• 제목/요약/키워드: Construction Project Information

검색결과 1,510건 처리시간 0.029초

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

건설정보공유를 위한 정부기관 통합 홈페이지 구축사례 연구 (Case Study of Local Government Homepage for Integrated Construction Information Management)

  • 강인석;이홍기;김현수;권중희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.563-566
    • /
    • 2006
  • 일반적으로 건설정보 통합제공은 정부차원으로 이루어지고 있으며, 전국의 산재된 현장을 관리하고 통합된 건설정보를 제공하는 정부차원의 홈페이지 구축은 미흡한 것으로 판단된다. 본 연구는 지자체 최초로 구축하고 운영되고 있는 경상남도 건설정보 통합 홈페이지 구축사례를 소개하며, 이를 통하여 건설정보 홈페이지가 갖추어야 할 기본적 기능을 제시한다. 또한 유사 건설관련 홈페이지의 컨텐츠 비교분석을 통해 건설정보를 통합적으로 제공하기 위한 주요 요구정보를 파악하였다. 본 연구에서는 향후 유사 사이트 구성을 위한 개선사항을 제안하며, 이러한 결과는 정부기관 건설정보 공유를 위한 기반정보로 활용될 수 있다.

  • PDF

특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발 (Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents)

  • 강상찬;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

USING MD CAD OBJECTS TO INTEGRATE INFORMATION FOR CONSTRUCTION PROJECTS

  • Chung-Wei Feng ;Yi-Jao Chen
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.515-519
    • /
    • 2005
  • Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.

  • PDF

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF