 평가 (Forecasting and Evaluation of the Accident Rate and Fatal Accident in the Construction Industries)

  • 강영식
    • 산업경영시스템학회지
    • /
    • 제40권1호
    • /
    • pp.87-94
    • /
    • 2017
  • Many industrial accidents have occurred continuously in the manufacturing industries, construction industries, and service industries of Korea. Fatal accidents have occurred most frequently in the construction industries of Korea. Especially, the trend analysis of the accident rate and fatal accident rate is very important in order to prevent industrial accidents in the construction industries systematically. This paper considers forecasting of the accident rate and fatal accident rate with static and dynamic time series analysis methods in the construction industries. Therefore, this paper describes the optimal accident rate and fatal accident rate by minimization of the sum of square errors (SSE) among regression analysis method (RAM), exponential smoothing method (ESM), double exponential smoothing method (DESM), auto-regressive integrated moving average (ARIMA) model, proposed analytic function model (PAFM), and kalman filtering model (KFM) with existing accident data in construction industries. In this paper, microsoft foundation class (MFC) soft of Visual Studio 2008 was used to predict the accident rate and fatal accident rate. Zero Accident Program developed in this paper is defined as the predicted accident rate and fatal accident rate, the zero accident target time, and the zero accident time based on the achievement probability calculated rationally and practically. The minimum value for minimizing SSE in the construction industries was found in 0.1666 and 1.4579 in the accident rate and fatal accident rate, respectively. Accordingly, RAM and ARIMA model are ideally applied in the accident rate and fatal accident rate, respectively. Finally, the trend analysis of this paper provides decisive information in order to prevent industrial accidents in construction industries very systematically.

Analysis on Tower Crane Selection in Precast Concretes Structures and its Connection with Precast Rate

  • Guo, Jingjing;Fu, Yan;Wang, Kang;Peng, Zhenyu
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.192-200
    • /
    • 2017
  • With the acceleration of construction industrialization, the buildings that China has adopted the construction of industrialization technology are increasing day by day, and Precast Concrete (PC) Structure technology is one of the main technologies of construction industrialization. Compared with the traditional cast-in-place concrete structure, PC structure is more conducive to shorten the construction period, reduce the number of construction workers and the site construction waste. Nevertheless, PC structure improves the requirements of hoisting machinery in the construction site, and the lay-out and selection of hoisting machinery become an important factor influencing the construction cost. The paper regards the typical tower crane in China as the research object, and establishes the time optimization model for the lifting scheme. The influence of the different precast rate on the selection of the tower crane is analyzed. This paper obtains the time variation of the tower crane under different precast rate, provides a theoretical basis for the design of precast concrete structures under the influence of assembly construction, and lays the foundation for the selection of tower crane under the precast rate.

  • PDF

건설업 산업재해발생률 산정·평가기준 개선방안 연구 (The study on improving the regulation for industrial accident rate level assessment of construction companies)

  • 박용규
    • 대한안전경영과학회지
    • /
    • 제18권3호
    • /
    • pp.17-24
    • /
    • 2016
  • The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.

건설폐목을 이용한 목질계보드의 시멘트응결 특성에 관한 실험적 연구 (An Experimental Study for Cement Setting Property of Wood Chip Board Using Construction Waste Wood)

  • 김세환;오세출
    • 한국건설순환자원학회논문집
    • /
    • 제3권1호
    • /
    • pp.80-86
    • /
    • 2007
  • In this study we experimented setting time and basic properties as waste wood fiber and sodium silicate substitution rate to reuse waste wood fiber produced in construction field to wood chip board. To do this construction waste woods were crushed with the size less than 10mm, mixed with the rate of 1:2, 2.5, 3, and added sodium silicate with the rate of 0, 5% of cement content. The results are as follows. As the substitution rate of construction waste wood was increased delay of setting time was also increased, and the batch of adding 5% accelerator had a 13~17 hours faster setting time than non accelerator batch. The compressive strength was lower as wood substitution rate was higher, and as the specific gravity was higher, the strength was also higher. As wood substitution rate was higher, heat conductivity was lower, and as specific gravity was higher, heat conductivity also was higher.

  • PDF

현장시공실태에 따른 방수공사 표준품셈 개정 연구 (Study on Construction-Standard-Production-Rate for Waterproof Work Based on Site Construction Status)

  • 오재훈;태용호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.304-305
    • /
    • 2018
  • Development of waterproof methods and materials resulted in the huge changes in waterproof construction materials. In consequence, the construction-standard-production-rate underwent overall revision in 2018. Especially, from the development of the specification standard and construction methods, the waterproof construction which had lower applicability in the existing construction production rate was revised. The construction methods which did not have applicability were removed. In addition, as there was a material difference based on parts, the constructionstandard-production-rate was revised by distinguishing vertical part and floor. Furthermore, by suggesting more clear work extent, the practicability in creating the standard for calculation of the estimated price in the construction field will increase.

  • PDF

INCIDENT FREQUENCY AND SEVERITY FOR CONSTRUCTION FACILITIES

  • Jong-Hyun Park;Jae-Su Jeong;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.234-240
    • /
    • 2011
  • Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.

  • PDF