• 제목/요약/키워드: Construction Quality Management

Search Result 1,515, Processing Time 0.041 seconds

Improved Estimating Guideline for Quality Management Cost (건설공사 품질관리비 신출기준 개선방안)

  • Kim Kyoon-Tai;Ahn Bang-Ryul;Park Hyeong-Geun;Kim Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.75-83
    • /
    • 2002
  • Korea government established a domestic quality management system under the Law for Construction Technology Management, which was revised in 1997. This Law prescribes that the owner has to assign quality management cost into the construction project budget However, there are some conflicts among internal regulations and prescriptions on the scope of quality management engineer's roles was not specific. In order to overcome these limitations, this research identifies proper scope of quality management engineer's roles and suggests an approach for an improved estimating guideline for construction quality management cost.

QUALITY MANAGEMENT CONCEPTS, PRINCIPLES, TOOLS AND PHILOSOPHIES: A VALID METHODOLOGY FOR DEPLOYMENT WITHIN UK CONSTRUCTION-RELATED SMEs

  • Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.206-217
    • /
    • 2007
  • Generally, there is confusion as to what constitutes TQM, though it can be regarded as a set of concepts and tools for getting all employees focused on continuous improvement, various schools of thought have defined or classified the critical success factors as constructs, concepts and principles. Therefore the main aim of this paper is to provide a practical approach for understanding the quality management terminology. Using the existing quality management measurement instruments available in literature, the terminology used is classified into constructs, practices and finally tools or techniques. Quality Management may then be viewed as a combination of the three sets of terminology. Drawing on the quantitative study which investigated the implementation of TQM within the SME, the critical factors of TQM as used in that study as used to demonstrate the practical approach or methodology for the understanding of the terms thus used. For the benefit of practitioners within the Construction Management field, a bit of clarity is required as regards the terminology used. This study contributes to clarifying the conflicting results being reported in the quality management literature which inevitably leads to having different levels of analysis of Quality Management. Accordingly, the strength of quality management compared with other business philosophies should then focus on the practical methodology, namely the practices and techniques.

  • PDF

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

Performance Measurement of ISO Quality Management System in the Construction Industry (건설산업 ISO 품질경영시스템의 성과측정에 관한 연구)

  • Lee Woo-Chang;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.414-418
    • /
    • 2004
  • Quality system of construction industry in Korea was a means to prevent unqualified construction work. But lately, it has became an essential requirement. So, lots of construction companies acquire ISO quality management system which provides fundamental management criteria. Now, most of the Korean construction companies have got IS0 quality management system. So, getting ISO quality management system doesn't mean advantage in public competition of construction bidding and that causes increase in the maintenance cost. That's why some construction companies abandon the 150 certificate. Therefore, the authors need to check the effect of ISO quality management system. For this, the authors provide the performance measurement index of ISO quality management system.

  • PDF

A Study on Improvement of the Quality Management for Fire Doors (방화문의 현장품질관리 개선방안에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.93-94
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. In order to improve the on-site quality management of the fire door, we comprehensively classify the quality management items of the fire door according to the management subject and the step by stage and set the field quality management procedure, the field quality management inspection item, regulations and standardized checklists were presented.

  • PDF

QUALITY ASSURANCE IN ROADWAY PAVEMENT CONSTRUCTION

  • Myung Goo Jeong;Younghan Jung
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.596-601
    • /
    • 2013
  • In the current pavement construction practice, the state agencies traditionally determine the quality of the as-constructed pavement mix based on individual mixture material parameters (e.g., air voids, cement or asphalt content, aggregate gradation, etc.) and consider these parameters as key variables to influence payment schedule to the contractors and the present and future quality of the as-constructed mixture. A set of empirically pre-determined pay adjustment schedule for each parameter that was differently developed and being used by the individual agencies is then applied to a given project, in order to judge whether each parameter conforms to the designated specifications and consequently the contractor may either be rewarded or penalized in accordance with the payment schedule. With an improved quality assurance system, the Performance Related Specification, the individual parameters are not utilized as a direct judgment factor; rather, they become independent variables within a performance prediction function which is directly used to predict the performance. The quantified performance based on the prediction model is then applied to evaluate the pavement quality. This paper presents the brief history of the quality assurance in asphalt pavement construction including the Performance Related Specifications, statistical performance models in terms of fatigue and rutting distresses, as an example of the performance prediction models, and envisions the possibilities as to how this Performance Related Specification could be utilized in other infrastructures construction quality assurance.

  • PDF

A Study on the construction quality infra and it's core confidency priority for enhancing construction certification system (건설공사 품질인증시스템 향상을 위한 품질인프라 및 핵심역량 도출에 관한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.189-208
    • /
    • 2017
  • This study is for figuring out major components of construction quality infrastructure and suggesting improvement plan by benchmarking global best practice model and analyzing gap between the model and sample practice. Based on improvement plan, researcher could derive major characters and components of construction quality infrastructure, and also about the priority among core competency components of construction quality experts. The result showed that the 'human resource' was ranked the best priority followed by 'method' 'environment', 'equipment' among major characters and components of construction quality infrastructure. Also, for core competency components of construction quality experts, 'number of years in work places' was the best priority, and the 'professional knowledge on engineering' was another priority ranked. Far from general perception on competency components, 'academic education' ranked the last. It may allude that the current education system in this country is not effective in developing competency of quality engineers. In summary, this study shows professionalism of quality engineer is the most important thing in all the components.

The Improvement Plan of Quality and Organization Management through the Survey of Actual Condition in Construction Work (건설공사 실태분석을 통한 품질 및 조직관리 개선방안)

  • Choi, Byung-Ju;Choi, Seok-Woo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.213-218
    • /
    • 2007
  • Domestic by opening of world construction market with recent FTA should be achieved systematic action that of exoteric surrounding construction environment to inculcate this because consciousness structure unpreparedness of legation fields about quality is expose for hindrance factor for QI in construction spot by quality and organization management official important thing for building company's QI because conquest is possible through QI of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of change and good quality rapidly, organization's CEO determination must become side improvement the formation government official enemy, and when inspect by each process, responsible persons participate cooperation enterprise space-time. To improve this because complete charge department for quality control appears that organization management need complete charge department being expose by greatly unprepared misgovernment in heavy hydrogen building company, expense that CEO under direct control histiocyte modeling air with AHP analysis is economical will be cost, but is construed can bring excellent effect in operation management side of quality and organization such as cost-cutting effect in maintenance side and I should do so that can occupy competitive power high position with tissue at active quality complete charge deputy.

  • PDF

A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings (건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석)

  • Kim, Sung-Eun;Lee, Shin-Ja;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

Improvement of Construction Quality Management through Analyzing Construction Work's Quality Inspection Results (건설공사 품질관리 적정성 확인 점검 결과를 통한 건설 품질관리 개선방안)

  • Jung, Sangki;Park, Jungeun;Cha, Yongwoon;Han, Sangwon;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.110-118
    • /
    • 2016
  • Construction projects are getting more complex and larger-sized with a high economic growth rate and development of new construction technologies. In addition, interests and demands on standards of construction quality are further increasing. This trend requires more systematic and a higher level of construction quality management. While the government has strengthened the regulations for quality assurance, many quality problems have repeatedly occurred mainly due to lack of recognition for quality management and quality control systems. To address this issue, this paper aims to suggest quality management improvement scheme through analyzing 3,443 nonconforming items identified during inspection of 393 construction sites from March 2012 to October 2014. The quality management improvement scheme suggested in this research is expected to prevent quality problems and defects and thus improve construction performances.