• Title/Summary/Keyword: Construction Rate

Search Result 3,622, Processing Time 0.029 seconds

Development of Algorithm for Measuring Performance Rate of Construction Equipment using a Multipurpose Composite Sensor (다목적 복합 센서를 이용한 건설 장비 성과율 측정 알고리즘 개발)

  • Kwon, Jae-bum;Kim, Chun-Hak;Kim, Chang-Won;Cho, Dae-Gu;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.9-10
    • /
    • 2012
  • Efficient operation of construction equipment has become more and more important in the competitive construction environment. Accurate measurement of performance rate of construction equipment is a critical factor for a construction project planning. However, it might be quite difficult to measure the performance rate due to diverse practical limitations such as continuously variable performance rate of construction equipment, considerable indirect cost, large construction field, and so on. Therefore, the purpose of this paper is to propose an automatic algorithm that measures a performance rate of construction equipment with a multipurpose composite sensor. It is expected that the algorithm compiles database on construction equipment and in advance, facilitates efficient operation of construction equipment.

  • PDF

Cross-border Relationship Analysis Between Base Interest Rates and Construction Investment (국경을 넘어선 기준금리와 건설투자 간의 관계 분석)

  • Kim, Toseung;Lee, Hyeon-soo;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.1
    • /
    • pp.47-56
    • /
    • 2019
  • As the zero interest rate era was over with the end of quantitative easing, the economy of several global markets observed the fluctuations of the base interest rate. Interest rate, which is the change of money value with respect to time, is negatively correlated with construction investment. Considering the characteristics of interest rates and construction investment as economic variables, the necessity of cross-border analysis between base interest rate and construction investment was suggested in this paper. Cross-correlation analysis between base interest rates and construction investment crossing the border was performed. The effective correlations were confirmed with values varying by countries. Similar characteristics were also observed among countries with similar economy, which were then divided into three groups. Additionally, identifying the base interest rate that affects the construction investment of a particular country was made possible by reflecting a self-cycle of base interest rates. Lastly, from the result of examining the influence of each rise and fall of the interest rate, it was verified that the difference was more than twice as large in some countries. These results are expected to contribute to construction-related policy makers or investors to make decisions in response to the economic status of the construction market.

Comparative Study on Awards System of Australia and Wage Rate in Construction of Korea (호주 어워드 시스템과 국내 건설공사 시중노임단가 체계 비교연구)

  • Lim, Chaeyeon;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.70-71
    • /
    • 2018
  • The labor cost on construction project of Korea is calculated based on the Wage Rate in Construction of Korea which is published by Construction Association of Korea. The Wage Rate in Construction of Korea does not have any variation on the wage following skill level of labor although it has 123 work categories. In addition, the classification on skill level and career of construction labor in Korea does not defined. Therefore, to establish the concept of the classification on skill level and career of construction labor, this study aim to compare the difference between Wage Rate in Construction of Korea with Award system which present grade on skilled labor.

  • PDF

The Analysis about Construction Costs and Profitability of Direction between Subcontracting Construction in General Construction Industry (일반건설업의 직접시공과 하도급시공의 공사원가 및 수익성 비교분석)

  • Hwang, Ug-Sun;Lee, Hyun-Suk
    • Korean Business Review
    • /
    • v.19 no.1
    • /
    • pp.25-34
    • /
    • 2006
  • This research executed research that analyze construction cost and profitability through construction example of direction and subcontracting construction based on common private construction less than 3 billion. The results of this research, is summarized as follows. (1) Analyzed profitability about construction gross and operating profit of direction and subcontracting construction. The construction gross profit rate is 15.2% direction construction, subcontracting construction was analyzed by 1.3% high by 16.5% subcontracting construction, and the operating profit rate is 9.4% direction construction, subcontracting construction was construed by 2.3% high by 11.7% subcontracting construction. (2) Analyzed profitability about operating profit before and after deduction of 4 insurance cost of direction construction. The direction construction operating profit rate is 9.4% before deduction of 4 insurance cost, after deduction was construed that is 7.3% and operating profit rate difference after and before deduction was construed that is 2.1%. Therefore, subcontracting construction (operating profit rate 11.7%) was analyzed that last operating profitability after 4 insurance cost deduction produces more 4.4% about direction construction.

