A series of in-situ and laboratory tests were performed for the clayey soils of Busan area in order to develop the methods to evaluate the compressibility using CPT and DMT results. The laboratory tests show that the clayey layers of Busan areas are normally consolidated, and their compression indices are turned out to be 0.5~1.3. From the analysis of test results, correlation factors between the cone resistance and constrained modulus (${\alpha}_m$ and ${\alpha}_n$) are observed to decrease with increasing plasticity index, and the correlation factor between the dilatometer modulus and constrained modulus $(R_M)$ increases with $1/I_D$. Based on these relationships, the methods evaluating the constrained modulus from CPT and DMT results are suggested. It is shown that the prediction method by CPT underestimates the constrained modulus of improved ground, whereas the prediction method by DMT is suitable for evaluating the constrained modulus of improved and unimproved ground.
Journal of Korean Tunnelling and Underground Space Association
/
v.15
no.3
/
pp.345-356
/
2013
Numerical simulation on rock cutting by a TBM disc cutter was carried out using SPH (Smoothed Particle Hydrodynamics) code. AUTODYN3D, a commercial software program based on finite element method, was used in this study. The three-dimensional geometry of a disc cutter and a rock specimen were modeled by Lagrange and SPH code respectively. The numerical simulation was carried out for Hwangdeung granite for 10 different cutting conditions. The results of the numerical simulation, i.e. the relation between cutter force and failure behavior, had a good agreement with those from LCM test. The cutter forces measured in the numerical simulation had 10% deviation from the LCM test results. Moreover, the optimum cutter spacing was almost identical with the experimental results. These results indicate that SPH code can be successfully used had applicability for simulation on rock cutting by a TBM disc cutter. However, further study on Lagrange-SPH coupled modelling would be necessary to reduce the computation time.
Kim, Jin-Man;Kwak, Eun-Gu;Choi, Sun-Mi;Kim, Ji-Ho;Lee, Won-Young;Oh, Sang-Youn
Journal of the Korean Recycled Construction Resources Institute
/
v.6
no.4
/
pp.112-118
/
2012
Steel industry produces many by-products and wastes such as blast furnace slag, electric arc furnace slag, and converter slag. As in the case of rock, the main component of steel slag are CaO and $SiO_2$ ; further, steel slag is as alkaline as portland cement or concrete. Electric arc furnace oxidizing slag is possible to use as an aggregate for concrete ; however, it has been reclaimed because of it's expansibility caused by free CaO. Recently, a innovative rapid cooling method for melting steel slag has been developed in Korea, which reduces free lime content to minimum level and increases the stability of iron oxide. Therefore, this study describes the results of a series of research to utilize globular shape of electric arc furnace oxidizing slag fine aggregates made by rapidly cooled method for the construction industry by cooling rapidly melted slag from the steel industry. First of all, an experiment was carried out to investigate the quality characteristics of rapidly cooled electric arc furnace oxidizing slag fine aggregates in order to determine whether they can be applied to the construction industry. Then, by applying them to concrete of various particle sizes, we explored experimentally the desired condition to apply rapidly cooled electric arc furnace oxidizing slag fine aggregates to concrete.
Journal of the Korea Institute of Building Construction
/
v.16
no.4
/
pp.321-329
/
2016
The use of ternary blended cement consisting of Portland cement, granulated blast-furnace slag (GGBFS) and fly ash has been on the rise to improve marine concrete structure's resistance to chloride attack. Therefore, this study attempted to investigate changes in chloride attack resistibility of concrete through NT Build 492-based chloride migration experiments and test of concrete's ability to resist chloride ion penetration under ASTM C 1202(KS F 2271) when 1.5-2.0% of alkali-sulfate activator (modified alkali sulfate type) was added to the ternary blended cement mixtures (40% ordinary Portland cement + 40% GGBFS + 20% fly ash). Then, the results found the followings: Even though the slump for the plain concrete slightly declined depending on the use of the alkali-sulfate activator, compressive strength from day 2 to day 7 improved by 17-42%. In addition, the coefficient from non-steady-state migration experiments for the plain concrete measured at day 28 decreased by 36-56% depending on the use of alkali-sulfate. Furthermore, total charge passed according to the test for electrical indication of concrete's ability to resist chloride ion penetration decreased by 33-62% at day 7 and by 31-48% at day 28. As confirmed in previous studies, reactivity in the GGBFS and fly ash improved because of alkali activation. As a result, concrete strength increased due to reduced total porosity.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.12
/
pp.669-676
/
2018
Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.
