• 제목/요약/키워드: Construction Project Quality

검색결과 729건 처리시간 0.024초

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

발전소 건설프로젝트 품질관리에 영향을 미치는 요인에 관한 연구 : 원전 건설 집단민원 사례를 중심으로 (A Study on the Influential Factors to Power Plant Construction Project Quality Control : Focused on Collective Civil Complaints of Nuclear Power Plant Construction)

  • 안성식;정재만
    • 품질경영학회지
    • /
    • 제46권2호
    • /
    • pp.351-374
    • /
    • 2018
  • Purpose: The collective civil complaint problem is considered as important obstructive factor of the nuclear power plant construction project's success and quality. Therefore, this study demonstrate the factors which can affect the settling collective civil complaints, and also suggest the improvement of the resolution. Methods: This study collected the data of Kori Nuclear Power Division staff, local residents and Hanul Nuclear Power Division staff, local residents, and use them for analysis. Results: The results are twofold in the study: First, the 'Situation Recognition' and 'Mutual Cooperation' which are independent variables for solving collective civil complaints have proved to give positive influence on both the nuclear staff and the local residents about the complaint resolution outcome of the dependent variable. Second, the moderation variable 'Expected Benefit' on the influential relationship between the collective civil complaint resolution factor and the civil complaints resolution outcome proved to have a moderating effect only on the nuclear staff. On the other hand, moderation variables 'Time of SOC Business Implementation' and 'Time of Compensation' proved to have a moderating effect only for the local residents. Conclusion: According to the results, the staff have a positive opinion on the benefits of the nuclear power plant construction, while residents feel strongly that they do not get any benefit from the construction despite of tremendous investment and expected benefit in local area. As this results, policy implementation which is superable different understanding is required.

Sources of Cost Saving Opportunities in Highway Construction Quality Assurance Practices

  • Uddin, Mohammad Moin;Newland, James
    • Journal of Construction Engineering and Project Management
    • /
    • 제8권1호
    • /
    • pp.1-9
    • /
    • 2018
  • US transportation agencies are dealing with shrinking budgets, limited work forces, and deteriorating infrastructure. In order to cope with funding uncertainty, state highway agencies are now looking into their own organizations and identifying programs, practices, and processes that have potential for cost saving. A quality assurance (QA) program is an integral part of highway construction and ensures a project's contracted level of quality. The cost of quality (conforming and nonconforming) can constitute a sizable part of total construction cost. As the quality assurance programs evolved, various practices and processes were developed over time and later adopted by state highway agencies. These practices and processes include different QA standards and specifications, varying testing methods, central testing lab vs. on site testing, performance based vs. prescribed quality assurance practices, implementation of innovative quality assurance practices, etc. Therefore, there is an opportunity to assess different QA strategies and recommend those practices that are effective and cost efficient. A national survey was conducted by the authors, which provided a detailed mapping of various QA practices and processes used as part of QA programs and identified areas where agencies can focus on for cost savings. The survey found that QA sampling and testing plans, optimization of sampling plans, optimization of QA standards and specifications, and implementation of innovative test methods and processes are the main areas the agencies should focus to lean the current QA programs.

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

시공단계 노출 콘크리트 품질관리 방안 (Quality Management of Exposed Concrete at Construction Phase)

  • 김태훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.164-165
    • /
    • 2016
  • To express the original texture of the concrete, exposed concrete finishing technique has been applied in many buildings. However, it is likely to cause quality problems after construction is completed. In addition, because of costs and time issues, reconstruction and maintenance works are difficult and ineffective. Therefore, step-by-step proactive quality management based on sufficient consensus among participants(client, designer, contractor) is very importatnt. This study analyzed factors causing low quality exposed concrete and quality contol points applied to 'A' headquarter construction project.

  • PDF

RESTful-API 기반의 건설현장 품질관리 시스템 개선 모델 (Improvement Model of Quality Management System of Construction Site Based on RESTful-API)

  • 박구락
    • 한국융합학회논문지
    • /
    • 제11권3호
    • /
    • pp.61-66
    • /
    • 2020
  • 산업과 IT기술의 융합으로 현대사회는 급속하게 발전하고 있으며, 그 이면에는 기본 인프라를 제공해 주는 건설 공사의 역할이 매우 크다고 할 수 있다. 최근 들어 건설공사의 복잡화 및 대형화, 첨단화에 따라 품질향상을 위한 제도 개선 등 관리의 중요성이 더욱 높아지고 있다. 그러나 건설현장에서 품질관리의 이슈가 발생할 경우 이를 해결하기 위하여 많은 시간이 소요되고 있는 것이 현실로서, 건설 프로젝트를 성공적으로 수행하기 위해서는 다양한 시스템이 유기적으로 연결되어 최적의 의사결정을 관리할 수 있는 시스템이 필요하다. 본 논문에서는 RESTful_API 기반의 GCM 푸쉬 알람 서비스를 이용한 품질관리 모델을 제안한다. 제안 모델은 건설 회사의 품질관리실과 프로젝트 매니저가 의사결정에 이용할 수 있는 모델로서, 건설현장의 프로젝트 관리에 적용할 경우 더욱 효율적이고 안전한 건설공사 관리가 가능할 것으로 기대된다.

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

리스크관리에 의한 건설안전관리의 분석 및 발전방안 (Improvement Plan and Analysis of Construction Safety Management for Risk Management)

  • 정병화;김성득
    • 한국건축시공학회지
    • /
    • 제6권4호
    • /
    • pp.53-60
    • /
    • 2006
  • Quality control and safety represent increasingly important concerns for project managers. In the worst case, failures may cause personal injuries or fatalities. Accidents during the construction process can similarly result in personal injuries and large costs. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and with effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are more likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.