  • PDF

Forecasting and Evaluation of the Accident Rate and Fatal Accident in the Construction Industries (건설업에서 재해율과 업무상 사고 사망의 예측 및 평가)

  • Kang, Young-Sig
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.87-94
    • /
    • 2017
  • Many industrial accidents have occurred continuously in the manufacturing industries, construction industries, and service industries of Korea. Fatal accidents have occurred most frequently in the construction industries of Korea. Especially, the trend analysis of the accident rate and fatal accident rate is very important in order to prevent industrial accidents in the construction industries systematically. This paper considers forecasting of the accident rate and fatal accident rate with static and dynamic time series analysis methods in the construction industries. Therefore, this paper describes the optimal accident rate and fatal accident rate by minimization of the sum of square errors (SSE) among regression analysis method (RAM), exponential smoothing method (ESM), double exponential smoothing method (DESM), auto-regressive integrated moving average (ARIMA) model, proposed analytic function model (PAFM), and kalman filtering model (KFM) with existing accident data in construction industries. In this paper, microsoft foundation class (MFC) soft of Visual Studio 2008 was used to predict the accident rate and fatal accident rate. Zero Accident Program developed in this paper is defined as the predicted accident rate and fatal accident rate, the zero accident target time, and the zero accident time based on the achievement probability calculated rationally and practically. The minimum value for minimizing SSE in the construction industries was found in 0.1666 and 1.4579 in the accident rate and fatal accident rate, respectively. Accordingly, RAM and ARIMA model are ideally applied in the accident rate and fatal accident rate, respectively. Finally, the trend analysis of this paper provides decisive information in order to prevent industrial accidents in construction industries very systematically.

Analysis on Tower Crane Selection in Precast Concretes Structures and its Connection with Precast Rate

  • Guo, Jingjing;Fu, Yan;Wang, Kang;Peng, Zhenyu
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.192-200
    • /
    • 2017
  • With the acceleration of construction industrialization, the buildings that China has adopted the construction of industrialization technology are increasing day by day, and Precast Concrete (PC) Structure technology is one of the main technologies of construction industrialization. Compared with the traditional cast-in-place concrete structure, PC structure is more conducive to shorten the construction period, reduce the number of construction workers and the site construction waste. Nevertheless, PC structure improves the requirements of hoisting machinery in the construction site, and the lay-out and selection of hoisting machinery become an important factor influencing the construction cost. The paper regards the typical tower crane in China as the research object, and establishes the time optimization model for the lifting scheme. The influence of the different precast rate on the selection of the tower crane is analyzed. This paper obtains the time variation of the tower crane under different precast rate, provides a theoretical basis for the design of precast concrete structures under the influence of assembly construction, and lays the foundation for the selection of tower crane under the precast rate.

  • PDF

The study on improving the regulation for industrial accident rate level assessment of construction companies (건설업 산업재해발생률 산정·평가기준 개선방안 연구)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.17-24
    • /
    • 2016
  • The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.

An Experimental Study for Cement Setting Property of Wood Chip Board Using Construction Waste Wood (건설폐목을 이용한 목질계보드의 시멘트응결 특성에 관한 실험적 연구)

  • Kim, Sae Hoan;Oh, Sae Chool
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.3 no.1
    • /
    • pp.80-86
    • /
    • 2007
  • In this study we experimented setting time and basic properties as waste wood fiber and sodium silicate substitution rate to reuse waste wood fiber produced in construction field to wood chip board. To do this construction waste woods were crushed with the size less than 10mm, mixed with the rate of 1:2, 2.5, 3, and added sodium silicate with the rate of 0, 5% of cement content. The results are as follows. As the substitution rate of construction waste wood was increased delay of setting time was also increased, and the batch of adding 5% accelerator had a 13~17 hours faster setting time than non accelerator batch. The compressive strength was lower as wood substitution rate was higher, and as the specific gravity was higher, the strength was also higher. As wood substitution rate was higher, heat conductivity was lower, and as specific gravity was higher, heat conductivity also was higher.

  • PDF

Study on Construction-Standard-Production-Rate for Waterproof Work Based on Site Construction Status (현장시공실태에 따른 방수공사 표준품셈 개정 연구)

  • Oh, Jae-Hoon;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.304-305
    • /
    • 2018
  • Development of waterproof methods and materials resulted in the huge changes in waterproof construction materials. In consequence, the construction-standard-production-rate underwent overall revision in 2018. Especially, from the development of the specification standard and construction methods, the waterproof construction which had lower applicability in the existing construction production rate was revised. The construction methods which did not have applicability were removed. In addition, as there was a material difference based on parts, the constructionstandard-production-rate was revised by distinguishing vertical part and floor. Furthermore, by suggesting more clear work extent, the practicability in creating the standard for calculation of the estimated price in the construction field will increase.

  • PDF

INCIDENT FREQUENCY AND SEVERITY FOR CONSTRUCTION FACILITIES

  • Jong-Hyun Park;Jae-Su Jeong;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.234-240
    • /
    • 2011
  • Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.

  • PDF