Journal of the Korea Institute of Building Construction
/
v.19
no.6
/
pp.477-484
/
2019
The purpose of this study is to present basic data for developing concrete with EMP shielding as the structure materials when constructing an EMP shielded building structure. In order to use metal-based recycled aggregates with excellent conductivity and easy procurement for EMP shielding concrete, an evaluation of the stability evaluation and EMP shielding performance was performed. Through the stability evaluation, it was found that the coarse aggregate stability criterion was satisfied, but the oxidized slag did not satisfy the fine aggregate stability criterion, the oxidized slag is not satisfied. In addition, as a result of fresh concrete, the workability is increased and the air volume is decreased. The compressive strength is increased due to the high density and coarse granularity of the recycled aggregates, which increased the cement paste and adhesion, thereby increasing the compressive strength. The results of an EMP shielding test show that aggregates with high shielding performance are electronic arc furnace(EAF) Oxidizing Slag and Cooper Slag. The shielding performance is expected to increase if the average particle size of aggregate is small or uniformly distributed.
Noise pollution, both in the environment and in the workplace, has been recognized as a major health hazard -one that can impair not only a person's hearing but also his physical and mental well-being. As industrialization progresses, the prevalence rate of occupational diseases is increasing, especially hearing loss, which has the highest prevalence rate among the occupational diseases. The major cause of noise is the construction of various large industries without any regulation of noise sources. Therefor, we must establish an enactment to control mechanical noise sources. as soon as possible. For the purpose of controlling the noise source, we must have exact data about such things as the sound level, the frequency of the peak sound and the revolutions per minute (r.p.m.) of the machine (a measure of the power of its motor). This study was undertaken in order to define the noise characteristics, the power of the machine's motor, the change of the sound level and the peak sound as the r.p.m. increases, and the permissible exposure time. The sample size of this study was 74 machines at 11 plants in 6 industries. The results are as follows; 1. The breakdown of the types of mechanical noise noted was : 63.6% continuous normal sound, 26.9% intermittent sound, 4.7% continuous repeating sound and 4.6% impulsive sound. 2. With respect to the type of industry, the overall sound level was the highest in the mechanical industry, with $103.8{\pm}2.8dB(A)$, and lowest in the textile industry, with $89.2{\pm}1.43dB(A)$. 3. With respect to the type of machine, the highest sound level was 124 dB(A) caused by Gauzing(II), in the mechanical industry, and the lowest was 76 dB(A) caused by Attachment (Jup Chack) (I) in the timber industry. 4. The shortest permissible exposure time to Gauzing(II) in the mechanical industry was less than 15 minutes. 5. Among 74 machines, 68.2% of the peak sound was situated in the high frequency range (52.7% at 2 KHz, 4.1% at 4 KHz and 1.4% at 8 KHz). 41.8% of the peak sound was in the middle frequency range (4.1% at 250Hz, 14.8% at 500Hz and 22.9% at 1KHz). 6. If one machine had two motors or more, the peak sound was shifted to the low frequency range. 7. As the r.p.m. increased, the overall and peak sound levels were increased without any change of the frequency of the peak sound. 8. Whenever the machines had the same kind and the same r.p.m., the overall and peak sounds were changed by the physicochemical characteristics of the raw materials and the management.
It is difficult to analytically derive a volumetric displacement formula of gerotor hydraulic pump/motor because geometric shape of rotors is complicated. An analytical method about the volumetric displacement is proposed in this work, which is relatively easy and based upon two physical concepts. The first one is energy conservation between hydraulic energy of the pump/motor and mechanical input/output energy. The second concept is torque equilibrium with respect to inner and outer rotors. The formula about the volumetric displacement is derived for the common case of inner and outer rotors rotate with respect to fixed axes. The formula is verified by comparing another analytical displacement formula, and it is numerically verified by comparing numerical results, which is calculated for geometric specification of a motor. The numerical displacement is calculated through CAD software program and MATLAB program. The proposed analytical formula can be utilized in analysis and design of hydraulic gerotor motors.
Magazine of the Korean Society of Agricultural Engineers
/
v.17
no.4
/
pp.3931-3942
/
1975
This study was conducted to investigate the strength of soil cement for varied curing temperatures (0,10,20,30,40,50,60$^{\circ}C$) and cement content (3,6,9,12%) in four cement-stabilized soils (KY: sand, MH: sand, SS: sandy loam, JJ:loam). The experimental results obtained from unconfined compressive strength tests were as follows: 1. According to increase of curing temperature as 30,40,50, and 60$^{\circ}C$, the unconfiened compressive strength of soil cement increased, the rate of increase in the early curing period was large, and around 120 hours was suifficient curing time to complete hardening. 2. The strength at 10$^{\circ}C$ decreased to the rate of 30 to 40 percent than that of 20$^{\circ}C$ while the strength at 0$^{\circ}C$ was very small, strength of soil cement increased in cold weather unless that the temperature was below 0$^{\circ}C$ 3. The average maximum temperature, about 30$^{\circ}C$ during July and August in Korea may be recommended for a optimum construction period to increase the strength of soil cement. 4. Accelerated curing time that strength was equivalent to 28-Day norma1 curing decreased in accordance with the increase of curing temperature, and also accelerated curing decreased the effect of cement content. Accelerated curing that strength was equivalent to 28-day normal curing for soil cement of cement content 9% and temperature 60$^{\circ}C$ was 45 hours; KY, 50 hours: MH, 40 hours; SS, 34 hours; JJ. 5. According to the increase of the percent passing of No. 200 sieve, accelerated curing times became shorter to become the required stength. 6. Relation between accelerated curing times and normal curing days was showeda linear of which slope decreased in accordance with the increase of curing temperature, it may be expressed as follows: (1). 30$^{\circ}C$ t=3.6d+6(r=0.97) (2). 40$^{\circ}C$ t=3.2d-5.1(r=0.95) (3). 50$^{\circ}C$ t=2.1d-4.0(r=0.93) (4). 60$^{\circ}C$ t=1.4d+4.0(r=0.90) in which t=accelerate curing time. d=normal curing day. 7. Accelerated curing time that the strength was equivalent to 35kg/$\textrm{cm}^2$ which was the strength of cement brick was 96 hours at temperature 30$^{\circ}C$ to SS 9%, and 120 hours at temperature 50$^{\circ}C$ to JJ 9%, Consequently, a economic soil cement brick may be made in future.
Journal of the Korea Organic Resources Recycling Association
/
v.8
no.4
/
pp.121-128
/
2000
Landfill and lysimeter experiments were conducted to estimate the optimum air injection method for the degradation of waste in landfill and the pre-stabilization. Continuous injection with low pressure and quantity can be effective for pre-stabilization of old landfill due to the lower contents of volatile solids in landfill. Air injection and landfill gas (LFG)extraction showed that the SVE (Soil Vapor Extraction) effect by air ventilation was more significant than the biodegradation of organics. Theses results suggested that they could accelerate the biological stabilization of organic waste in landfills. It is also expected that they would reduce the problems including gas emission during the landfill mining, separation and/or transportation to such levels that might be discharged directly to the atmosphere or with minimal treatment, if required.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.